Projects to be Let in the Next 6 Months - By Parish
PLEASE NOTE:
Projects TENTATIVELY scheduled to be let within the next 6 months. The Letting Dates are contingent upon availability of funds and completion of all pre-construction activities.
| Parish | Letting Date |
Project | Route | Project Name | Type Improvement | Estimated Cost Range |
Length (miles) |
Project Manager | Util Clear Date |
|---|---|---|---|---|---|---|---|---|---|
| Acadia | Mar 2010 | 057-03-0051 | LA 13 | Long Point Gully Scour Repair | Scour Repair | $100,000 to $250,000 | 0.03 | Guidry, Chris | |
| Acadia | Apr 2010 | 057-02-0030 | LA 13 | 0.2mi.N.Vermilion-1.15mi.N.La92(Drr | Patch and Overlay | $500,000 to $1,000,000 | 4.10 | Chenevert, Mark | |
| Acadia | Jul 2010 | 801-29-0005 | LA1105 | La 370 - La 95 | Stabilize Base , Overlay | $1,000,000 to $2,500,000 | 2.05 | Chenevert, Mark | |
| Allen | Mar 2010 | 014-04-0052 | US 165 | Safety Imp US 165 At Boise Cascade | Intersection Improvement/Turn Lane | $500,000 to $1,000,000 | 0.28 | Picard, Toby | |
| Allen | Apr 2010 | 713-02-0121 | N Carpenter Road Bridge | Bridge Replacement | $250,000 to $500,000 | 0.00 | Pentek, Gary | ||
| Allen | May 2010 | 012-06-0050 | US 190 | Us 190 Repair/Replace Bridge Joints | Repair/Replace Bridge Joints | $0 to $100,000 | 0.24 | Seilhan, Kevin | |
| Allen | May 2010 | 066-04-0029 | LA 10 | Repair/Replace Bridge Joints | Repair/Replace Bridge Joints | $0 to $100,000 | 0.24 | Seilhan, Kevin | |
| Allen | May 2010 | 139-01-0013 | LA 113 | Us 190 - North 1.80 Miles (Drr) | Patch, Cold Plane & Overlay | $500,000 to $1,000,000 | 1.80 | Chenevert, Mark | |
| Allen | Jun 2010 | 014-04-0049 | US 165 | Oberlin North Approx 7 Miles | Patch,Cold Plane Olay,W/Shoulders | $1,000,000 to $2,500,000 | 6.42 | Chenevert, Mark | |
| Allen | Jun 2010 | 713-02-0123 | 13th Street Bridge | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| Allen | Jul 2010 | 012-07-0017 | US 190 | Us 190 (Us 165 - La 99) | Patch, Cold Plane and Overlay | $1,000,000 to $2,500,000 | 4.52 | Chenevert, Mark | |
| Ascension | Mar 2010 | 077-03-0016 | LA 73 | Us 61(N) - Ebr Parish Line | Patch and Overlay | $1,000,000 to $2,500,000 | 2.88 | Riggs, Laura | |
| Ascension | Mar 2010 | 260-01-0020 | LA 42 | Amite River Relief Bridge | Bridge Replacement | $2,500,000 to $5,000,000 | 0.40 | Guidry, Chris | Feb 2009 |
| Ascension | Apr 2010 | 265-02-0015 | LA 44 | La 44 Sidewalks | New Sidewalks | $250,000 to $500,000 | 0.01 | Horton, Valerie | |
| Ascension | May 2010 | 077-02-0020 | LA 73 | La 73 Widening (Us 61 - I-10) | Widen to 3-lanes and Urban Drainage | $20,000,000 to $30,000,000 | 2.32 | Burst, Jeffery | Mar 2010 |
| Ascension | May 2010 | 803-27-0007 | LA 941 | La 941 Over I-10 Girder Repair | Girder Repair | $500,000 to $1,000,000 | 0.09 | Brauner, Kurt | |
| Ascension | Jun 2010 | 803-19-0010 | LA 932 | La 931- 0.1 Miles North Of La 933 | Superpave Asphaltic Concrte Overlay | $1,000,000 to $2,500,000 | 2.16 | Chenevert, Mark | |
| Assumption | Jul 2010 | 742-04-0100 | Assumption Pr.Police Jury Sr2s | Sidewalks and Ped. Bridge Imp. | $250,000 to $500,000 | 0.00 | Parsons, Brian | ||
| Avoyelles | Mar 2010 | 374-03-0022 | LA 451 | Pomme De Terre Reserve - La 1 | Patch and Overlay | $1,000,000 to $2,500,000 | 7.88 | Chenevert, Mark | |
| Avoyelles | Mar 2010 | 713-05-0115 | Moreauville City Bridge | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| Avoyelles | Jun 2010 | 008-07-0032 | US 71 | S.Bunkie City Limits - RR Overpass | Patch, Cold Plane and Overlay | $1,000,000 to $2,500,000 | 2.58 | Chenevert, Mark | |
| Avoyelles | Jul 2010 | 374-03-0023 | LA 451 | Iron Bridge Xing-4.6 Mi E. Pete Lab | Patch and Overlay | $1,000,000 to $2,500,000 | 6.70 | Chenevert, Mark | |
| Beauregard | May 2010 | 028-01-0011 | US 190 | Us 190 Repair/Replace Bridge Joints | Repair/Replace Bridge Joints | $0 to $100,000 | 0.13 | Seilhan, Kevin | |
| Beauregard | May 2010 | 139-02-0014 | LA 113 | Allen Ph. Line - Dry Creek Br.(Drr) | Patch, Cold Plane & Overlay | $500,000 to $1,000,000 | 4.06 | Chenevert, Mark | |
| Beauregard | May 2010 | 139-03-0019 | LA 113 | 0.11 Mi.S.Inez Cole Rd-la 26 (Drr) | Patch, Cold Plane & Overlay | $500,000 to $1,000,000 | 2.90 | Chenevert, Mark | |
| Beauregard | May 2010 | 190-01-0024 | LA 110 | .21m E Wunsch Rd-3.31m E Wunsch Rd. | Overlay | $500,000 to $1,000,000 | 3.10 | Chenevert, Mark | |
| Beauregard | May 2010 | 190-02-0020 | LA 110 | Andy Havens Rd.- St.Germain Rd. | Patch, Cold Plane & Overlay | $500,000 to $1,000,000 | 5.00 | Chenevert, Mark | |
| Beauregard | May 2010 | 190-02-0021 | LA 110 | .48mi W Col Perry Brn Rd-wildcow Br | Cold Plane, Overlay, Repl Guardrail | $500,000 to $1,000,000 | 3.69 | Chenevert, Mark | |
| Beauregard | Jul 2010 | 188-01-0011 | LA 112 | La 112 ( Us171 - La 399) | Patch,Coldplane,Overlay | $2,500,000 to $5,000,000 | 10.49 | Chenevert, Mark | |
| Bienville | Mar 2010 | 451-04-0059 | I 20 | I-20 At La 154 Eb/Wb Accel Lane Ext | Extend Acceleration Lane/Exist Ramp | $250,000 to $500,000 | 0.73 | Baugh, Sam | |
| Bienville | May 2010 | 043-05-0024 | LA 151 | La 151 @ La 798-2 Intersection Imp | Intersection Improvements | $0 to $100,000 | 0.04 | Drake, Bill | |
| Bienville | May 2010 | 451-04-0058 | I 20 | I-20 @ La 151 Eb/Wb Accel Lane Ext | Extend Acceleration Lane/Exist Ramp | $250,000 to $500,000 | 0.63 | Baugh, Sam | |
| Bienville | Jun 2010 | 093-03-0015 | LA 155 | La 4 - La 796 | Widen and Overlay | $1,000,000 to $2,500,000 | 6.40 | Chenevert, Mark | |
| Bienville | Jul 2010 | 089-30-0018 | LA 517 | La 9 - La 154 | Widen and Overlay | $2,500,000 to $5,000,000 | 6.05 | Chenevert, Mark | |
| Bossier | Mar 2010 | 742-08-0007 | Stockwell Road | Reconstruction and Rehabilitation | $1,000,000 to $2,500,000 | 2.10 | Riggs, Laura | ||
| Bossier | Mar 2010 | 742-08-0008 | Concrete Panel Rep.Green Acres Bv | Concrete Panel Replacement | $500,000 to $1,000,000 | 0.01 | Riggs, Laura | ||
| Bossier | May 2010 | 010-30-0032 | LA 72 | La 72 At I-20 Intersection Improvmt | Intersection Improvements | $250,000 to $500,000 | 0.07 | Drake, Bill | |
| Bossier | May 2010 | 742-08-0005 | Bossier Pr.School Board Sr2s Proj. | Sidewalks,Crossings,Bike Rack,Etc. | $250,000 to $500,000 | 0.00 | Parsons, Brian | ||
| Bossier | May 2010 | 808-05-0010 | LA 537 | Stillhouse Bayou Bridge | Bridge Replacement | $1,000,000 to $2,500,000 | 0.04 | Yap, Kian | Sep 2008 |
| Bossier | Jun 2010 | 082-05-0007 | LA 157 | Midway - Ivan | Widen, Overlay | $2,500,000 to $5,000,000 | 7.22 | Chenevert, Mark | |
| Bossier | Jun 2010 | 085-04-0013 | LA 160 | La 160 Bridges,Caney Cr.& Bodcau B. | Bridge Replacement; B-list Project | $5,000,000 to $7,500,000 | 0.50 | Rabalais, Nick | Jun 2008 |
| Bossier | Jul 2010 | 010-06-0069 | US 71 | La 612 - La 3032(N.B. Lanes Only) | Mill and Overlay | $1,000,000 to $2,500,000 | 5.01 | Chenevert, Mark | |
| Bossier | Jul 2010 | 085-03-0015 | LA 160 | La 3 - Rocky Mount | Mill,Overlay | $1,000,000 to $2,500,000 | 6.25 | Chenevert, Mark | |
| Bossier | Jul 2010 | 121-01-0026 | LA 527 | Us 71 - La 157 | Overlay | $1,000,000 to $2,500,000 | 6.12 | Chenevert, Mark | |
| Caddo | Mar 2010 | 742-09-0109 | Woolworth Rd (Colquitt - S'port Cl) | Overlay | $500,000 to $1,000,000 | 0.01 | Riggs, Laura | ||
| Caddo | Apr 2010 | 025-09-0005 | LA3094 | Twelve Mile Bayou Bridge Rehab. | Bridge Rehab. | $1,000,000 to $2,500,000 | 0.11 | Bucci, Mark | |
| Caddo | Apr 2010 | 094-01-0045 | LA 173 | La 173 Improvements | Add Sb Acceleration Lane | $500,000 to $1,000,000 | 0.06 | Baugh, Sam | |
| Caddo | Apr 2010 | 737-94-0030 | Shreveport Near-term ITS (Phase 3a) | S'port/Bossier ITS Near Term Phs 3a | $5,000,000 to $7,500,000 | 0.00 | Delaney, Elizabeth | ||
| Caddo | May 2010 | 455-09-0003 | I 49 | I-49 North (La 1 - La 173) Seg I | New Interstate | $50,000,000 to $70,000,000 | 5.53 | Umeozulu, Joe | Jan 2010 |
| Caddo | Jun 2010 | 102-02-0042 | LA 511 | La 511 Street Lighting | Add Street Lighting At La 511 & 526 | $0 to $100,000 | 0.23 | Baugh, Sam | |
| Caddo | Jun 2010 | 455-09-0005 | I 49 | I-49 North (La 530 - La 170) Seg F | New Interstate (Segment F) | $20,000,000 to $30,000,000 | 3.29 | Umeozulu, Joe | Mar 2010 |
| Caddo | Jun 2010 | 737-09-0102 | LA 526 | Shreveport Immediate ITS Phase 2 | Its/Emergency Operation | $2,500,000 to $5,000,000 | 0.01 | Delaney, Elizabeth | |
| Caddo | Jul 2010 | 025-08-0066 | US 171 | La 3132 - La 511 | Mill and Overlay | $1,000,000 to $2,500,000 | 2.25 | Chenevert, Mark | |
| Caddo | Jul 2010 | 045-01-0031 | LA 1 | Us 71 - La 538 | Mill, Inlay Overlay | $1,000,000 to $2,500,000 | 3.33 | Chenevert, Mark | |
| Caddo | Aug 2010 | 053-09-0053 | LA 1 | La 1 (Youree Dr) At La 3032 (Kings) | Intersection Improvement | $5,000,000 to $7,500,000 | 0.94 | Riggs, Laura | Aug 2007 |
| Calcasieu | Mar 2010 | 450-91-0181 | I 10 | I-10 Calcasieu Riv Bridg Visibility | Install Delineators & Striping | $100,000 to $250,000 | 1.25 | Cormier, Clayton | |
| Calcasieu | Mar 2010 | 742-10-0142 | W Mcneese | Overlay | $500,000 to $1,000,000 | 0.52 | Waguespack, Brent | ||
| Calcasieu | Mar 2010 | 742-10-0143 | Weaver | Overlay | $1,000,000 to $2,500,000 | 2.05 | Waguespack, Brent | ||
| Calcasieu | Mar 2010 | 742-10-0145 | Hodges | Overlay | $500,000 to $1,000,000 | 1.13 | Waguespack, Brent | ||
| Calcasieu | Mar 2010 | 810-24-0048 | US 90X | Broad Street | Overlay | $1,000,000 to $2,500,000 | 2.00 | Waguespack, Brent | |
| Calcasieu | Apr 2010 | 193-06-0039 | LA 14 | La 14 Concrete Pavement Replacement | Concrt Panel Replacement & Patching | $5,000,000 to $7,500,000 | 1.25 | Waguespack, Brent | |
| Calcasieu | Apr 2010 | 382-04-0054 | LA 384 | Black Bayou - Duke Road | Patch, Overlay | $1,000,000 to $2,500,000 | 4.77 | Chenevert, Mark | |
| Calcasieu | Apr 2010 | 744-10-0022 | Dequincy Rail Car Shed Coverings | Enhancement Project | $0 to $100,000 | 0.01 | Horton, Valerie | ||
| Calcasieu | May 2010 | 024-01-0052 | LA 171 | Repair/Replace Bridge Joints | Repair/Replace Bridge Joints | $100,000 to $250,000 | 1.98 | Seilhan, Kevin | |
| Calcasieu | May 2010 | 031-04-0048 | LA 27 | I-10 & La 27 Bridge Repairs | Repair/Replacement Of Bridge Joints | $0 to $100,000 | 0.01 | Seilhan, Kevin | |
| Calcasieu | May 2010 | 450-30-0069 | I 210 | I-210 Signing(I-10east - I-10west) | Interstate Signing | $5,000,000 to $7,500,000 | 0.01 | Harrouch, Joshua | |
| Calcasieu | May 2010 | 450-91-0149 | I 10 | La 1256 - W.End Of Calcasieu R. Br. | Signing(La 108 Sulphur- US 90 W.L.) | $1,000,000 to $2,500,000 | 0.01 | Harrouch, Joshua | |
| Calcasieu | May 2010 | 742-10-0114 | Elliot Rd @ Gauthier | Add Turn Lanes and Signals | $1,000,000 to $2,500,000 | 0.00 | Waguespack, Brent | Mar 2009 | |
| Calcasieu | May 2010 | 810-25-0010 | LA3063 | La 109 - West St | Widen and Overlay | $1,000,000 to $2,500,000 | 3.06 | Chenevert, Mark | |
| Calcasieu | May 2010 | 810-28-0019 | LA3092 | La 384 - 0.135 Mi S Lake Ridge Lane | Overlay | $100,000 to $250,000 | 0.70 | Chenevert, Mark | |
| Calcasieu | Jun 2010 | 450-30-0076 | I 210 | I-210 Prien Lake Pier | Prien Lake Pier Protection Rehab | $30,000,000 to $50,000,000 | 0.01 | Fossier, Paul | |
| Calcasieu | Jun 2010 | 450-91-0173 | I 10 | Pedestrian O'pass-la 108 | Cp & Overlay & Transition Reconst. | $7,500,000 to $10,000,000 | 2.73 | Thomas, Ben | |
| Calcasieu | Jul 2010 | 197-02-0022 | LA 383 | Second St. - Union Pacific Railroad | Subbas, Base Reconst., Overlay | $500,000 to $1,000,000 | 0.20 | Chenevert, Mark | |
| Calcasieu | Jul 2010 | 810-31-0007 | LA3258 | Granger St. - East Park Rd. | Patch, Cold Plane, & Overlay | $250,000 to $500,000 | 0.46 | Chenevert, Mark | |
| Calcasieu | Aug 2010 | 195-04-0021 | LA 385 | La 385 @ La 1138-2 In L.C. | Reconstruction | $1,000,000 to $2,500,000 | 0.10 | Waguespack, Brent | Oct 2008 |
| Calcasieu | Aug 2010 | 195-04-0026 | LA 385 | Coulee Bridge | Bridge Replacement | $1,000,000 to $2,500,000 | 0.07 | Moore, Darrell | Mar 2010 |
| Calcasieu | Aug 2010 | 195-04-0029 | LA 385 | La 384 @ La 385 | Intersection Improvements | $1,000,000 to $2,500,000 | 0.30 | Thevis, Tyson | Jun 2007 |
| Caldwell | Jul 2010 | 068-04-0032 | LA 4 | Jackson Ph Line - Buckskin Road | Ast | $1,000,000 to $2,500,000 | 18.50 | Chenevert, Mark | |
| Caldwell | Jul 2010 | 166-01-0027 | LA 561 | La 133 - Richland Line | Ast | $0 to $100,000 | 0.84 | Chenevert, Mark | |
| Caldwell | Jul 2010 | 171-01-0010 | LA 133 | La 561 - La 847 | Ast | $0 to $100,000 | 1.65 | Chenevert, Mark | |
| Caldwell | Jul 2010 | 345-04-0015 | LA 506 | Us 165 - La 849 | Ast | $100,000 to $250,000 | 3.02 | Chenevert, Mark | |
| Caldwell | Jul 2010 | 347-01-0009 | LA 848 | La 561 - End Of Control | Ast | $100,000 to $250,000 | 4.78 | Chenevert, Mark | |
| Caldwell | Jul 2010 | 811-06-0007 | LA 849 | La 506 - La 126 | Ast | $100,000 to $250,000 | 3.20 | Chenevert, Mark | |
| Cameron | Apr 2010 | 055-02-0005 | LA 14 | La 14 (Cslm 0.00 - Cslm 2.45) | Patch, Cold Plane & Overlay | $500,000 to $1,000,000 | 2.45 | Chenevert, Mark | |
| Cameron | Apr 2010 | 195-30-0055 | LA 384 | Grand Lake Pontoon Bridge | New Hydraulic Winch System | $250,000 to $500,000 | 0.01 | Harter, John | |
| Cameron | May 2010 | 031-01-0069 | LA 27 | Cameron Ferry - Holly Beach | Patch, Cold Plane, and Overlay | $2,500,000 to $5,000,000 | 7.90 | Chenevert, Mark | |
| Cameron | May 2010 | 193-02-0046 | LA 27 | I-10 & La 27 Bridge Repairs | Repair/Replacement Of Bridge Joints | $0 to $100,000 | 0.01 | Seilhan, Kevin | |
| Catahoula | Mar 2010 | 813-27-0006 | LA 927 | 0.09 Mi E.Us 84 - 0.10 Mi E.La 124 | Cold Plane,Patch,Asphalt Conc Olay | $500,000 to $1,000,000 | 0.92 | Chenevert, Mark | |
| Catahoula | Jul 2010 | 041-02-0029 | LA 124 | Rawsom Creek - Boothe Rd. | Stabilize Base and Overlay | $2,500,000 to $5,000,000 | 5.26 | Chenevert, Mark | |
| Catahoula | Jul 2010 | 041-03-0022 | LA 124 | La 559 - La 126 | Stabalize and Overlay | $2,500,000 to $5,000,000 | 6.34 | Chenevert, Mark | |
| Claiborne | Mar 2010 | 085-07-0014 | LA 2 | Homer Bypass Paving | (Needs State Funding) | $10,000,000 to $15,000,000 | 3.91 | Guest, Debra | |
| Claiborne | Jul 2010 | 027-06-0033 | US 79 | Log Mile 10.94 - Spring Drive | Mill and Overlay | $1,000,000 to $2,500,000 | 2.87 | Chenevert, Mark | |
| Concordia | Apr 2010 | 177-30-0025 | LA 131 | Gillispie St. - US 425 (P.M.) | Minor PCCP Patch | $0 to $100,000 | 0.51 | Broadbent, Ronald | |
| Concordia | Jun 2010 | 177-05-0033 | LA 15 | 6.5 Mi.N.Of La 565-1.0 Mi.S. La 131 | Cold Plane & Overlay | $250,000 to $500,000 | 1.30 | Chenevert, Mark | |
| Concordia | Jul 2010 | 178-02-0022 | LA 129 | La 907 -la 565 | Patch and Overlay | $1,000,000 to $2,500,000 | 4.98 | Chenevert, Mark | |
| DeSoto | Mar 2010 | 099-03-0012 | LA 191 | Northern Trailhead Project | Trailhead Sign, Lighting, Landscape | $100,000 to $250,000 | 0.01 | Horton, Valerie | |
| DeSoto | May 2010 | 106-01-0010 | LA 177 | La 175 - La 346 | Ac Overlay | $1,000,000 to $2,500,000 | 7.30 | Chenevert, Mark | |
| DeSoto | Jul 2010 | 297-01-0012 | LA 764 | Us 84(Logansport) - .24 Mi.N.La 765 | Widen and Overlay | $1,000,000 to $2,500,000 | 3.65 | Chenevert, Mark | |
| District 04 | Apr 2010 | 737-94-0065 | District 04 Centerline Rumble Strip | Rumble Strips and Pavement Markings | $1,000,000 to $2,500,000 | 0.01 | Allain, Peter | ||
| District 05 | May 2010 | 737-95-0037 | Bridge Repaird District 05 | Joint Repairs Interstate,Us&la Rts. | $500,000 to $1,000,000 | 0.00 | Colquette, Paul | ||
| District 08 | May 2010 | 737-98-0038 | District 08 Pavement Marking Replac | Pavement Marking Replacement | $1,000,000 to $2,500,000 | 0.00 | Allain, Peter | ||
| District 62 | Jun 2010 | 737-90-0083 | Dist 62 Paint Girder Ends & Bearing | Paint Girder Ends & Bearings | $250,000 to $500,000 | 0.00 | Schilling, Allison | ||
| East Baton Rouge | Mar 2010 | 742-17-0165 | Cent Thruw (Fl Bl-s End Sullivan Br | Paving | $5,000,000 to $7,500,000 | 0.01 | Riggs, Laura | ||
| East Baton Rouge | Apr 2010 | 414-01-0040 | LA 30 | Nicholson Drive Landscape Corridor | Landscape | $100,000 to $250,000 | 0.01 | Horton, Valerie | |
| East Baton Rouge | May 2010 | 060-01-0043 | LA 67 | .8mi S.La 423-la 423 & La423-la3006 | Minor PCCP Patching | $250,000 to $500,000 | 2.01 | Broadbent, Ronald | |
| East Baton Rouge | May 2010 | 737-17-0016 | River Rd Levee Shared Use Trail Ph2 | B.R. Levee Bike Path | $500,000 to $1,000,000 | 0.00 | Horton, Valerie | ||
| East Baton Rouge | Jun 2010 | 600-90-0166 | Emergency Operation Backup Ac Unit | Hqtrs Annex Back-up A/C Unit | $250,000 to $500,000 | 0.00 | Drake, Bill | ||
| East Baton Rouge | Jun 2010 | 742-17-0155 | Jones Creek Road Improvement | Clearing & Grubbing | $250,000 to $500,000 | 0.01 | Porta, Buddy | ||
| East Baton Rouge | Jul 2010 | 742-17-0153 | S.Harrell's Ferry @ S.Sherwood Blvd | Intersection Improvement | $1,000,000 to $2,500,000 | 0.00 | Riggs, Laura | Feb 2010 | |
| East Carroll | Apr 2010 | 713-18-0109 | Goat Road Bridge | Bridge Replacement | $250,000 to $500,000 | 0.00 | Pentek, Gary | ||
| East Feliciana | Apr 2010 | 713-19-0112 | Cheathams Run/Devalcourt Rd Bridge | Bridge Replacement | $250,000 to $500,000 | 0.00 | Pentek, Gary | ||
| East Feliciana | Jun 2010 | 061-05-0050 | LA 10 | La 68 - Clinton(W.Sect.) | Recon W/Geometric Improvements | $10,000,000 to $15,000,000 | 5.50 | Toney, Patrick | |
| Evangeline | Mar 2010 | 203-02-0022 | LA 29 | Coulee De Manuel Scour Repair | Scour Repair | $100,000 to $250,000 | 0.02 | Guidry, Chris | |
| Evangeline | Apr 2010 | 012-10-0018 | US 190 | Acadia Ph Line - St.Landry Ph Line | Patch and Overlay | $5,000,000 to $7,500,000 | 7.63 | Chenevert, Mark | |
| Franklin | Apr 2010 | 026-06-0063 | US 425 | Random Crack Seal In Winnsboro (Pm) | Random Crack Seal | $0 to $100,000 | 1.81 | Broadbent, Ronald | |
| Franklin | Apr 2010 | 026-07-0029 | US 425 | Random Crack Seal In Winnsboro (Pm) | Random Crack Seal | $0 to $100,000 | 1.31 | Broadbent, Ronald | |
| Franklin | Jul 2010 | 036-02-0033 | LA 4 | Scriber Rd - 0.5 Mi.W. La 135 | Widen,Stabilize and Overlay | $1,000,000 to $2,500,000 | 1.00 | Chenevert, Mark | |
| Franklin | Jul 2010 | 036-02-0034 | LA 4 | 2 Mi. W. Caldwell Ph.Line - La 562 | Stabilize Base and Overlay | $2,500,000 to $5,000,000 | 5.17 | Chenevert, Mark | |
| Franklin | Jul 2010 | 821-09-0014 | LA 875 | Rawson Creek - Booth Road | Ast | $500,000 to $1,000,000 | 2.65 | Chenevert, Mark | |
| Franklin | Aug 2010 | 169-01-0027 | LA 130 | La 425 - Polk Street | Minor Overlay | $250,000 to $500,000 | 0.60 | Broadbent, Ronald | |
| Grant | Jun 2010 | 023-03-0023 | US 167 | Jct. La 123 - Jct. La 472 | Cold Plane and Overlay | $2,500,000 to $5,000,000 | 6.24 | Chenevert, Mark | |
| Grant | Jul 2010 | 076-02-0019 | LA 123 | La 123 - La 524 Sight Flare Imp. | Sight Flare Improvement | $0 to $100,000 | 0.30 | Hicks, Melvin | |
| Grant | Jul 2010 | 129-01-0023 | LA 122 | La 122-la 1240 Sight Flare Imp. | Sight Flare Improvements | $0 to $100,000 | 0.14 | Hicks, Melvin | |
| Iberia | Apr 2010 | 004-04-0026 | LA 182 | St Martin P/L-0.2 Mi East Of La 674 | Patch and Overlay | $500,000 to $1,000,000 | 3.11 | Chenevert, Mark | |
| Iberia | Apr 2010 | 823-15-0017 | LA 677 | La 677 (La 31 - Cslm 1.4) | Patch and Overlay | $100,000 to $250,000 | 0.80 | Chenevert, Mark | |
| Iberia | May 2010 | 241-01-0015 | LA 671 | La 671 @ Bayou Teche | Electrical System Rehab | $500,000 to $1,000,000 | 0.01 | Reed, Kevin | |
| Iberia | Jun 2010 | 399-02-0015 | LA 671 | Us 90 - La 182 | Base Replacement | $7,500,000 to $10,000,000 | 1.80 | Draughon, Steve | Mar 2010 |
| Iberia | Jun 2010 | 424-04-0055 | US 90 | Us 90 Service Roads - Capt Cade Rd. | New Asphalt Pavement | $1,000,000 to $2,500,000 | 0.50 | Draughon, Steve | |
| Iberia | Jun 2010 | 823-42-0005 | LA3156 | Bayou Teche Bridge(Jeff. St.) | Bridge Replacement | $7,500,000 to $10,000,000 | 0.04 | Yap, Kian | Nov 2007 |
| Iberia | Jul 2010 | 823-31-0005 | LA 680 | La 86 - St.Martin Parish Line | Patch,Cold Plane, Overlay | $500,000 to $1,000,000 | 1.51 | Chenevert, Mark | |
| Iberville | Mar 2010 | 824-06-0024 | LA 405 | 713' S Of Stewart St-1.24 Mi S La 1 | Stabilize Base and Overlay | $2,500,000 to $5,000,000 | 5.82 | Chenevert, Mark | |
| Iberville | Mar 2010 | 824-06-0025 | LA 405 | 1.24 Miles South Of La 1 - La 1 | Stabilize and Overlay | $500,000 to $1,000,000 | 1.24 | Chenevert, Mark | |
| Iberville | Jun 2010 | 257-01-0017 | LA 75 | Saint Gabriel Sidewalks, Phase 2 | New Sidewalks & 2 Ped Bridges | $500,000 to $1,000,000 | 0.01 | Horton, Valerie | |
| Jackson | Mar 2010 | 713-25-0105 | Country Road Bridge | Bridge Replacement | $250,000 to $500,000 | 0.00 | Pentek, Gary | ||
| Jefferson | Mar 2010 | 063-04-0039 | LA 18 | La 18 (Avondale - St.Charles Ph Ln | Drainage Improvements | $250,000 to $500,000 | 6.97 | Nilforoushan, Mehdi | |
| Jefferson | Mar 2010 | 450-15-0137 | I 10 | Clearview to Causeway&clearview Int | Joint Repair & Overlay | $500,000 to $1,000,000 | 1.70 | Thomas, Ben | |
| Jefferson | Mar 2010 | 742-26-0053 | Lapalco (Manhattan Blvd - B. Fatma) | Overlay | $1,000,000 to $2,500,000 | 0.34 | Riggs, Laura | ||
| Jefferson | Mar 2010 | 826-05-0016 | LA 541 | La 541(E.Jct La 18-bridge City Ave) | Cold Plane and Overlay | $500,000 to $1,000,000 | 4.32 | Chenevert, Mark | |
| Jefferson | Apr 2010 | 005-10-0039 | US 90 | Us 90(St Char Line-sw End Of Opass) | Patch, Cold Plane & Overlay | $2,500,000 to $5,000,000 | 5.90 | Chenevert, Mark | |
| Jefferson | May 2010 | 249-90-0042 | LA 45 | Jean Lafitte (La 3134-pipeline St) | Patch, Cold Plane & Overlay | $1,000,000 to $2,500,000 | 4.30 | Chenevert, Mark | |
| Jefferson | May 2010 | 283-09-0137 | US 90 | Us 90(1.25 M W Of La 45-us 90b Exit | Patch, Cold Plane & Overlay | $2,500,000 to $5,000,000 | 3.40 | Chenevert, Mark | |
| Jefferson | May 2010 | 283-09-0141 | US 90 | Us90b Service Rds At Farrington Dr | Intersection Improvements | $250,000 to $500,000 | 0.10 | Drake, Bill | |
| Jefferson | May 2010 | 283-30-0026 | LA 49 | Williams Blvd.(U Pass I-10 - US 61) | Patch, Clod Plane & Overlay | $1,000,000 to $2,500,000 | 1.90 | Chenevert, Mark | |
| Jefferson | May 2010 | 450-15-0140 | I 10 | I-10(E.End Bonnet Carre-orleans P/L | Pavement Markings Replacement | $100,000 to $250,000 | 0.01 | Allain, Peter | |
| Jefferson | May 2010 | 450-15-0143 | I 10 | I10 @ Airprt Access Rd Entrnce Ramp | Level Approach Slab | $0 to $100,000 | 0.04 | Drake, Bill | |
| Jefferson | Jul 2010 | 062-01-0031 | LA 18 | Fourth St. - US 90 Bus. | Cold Plane and Overlay | $1,000,000 to $2,500,000 | 0.50 | Chenevert, Mark | |
| Jefferson | Jul 2010 | 063-02-0056 | LA 18 | Weyer Ave - La 560-2 | Cold Plane and Overlay | $0 to $100,000 | 2.31 | Branton, Jennifer | |
| Jefferson | Jul 2010 | 742-26-0066 | Segnette Blvd.(Lapalco Blvd-us 90b) | Overlay | $2,500,000 to $5,000,000 | 0.00 | Riggs, Laura | Nov 2008 | |
| Jefferson | Aug 2010 | 064-01-0046 | LA 1 | La 1 Patch & Olay Repair From Ike | Patch and Overlay | $1,000,000 to $2,500,000 | 4.10 | Drake, Bill | |
| Jefferson | Aug 2010 | 249-01-0055 | LA 45 | Barataria Widening (Lapalco - Ames) | Add 2 Additional Travel Lanes | $5,000,000 to $7,500,000 | 1.75 | Chenevert, Mark | |
| Jefferson Davis | Mar 2010 | 003-08-0025 | US 90 | Us 90 East Of Jennings | Patch, Cold Plane & Overlay | $500,000 to $1,000,000 | 2.30 | Chenevert, Mark | |
| Jefferson Davis | May 2010 | 198-02-0022 | LA 99 | La 380 - US 90 | Base Reconstruction & Overlay | $2,500,000 to $5,000,000 | 9.70 | Chenevert, Mark | |
| Jefferson Davis | May 2010 | 198-30-0007 | LA 99 | La 14 - La 380 | Patch & Overlay | $250,000 to $500,000 | 2.00 | Chenevert, Mark | |
| Jefferson Davis | May 2010 | 199-01-0007 | LA 102 | .038 Mi E US 167 - La 99 | Cold Plane & Overlay | $100,000 to $250,000 | 7.31 | Chenevert, Mark | |
| Jefferson Davis | May 2010 | 199-01-0011 | LA 102 | 0.50 Mi E US 165-0.35 Mi W La 99 | Patch & Overlay | $1,000,000 to $2,500,000 | 6.50 | Chenevert, Mark | |
| Jefferson Davis | Jun 2010 | 054-05-0024 | LA 26 | 0.25 Mi.N.Trailer Town Rd-state St. | Cold-plane,Patch,Stab Shlds,Overlay | $1,000,000 to $2,500,000 | 1.40 | Chenevert, Mark | |
| Jefferson Davis | Jul 2010 | 054-04-0026 | LA 26 | La 26 (Us 190 - La 102) | Patch,Cold-plane,Overlay,Stab.Sho. | $2,500,000 to $5,000,000 | 9.07 | Chenevert, Mark | |
| Jefferson Davis | Jul 2010 | 827-11-0010 | LA 382 | La 382 (Cslm 2.74 - Cslm 7.38) | Cold-plane,Stab Shlds,Overlay | $1,000,000 to $2,500,000 | 4.64 | Chenevert, Mark | |
| Jefferson Davis | Jul 2010 | 827-22-0008 | LA 395 | La 395 (Us 90 - La 102_) | Patch, Cold Plane, & Overlay | $1,000,000 to $2,500,000 | 8.45 | Chenevert, Mark | |
| Lafayette | Mar 2010 | 003-11-0035 | LA 182 | North Univ(La 182) @ Cameron(Us 90) | Intersection Improvements | $100,000 to $250,000 | 0.16 | Waguespack, Brent | |
| Lafayette | Mar 2010 | 032-01-0039 | LA 182 | .1mi.N.La 723 -.91mi.N.La 723 (Drr) | Stabilize Base and Overlay | $500,000 to $1,000,000 | 0.90 | Chenevert, Mark | |
| Lafayette | Mar 2010 | 032-01-0040 | LA 182 | I-49 Underpass - St.Landry P/L(Drr) | Patch and Overlay | $100,000 to $250,000 | 0.60 | Chenevert, Mark | |
| Lafayette | Mar 2010 | 032-01-0041 | LA 182 | University Ave (La 182) | Overlay | $2,500,000 to $5,000,000 | 5.52 | Waguespack, Brent | |
| Lafayette | Mar 2010 | 080-03-0022 | LA 94 | Pinhook @ Carmel (La 94) | Intersection Improvements | $250,000 to $500,000 | 0.01 | Waguespack, Brent | |
| Lafayette | Mar 2010 | 218-30-0007 | LA 724 | Jct Local Rd (Althea Dr) -jct US 90 | Overlay | $1,000,000 to $2,500,000 | 3.70 | Waguespack, Brent | |
| Lafayette | Mar 2010 | 828-14-0026 | LA 733 | Anselm Coulee Scour Repair | Scour Repair | $250,000 to $500,000 | 0.02 | Guidry, Chris | |
| Lafayette | Mar 2010 | 828-14-0027 | LA 733 | Jct. US 167 - Jct. La 92 | Stabilize Base and Overlay | $2,500,000 to $5,000,000 | 4.43 | Chenevert, Mark | |
| Lafayette | Apr 2010 | 213-05-0035 | LA 92 | Roundabout At Int. Of La 339 & La92 | Roundabouts | $500,000 to $1,000,000 | 0.06 | Draughon, Steve | Dec 2009 |
| Lafayette | Apr 2010 | 393-03-0018 | LA 343 | 1.0mi.N.La 342-.05mi.S.Us 90 (Drr) | Stabilize Base and Overlay | $2,500,000 to $5,000,000 | 3.70 | Chenevert, Mark | |
| Lafayette | Apr 2010 | 828-11-0006 | LA 339 | Roundabout At Int. Of La 339 & La92 | Roundabouts | $100,000 to $250,000 | 0.06 | Draughon, Steve | Dec 2009 |
| Lafayette | Apr 2010 | 828-12-0022 | LA 92 | Roundabout At Int. Of La 339 & La92 | Roundabouts | $100,000 to $250,000 | 0.06 | Draughon, Steve | Dec 2009 |
| Lafayette | May 2010 | 737-28-0010 | US 90 | Upgrade Signals In Lafayette Parish | Signal Upgrade | $250,000 to $500,000 | 0.10 | Colvin, Jody | |
| Lafayette | Jun 2010 | 217-01-0017 | LA 93 | Roundabout La 98 and La 93 | Roundabout | $500,000 to $1,000,000 | 0.23 | Draughon, Steve | |
| Lafayette | Jun 2010 | 218-30-0005 | LA 724 | Jct.La342-jct.Local R. Althea Drive | Stabilize Base and Overlay | $1,000,000 to $2,500,000 | 1.97 | Chenevert, Mark | |
| Lafayette | Jun 2010 | 742-28-0003 | Lafayette Con.Gov. Sr2s Project | Sidewalks, Etc. | $100,000 to $250,000 | 0.00 | Parsons, Brian | ||
| Lafayette | Jun 2010 | 828-12-0021 | LA 339 | Verot School Road (C & G) | Clear and Grub and Outfall Drainage | $10,000,000 to $15,000,000 | 3.19 | Grice, Bill | Mar 2010 |
| Lafourche | Mar 2010 | 064-06-0047 | LA 1 | Lockport Repairs | Repair Limit Switch/Span Lock/Gate | $250,000 to $500,000 | 0.01 | Reed, Kevin | |
| Lafourche | Mar 2010 | 064-06-0048 | LA 1 | La 1 @ Mathews | Overlay | $1,000,000 to $2,500,000 | 0.01 | Waguespack, Brent | |
| Lafourche | Mar 2010 | 064-06-0049 | LA 1 | La 1 Signage Impr. | Lighting and Signing | $0 to $100,000 | 0.01 | Waguespack, Brent | |
| Lafourche | Mar 2010 | 064-07-0026 | LA 1 | Lafourche Parish Turning Lanes | Turning Lanes | $250,000 to $500,000 | 0.01 | Waguespack, Brent | |
| Lafourche | Mar 2010 | 742-29-0004 | Tiger Dr Exten & Thibodaux Overlays | Overlay | $1,000,000 to $2,500,000 | 0.01 | Waguespack, Brent | ||
| Lafourche | Mar 2010 | 742-29-0009 | Acadia Road Pedestrain Walkway | Pedestain Walkway | $250,000 to $500,000 | 0.01 | Waguespack, Brent | ||
| Lafourche | May 2010 | 412-03-0014 | LA 316 | N End Us90 Exit Ramp -terrebonne Pl | Patch, Cold Plane & Overlay | $250,000 to $500,000 | 1.04 | Chenevert, Mark | |
| Lafourche | Jun 2010 | 064-08-0017 | LA 1 | La 1 From W.La 20-assumption Ph Ln | Cold Plane and Overlay | $1,000,000 to $2,500,000 | 6.20 | Chenevert, Mark | |
| Lafourche | Jun 2010 | 065-06-0048 | LA 20 | La 20 Safety Improvements | Overlay to Increase Skid Resistance | $1,000,000 to $2,500,000 | 9.10 | Branton, Jennifer | |
| Lafourche | Jun 2010 | 407-04-0042 | LA 308 | La 308 (La 182-3 Miles W Of La 182) | Patch, Cold Plane & Overlay | $1,000,000 to $2,500,000 | 3.00 | Chenevert, Mark | |
| Lafourche | Jun 2010 | 412-03-0013 | LA 316 | La 316(Us90 - La 24) | Cold Plane and Overlay | $500,000 to $1,000,000 | 2.38 | Chenevert, Mark | |
| Lafourche | Jun 2010 | 742-29-0002 | Town Of Lockport Sr2s Project | Sidewalks, Etc. | $100,000 to $250,000 | 0.00 | Parsons, Brian | ||
| Lafourche | Jun 2010 | 829-26-0016 | LA3235 | La 3235 (La 1 - Golden Meadow) | Pcc Rehab, Overlay Shoulders | $2,500,000 to $5,000,000 | 3.34 | Chenevert, Mark | |
| Lafourche | Jul 2010 | 005-07-0057 | LA 182 | Drain Canal Bridge | Bridge Replacement | $500,000 to $1,000,000 | 0.20 | Grice, Bill | Apr 2010 |
| Lafourche | Jul 2010 | 065-06-0040 | LA 20 | Grand Bayou Bridge | Bridge Replacement | $1,000,000 to $2,500,000 | 0.40 | Grice, Bill | Mar 2010 |
| LaSalle | Jun 2010 | 713-30-0130 | Brasher and Turnley Roads | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| LaSalle | Jun 2010 | 713-30-0133 | Cooper Loop Bridges | Bridge Replacement | $250,000 to $500,000 | 0.00 | Pentek, Gary | ||
| LaSalle | Jul 2010 | 015-05-0062 | US 165 | Grant Ph Line - US 84 | Cold Plane and Overlay | $250,000 to $500,000 | 3.54 | Chenevert, Mark | |
| LaSalle | Jul 2010 | 022-04-0039 | US 84 | Winn Ph.Line - US 165 | Cold Plane and Overlay | $500,000 to $1,000,000 | 0.94 | Chenevert, Mark | |
| LaSalle | Jul 2010 | 127-02-0028 | LA 127 | Us 165 - La 125 | Stabilize Base and Overlay | $500,000 to $1,000,000 | 0.74 | Chenevert, Mark | |
| Lincoln | Mar 2010 | 451-05-0114 | I 20 | West Choudrant Creek | Bridge Scour Repair | $100,000 to $250,000 | 0.01 | Guidry, Chris | |
| Lincoln | Jun 2010 | 001-07-0028 | US 80 | Bienville P/L-0.1 Mi.W.Of Simsboro | Ultra Thin Overlay | $500,000 to $1,000,000 | 4.54 | Chenevert, Mark | |
| Lincoln | Jul 2010 | 831-15-0003 | LA3074 | La 563 - La 544 | Surface and Overlay/Chip Seal | $1,000,000 to $2,500,000 | 2.43 | Chenevert, Mark | |
| Livingston | Mar 2010 | 262-03-0017 | LA 16 | Denham Springs Historical District | Sidewalks, Electrical Conduit | $250,000 to $500,000 | 0.16 | Horton, Valerie | |
| Livingston | Apr 2010 | 454-02-0071 | I 12 | Amite Bridge-pete's(Wb)-juban(Eb&wb | 6 Lane; Design-build | $30,000,000 to $50,000,000 | 2.08 | Burst, Jeffery | |
| Livingston | May 2010 | 272-04-0011 | LA 63 | La 1023 - La 16 | Mill and Overlay | $250,000 to $500,000 | 2.15 | Chenevert, Mark | |
| Livingston | May 2010 | 742-32-0003 | Town Of Walker Sr2s Project | Sidewalks/Bicycle Trail, Etc. | $100,000 to $250,000 | 0.50 | Parsons, Brian | ||
| Livingston | Jun 2010 | 262-31-0016 | LA 64 | Amite River Bridge @ Magnolia | Bridge Replacement; B-list Project | $20,000,000 to $30,000,000 | 0.73 | Yap, Kian | Mar 2010 |
| Livingston | Jul 2010 | 268-03-0004 | LA 447 | La 1019 - La 63 | Cp,Base&olay S.B.;patch & Olay N.B. | $1,000,000 to $2,500,000 | 3.78 | Chenevert, Mark | |
| Madison | Jun 2010 | 020-07-0022 | US 65 | Us 80 - Tallulah City Limits | Asphalt Overlay | $1,000,000 to $2,500,000 | 0.94 | Chenevert, Mark | |
| Madison | Jun 2010 | 451-08-0078 | I 20 | Mound - Delta Scales | Rubblize Or Overlay & Saw & Seal Jt | $15,000,000 to $20,000,000 | 4.40 | Thomas, Ben | |
| Natchitoches | Apr 2010 | 010-01-0024 | US 71 | Us 71 @ Fairview Elementry School | Turn Lane | $500,000 to $1,000,000 | 0.50 | Hicks, Melvin | Feb 2010 |
| Natchitoches | Apr 2010 | 455-06-0058 | I 49 | I-49(Rapides P/L-.10mi. S.La 485) | Pavement Marker Replacement | $0 to $100,000 | 0.01 | Allain, Peter | |
| Natchitoches | Jun 2010 | 053-04-0034 | LA 1 | Old River Bridge At Montrose | Bridge Replacement | $2,500,000 to $5,000,000 | 0.07 | Peltier, Justin | Mar 2010 |
| Natchitoches | Jul 2010 | 713-35-0112 | Kisatchie Falls Bridge | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| Orleans | Mar 2010 | 450-90-0230 | I 10 | I-10 Fencing,Safety, Beautification | Landscaping and Fence Installation | $2,500,000 to $5,000,000 | 0.01 | Riggs, Laura | |
| Orleans | Apr 2010 | 006-05-0087 | US 90 | Chef Menteur Bridge Fender System | Fender System Repairs | $1,000,000 to $2,500,000 | 0.10 | Drake, Bill | |
| Orleans | Apr 2010 | 737-36-0007 | City Park (Tricentennial Park) | Roadway Improvements/Parking Lot | $500,000 to $1,000,000 | 0.00 | Horton, Valerie | ||
| Orleans | May 2010 | 006-03-0058 | US 90 | S Carrollton Ave-w End US 90b/I-1o | Patch, Cold Plane & Overlay | $2,500,000 to $5,000,000 | 2.77 | Chenevert, Mark | |
| Orleans | May 2010 | 018-02-0057 | US 11 | Us 11 Bridge Rail Rehab | Bridge Rail Rehab | $5,000,000 to $7,500,000 | 4.76 | Fossier, Paul | |
| Orleans | May 2010 | 450-43-0080 | I 510 | I-510 (N. End Of Icww Br. - I-10) | Pavement Marking Replacement | $0 to $100,000 | 0.01 | Allain, Peter | |
| Orleans | May 2010 | 450-90-0226 | I 10 | Near Franklin Ave - High Rise | Concrete Pavement Rehab & Overlay | $2,500,000 to $5,000,000 | 2.32 | Thomas, Ben | |
| Orleans | Jun 2010 | 006-90-0099 | US 90 | Camelot Dr - .4 Mi.E.Gentilly (Ddr) | Cold Plane and Overlay | $2,500,000 to $5,000,000 | 5.20 | Chenevert, Mark | |
| Orleans | Jun 2010 | 450-34-0096 | I 610 | I-610 @ St Bernard Avenue | High Friction Surfacing | $250,000 to $500,000 | 0.47 | Guilbeau, Justin | |
| Orleans | Jun 2010 | 450-90-0227 | I 10 | High Rise - Paris Rd. | Concrete Pavement Rehab & Overlay | $7,500,000 to $10,000,000 | 6.99 | Thomas, Ben | |
| Orleans | Jul 2010 | 006-03-0056 | US 90 | Broad Street (Orleans Ave-gentilly) | Cold Plane and Overlay | $1,000,000 to $2,500,000 | 1.91 | Chenevert, Mark | |
| Orleans | Jul 2010 | 006-90-0100 | US 90 | E.End Inner Harbor Br.-old Gentilly | Cold Plane and Overlay | $1,000,000 to $2,500,000 | 2.44 | Chenevert, Mark | |
| Orleans | Jul 2010 | 742-36-0122 | Lakefront/Holy Cross Signal Improve | Signal Improvements | $1,000,000 to $2,500,000 | 0.00 | Riggs, Laura | ||
| Ouachita | Mar 2010 | 001-09-0075 | US 80 | Louisville Bridge | Rehabilitation (Phase Ii) | $7,500,000 to $10,000,000 | 0.60 | Kemp, Kelly | |
| Ouachita | Mar 2010 | 713-37-0132 | Red Cut Road Bridge #1 & #2 | New Bridges | $1,000,000 to $2,500,000 | 0.00 | Pentek, Gary | ||
| Ouachita | Mar 2010 | 742-37-0020 | Overlays In West Monroe | Overlay | $1,000,000 to $2,500,000 | 0.00 | Waguespack, Brent | ||
| Ouachita | Mar 2010 | 742-37-0021 | Good Hope Road | Overlay | $500,000 to $1,000,000 | 0.78 | Waguespack, Brent | ||
| Ouachita | Mar 2010 | 742-37-0024 | Vancil Road | Overlay | $1,000,000 to $2,500,000 | 1.18 | Waguespack, Brent | ||
| Ouachita | Mar 2010 | 742-37-0025 | Hadley Street | Overlay | $500,000 to $1,000,000 | 0.48 | Waguespack, Brent | ||
| Ouachita | Mar 2010 | 742-37-0026 | Washington Street | Overlay | $500,000 to $1,000,000 | 0.88 | Waguespack, Brent | ||
| Ouachita | Mar 2010 | 742-37-0027 | Riverside Drive | Overlay | $500,000 to $1,000,000 | 1.37 | Waguespack, Brent | ||
| Ouachita | Mar 2010 | 837-17-0010 | LA 617 | Thomas Rd (La 34 - Glenwood Dr.) | Concrete Patching | $1,000,000 to $2,500,000 | 1.66 | Chenevert, Mark | |
| Ouachita | Apr 2010 | 451-06-0152 | I 20 | End Of Elevated Sec-e.Of Garrett Rd | Rubblize and Overlay | $15,000,000 to $20,000,000 | 3.52 | Thomas, Ben | |
| Ouachita | Jun 2010 | 001-09-0086 | US 80 | Ds RR - Desiard | Ultra-thin Overlay | $500,000 to $1,000,000 | 2.14 | Chenevert, Mark | |
| Ouachita | Jun 2010 | 001-09-0087 | US 80 | Lincoln Parish Line - I-20 | Ultrathin Overlay | $500,000 to $1,000,000 | 5.27 | Chenevert, Mark | |
| Ouachita | Jun 2010 | 315-02-0042 | LA 143 | Us 80 - La 616 | Concrete Patching | $500,000 to $1,000,000 | 0.65 | Chenevert, Mark | |
| Ouachita | Jun 2010 | 326-01-0030 | LA 594 | Garrett Rd to La 594 Turn Lanes | Turn Lanes | $250,000 to $500,000 | 0.32 | Drake, Bill | |
| Ouachita | Jun 2010 | 713-37-0137 | Hadley Street Bridge | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| Ouachita | Jun 2010 | 837-19-0004 | LA3249 | Well Road N.B. Turn Lane | Turn Lane | $250,000 to $500,000 | 0.09 | Drake, Bill | |
| Ouachita | Jul 2010 | 451-06-0140 | I 20 | I-20 E.B.Off-ramp Imp. @ Wellrd. | Increase Storage/Improve Geometrics | $1,000,000 to $2,500,000 | 0.26 | Colquette, Paul | |
| Plaquemines | Mar 2010 | 838-03-0024 | LA 406 | Woodland Hwy Improvements Phase 2 | Asp Widen and Overlay | $1,000,000 to $2,500,000 | 1.92 | Riggs, Laura | |
| Plaquemines | Jun 2010 | 062-05-0042 | LA 23 | La 23 (Near Empire) | Drainage Improvements | $100,000 to $250,000 | 0.54 | Nilforoushan, Mehdi | |
| Plaquemines | Jun 2010 | 062-05-0043 | LA 23 | La 23 (.3 M N Of RR Spur - 2.6 M N) | Patch, Cold Plane & Overlay | $500,000 to $1,000,000 | 1.30 | Chenevert, Mark | |
| Plaquemines | Jun 2010 | 062-05-0044 | LA 23 | La 23(3.48m S Doullut Canal -buras) | Patch, Cold Plane & Overlay | $1,000,000 to $2,500,000 | 1.80 | Chenevert, Mark | |
| Plaquemines | Jun 2010 | 062-06-0035 | LA 23 | Jct Buras Rd - 5.4 M S Of Jct | Patch, Cold Plane & Overlay | $2,500,000 to $5,000,000 | 5.40 | Chenevert, Mark | |
| Pointe Coupee | Apr 2010 | 219-04-0017 | LA 77 | Iberville Ph Line - US 90 | Stabilize and Overlay | $2,500,000 to $5,000,000 | 4.59 | Chenevert, Mark | |
| Pointe Coupee | May 2010 | 008-02-0032 | US 190 | Left Turn Lanes @ La77 & La 78/411 | Turn Lanes | $7,500,000 to $10,000,000 | 1.00 | Guidry, Chris | Oct 2005 |
| Pointe Coupee | May 2010 | 008-03-0056 | US 190 | Us 190 Morganza Floodway Bridge | Bridge Repair | $10,000,000 to $15,000,000 | 3.55 | Fossier, Paul | |
| Rapides | Mar 2010 | 014-06-0039 | US 165 | Woodworth Sidewalk Imp., Phase 2 | Sidewalk Improvements | $250,000 to $500,000 | 0.01 | Horton, Valerie | |
| Rapides | Mar 2010 | 737-40-0104 | I 49 | Rapides - Impact Attenuator Upgrade | Replace Exist Impact Attenuators | $500,000 to $1,000,000 | 0.01 | Hicks, Melvin | |
| Rapides | Mar 2010 | 737-40-0107 | Valentine Lake Road | Overlay | $100,000 to $250,000 | 0.81 | Choate, Rodney | ||
| Rapides | Apr 2010 | 455-05-0124 | I 20 | I-49 .10mi.S.Of La1-natchitoches Pl | Pavement Marking Replacement | $0 to $100,000 | 0.01 | Allain, Peter | |
| Rapides | May 2010 | 840-43-0001 | US 71 | Ft. Buhlow Br (Us 71 / US 165) | Main Span | $100,000,000 to $125,000,000 | 1.42 | Umeozulu, Joe | Oct 2009 |
| Rapides | Jun 2010 | 023-01-0062 | US 167 | S.Jct La 3225-n.Jct La 3225 | O'lay Rdway&shldrs,Drainage&patch | $2,500,000 to $5,000,000 | 4.19 | Chenevert, Mark | |
| Rapides | Jun 2010 | 023-01-0065 | US 167 | Red River Bridge Maintenence | Bridge Painting | $250,000 to $500,000 | 0.01 | Hicks, Melvin | |
| Rapides | Jun 2010 | 023-01-0068 | US 167 | Pineville Expressway (R.R.Br.-us165 | Signing | $1,000,000 to $2,500,000 | 5.02 | Harrouch, Joshua | |
| Rapides | Jul 2010 | 074-02-0024 | LA 28 | La 1207 - Lasalle Parish Line | Patch,Cold Plane, & 3lift Overlay | $2,500,000 to $5,000,000 | 4.70 | Chenevert, Mark | |
| Rapides | Jul 2010 | 141-03-0010 | LA 112 | La 121 - E. Davis Rd. | Patch and Overlay | $1,000,000 to $2,500,000 | 3.50 | Chenevert, Mark | |
| Rapides | Jul 2010 | 737-40-0105 | City Of Alex. Sr2s Proj.(Rugg Elem) | Sidewalks/Traffic Calming | $100,000 to $250,000 | 0.00 | Parsons, Brian | ||
| Rapides | Jul 2010 | 840-34-0009 | LA3144 | Edgewood Dr.(Ivy Ln.-anna Ln.) | Remove and Replace PCCP | $100,000 to $250,000 | 0.11 | Chenevert, Mark | |
| Red River | Apr 2010 | 010-02-0010 | US 71 | Natchitoches Parish Line - US 84 | 2"mill and Overlay (Chip Shoulders) | $1,000,000 to $2,500,000 | 8.88 | Chenevert, Mark | |
| Red River | Jun 2010 | 010-03-0035 | US 71 | Drainage Imp US 71@us 371 Phase II | Roadway Drainage Improvements | $1,000,000 to $2,500,000 | 0.52 | Nilforoushan, Mehdi | |
| Red River | Jul 2010 | 010-03-0036 | US 71 | Lm 5.96 - Lm 10.96 | Mill, Inlay, Chip Shoulders | $1,000,000 to $2,500,000 | 5.00 | Chenevert, Mark | |
| Richland | Jun 2010 | 166-03-0012 | LA 561 | Caldwell Ph. Line - La 132 | Chip Seal 2 | $500,000 to $1,000,000 | 11.00 | Chenevert, Mark | |
| Richland | Jun 2010 | 713-42-0144 | Bosco Road Bridge | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | |||
| Richland | Jul 2010 | 842-05-0007 | LA 855 | La 17 - Parish Rd. | Chip Seal 2 | $100,000 to $250,000 | 1.79 | Chenevert, Mark | |
| Sabine | Mar 2010 | 117-02-0014 | LA 118 | Peason - Natchitoches Pr. Line | Ctb & Overlay | $1,000,000 to $2,500,000 | 3.53 | Chenevert, Mark | |
| Sabine | Mar 2010 | 300-01-0009 | LA 483 | Kisatchie Pole Plant - Jct La 174 | Ctb and Overlay | $1,000,000 to $2,500,000 | 4.68 | Chenevert, Mark | |
| Sabine | May 2010 | 713-43-0111 | Tobe Nabours Road Bridge | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| St. Bernard | Mar 2010 | 046-03-0076 | LA 46 | St.Bernard Hwy Drain/Safety Imp Ph3 | Drainage/Safety Improvements | $1,000,000 to $2,500,000 | 0.01 | Riggs, Laura | |
| St. Charles | May 2010 | 005-08-0052 | US 90 | Us90(E Of B.Des All.-1.31m E La306) | Patch, Cold Plane & Overlay | $2,500,000 to $5,000,000 | 6.30 | Chenevert, Mark | |
| St. Charles | May 2010 | 845-09-0008 | LA 632 | Main Canal Bridge | Bridge Replacement | $1,000,000 to $2,500,000 | 0.30 | Bucci, Mark | Jun 2009 |
| St. Charles | Jun 2010 | 007-03-0057 | US 61 | W End Of La 310 Ent Ramp-st John Pl | Patch, Cold Plane & Overlay | $5,000,000 to $7,500,000 | 7.09 | Chenevert, Mark | |
| St. Charles | Jun 2010 | 063-05-0027 | LA 18 | River Rd. (Jefferson P/L - La 52) | Patch, Cold Plane & Overlay | $1,000,000 to $2,500,000 | 6.10 | Chenevert, Mark | |
| St. Charles | Jun 2010 | 063-05-0028 | LA 18 | La 18 (Jefferson Ph.Line - La 52) | Cold Plane and Overlay | $250,000 to $500,000 | 6.08 | Chenevert, Mark | |
| St. Charles | Jun 2010 | 063-06-0028 | LA 18 | La 52 - St. John Parish Line | Cold Plane and Overlay | $2,500,000 to $5,000,000 | 11.68 | Chenevert, Mark | |
| St. Charles | Jul 2010 | 282-30-0016 | LA 627 | La 48 - US 61 | Cold Plane, Overlay | $250,000 to $500,000 | 1.07 | Chenevert, Mark | |
| St. Charles | Jul 2010 | 845-03-0020 | LA 52 | Us 90 - La 18 | Cold Plane and Overlay | $1,000,000 to $2,500,000 | 2.73 | Chenevert, Mark | |
| St. Charles | Jul 2010 | 845-08-0011 | LA 632 | La 632 (La 306 - End Of Control) | Cold Plane and Overlay | $1,000,000 to $2,500,000 | 1.81 | Chenevert, Mark | |
| St. Helena | Mar 2010 | 846-01-0009 | LA1036 | Livingston Ph. Line - N.Jct La 441 | Cold Plane,Patch & Overlay | $1,000,000 to $2,500,000 | 4.33 | Chenevert, Mark | |
| St. Helena | Apr 2010 | 061-08-0016 | LA 10 | .29mi E.Of La 441 - Tangipahoa P.L. | Mill and Overlay | $500,000 to $1,000,000 | 2.60 | Chenevert, Mark | |
| St. Helena | Apr 2010 | 061-08-0017 | LA 10 | Jct La 441 - .29 M East Jct La 441 | Surface Preparation and Overlay | $0 to $100,000 | 0.29 | Chenevert, Mark | |
| St. Helena | May 2010 | 846-05-0009 | LA1045 | La 43 - Tangipahoa Parish Line | Chip Seal Single | $100,000 to $250,000 | 5.78 | Broadbent, Ronald | |
| St. Helena | May 2010 | 846-06-0006 | LA1046 | La 441 - La 1047 | Chip Seal Single | $100,000 to $250,000 | 2.80 | Broadbent, Ronald | |
| St. Helena | Jun 2010 | 713-46-0112 | Travis Road Bridge | Bridge Replacement | $250,000 to $500,000 | 0.00 | Pentek, Gary | ||
| St. James | Apr 2010 | 063-08-0026 | LA 18 | La 20 - 1.0 Mile North | Asphaltic Concrete Overlay | $250,000 to $500,000 | 1.00 | Chenevert, Mark | |
| St. James | Apr 2010 | 063-08-0027 | LA 18 | 1 Mi N Of La 20 - 1 Mi N La 3219 | Asphaltic Concrete Overlay | $1,000,000 to $2,500,000 | 6.06 | Chenevert, Mark | |
| St. James | Apr 2010 | 426-31-0014 | LA3125 | W.B. Left Turn Lane At La 3193 | Turn Lane | $500,000 to $1,000,000 | 0.38 | Drake, Bill | |
| St. John Baptist | May 2010 | 452-01-0052 | I 55 | I-55 (I-10 - Tangipahoa Ph. Line) | Pavement Marking Replacement | $250,000 to $500,000 | 0.01 | Allain, Peter | |
| St. John Baptist | May 2010 | 848-07-0013 | La 628 Turn Lane | Intersection Improvement | $500,000 to $1,000,000 | 0.00 | Musa, Elnur | Feb 2010 | |
| St. John Baptist | Aug 2010 | 452-01-0051 | I 55 | I-55 @ Ruddock Interchange | Drainage Improvements | $500,000 to $1,000,000 | 0.01 | Nilforoushan, Mehdi | |
| St. Landry | Apr 2010 | 012-11-0036 | US 190 | Evangeline Ph Line - 1.00 Mi East | Patch and Overlay | $500,000 to $1,000,000 | 1.00 | Chenevert, Mark | |
| St. Landry | Jun 2010 | 455-02-0072 | I 49 | Lafayette P/L(Cslm 0.0)-cslm 11.13 | Overlay 4" | $20,000,000 to $30,000,000 | 11.13 | Thomas, Ben | |
| St. Landry | Jun 2010 | 455-02-0074 | I 49 | Jct US 190 - 0.7 Mi.S.Jct La 10 | Concrete Pvmt Rehab & Overlay | $2,500,000 to $5,000,000 | 7.70 | Thomas, Ben | |
| St. Landry | Jun 2010 | 742-49-0001 | Eunice Safe Routes to Schools | Sidewalks and Bike Rack | $100,000 to $250,000 | 0.00 | Parsons, Brian | ||
| St. Martin | Apr 2010 | 004-03-0009 | LA 182 | Laf P/L - Iberia P/L | Patch and Overlay | $500,000 to $1,000,000 | 4.92 | Chenevert, Mark | |
| St. Martin | Apr 2010 | 238-03-0046 | LA 96 | 0.3 Mi E Of Jct La 347 - Jct La 345 | Patch and Overlay | $100,000 to $250,000 | 0.90 | Chenevert, Mark | |
| St. Martin | Apr 2010 | 400-04-0012 | LA 347 | La 347 (La 96 - 0.7 Mi N) | Patch and Overlay | $100,000 to $250,000 | 0.70 | Chenevert, Mark | |
| St. Mary | Apr 2010 | 243-02-0080 | LA 317 | N.Side US 90 Interchange - La 182 | C.P.,Patch and Overlay | $500,000 to $1,000,000 | 0.98 | Chenevert, Mark | |
| St. Mary | May 2010 | 408-02-0011 | LA 87 | La 322 - End Of Maintenance | Cold Plane, Patch and Overlay | $2,500,000 to $5,000,000 | 5.01 | Chenevert, Mark | |
| St. Tammany | Mar 2010 | 013-10-0043 | US 190X | W.Jct La 21 - S.Jct US 190 | Cold Plane, Patch and Overlay | $500,000 to $1,000,000 | 1.58 | Chenevert, Mark | |
| St. Tammany | Mar 2010 | 013-10-0044 | US 190 | 3.14 Mi.E.Of La 1077-w. Jct.Us190 B | Mill and Overlay | $250,000 to $500,000 | 1.20 | Chenevert, Mark | |
| St. Tammany | Mar 2010 | 013-11-0038 | US 190 | Us 190 - Northpark Intersection Imp | Intersection Improvements | $250,000 to $500,000 | 0.38 | Waguespack, Brent | Nov 2009 |
| St. Tammany | Mar 2010 | 018-30-0025 | LA 433 | La 433 @ Voters Rd | Intersection Improvements | $1,000,000 to $2,500,000 | 0.01 | Waguespack, Brent | Nov 2009 |
| St. Tammany | Mar 2010 | 058-01-0027 | LA 41 | La 36 - North 1.2 Mi Of Jct La 36 | Mill and Overlay | $100,000 to $250,000 | 1.20 | Chenevert, Mark | |
| St. Tammany | Mar 2010 | 059-01-0029 | LA 21 | La 21 @ Brewster Rd | Intersection Improvements | $1,000,000 to $2,500,000 | 0.01 | Waguespack, Brent | Nov 2009 |
| St. Tammany | Mar 2010 | 281-04-0025 | LA 435 | Abita Springs Sidewalk Program | New Sidewalks | $250,000 to $500,000 | 0.01 | Horton, Valerie | |
| St. Tammany | Mar 2010 | 453-01-0060 | I 59 | I-59(I-10 - S.W.End Of Pearl R.Br.) | Pavement Marker Replacement | $0 to $100,000 | 0.01 | Allain, Peter | |
| St. Tammany | Mar 2010 | 453-02-0006 | I 59 | I-59 (S.W. End Pearl R.Br.-miss.Ln. | I-59 Pavement Marking Replacement | $0 to $100,000 | 0.01 | Allain, Peter | |
| St. Tammany | Mar 2010 | 454-04-0082 | La 21 @ I-12 | Interchange Improvements | $5,000,000 to $7,500,000 | 0.68 | Waguespack, Brent | Nov 2009 | |
| St. Tammany | Mar 2010 | 852-21-0046 | LA 433 | 3.40 Mi S.Of US 190-1.06 Mi N US 11 | Mill and Overlay | $250,000 to $500,000 | 2.00 | Chenevert, Mark | |
| St. Tammany | Mar 2010 | 852-21-0047 | LA 433 | La 433 (Jct US 190 - Jct US 11) | Asphalt Overlay | $1,000,000 to $2,500,000 | 6.46 | Chenevert, Mark | |
| St. Tammany | Mar 2010 | 852-25-0017 | LA1091 | La 1091 @ Brownswitch Rd | Intersection Improvements | $1,000,000 to $2,500,000 | 0.01 | Waguespack, Brent | Nov 2009 |
| St. Tammany | Mar 2010 | 852-26-0017 | LA1090 | La 1090 @ Brownswitch Road | Intersection Improvements | $500,000 to $1,000,000 | 0.19 | Waguespack, Brent | Nov 2009 |
| St. Tammany | Mar 2010 | 852-26-0022 | LA1090 | 0.15 Mi.N. Of US 190 - I-59 Ramps | Mill and Overlay | $500,000 to $1,000,000 | 4.30 | Chenevert, Mark | |
| St. Tammany | Mar 2010 | 852-26-0023 | LA1090 | 0.15 Mi N Jct US 190-jct I-59 Ramps | Asphalt Overlay | $1,000,000 to $2,500,000 | 4.30 | Chenevert, Mark | |
| St. Tammany | May 2010 | 013-12-0057 | US 190 | Roundabout At E. Jct La 434 | Roundabout | $500,000 to $1,000,000 | 0.12 | Drake, Bill | |
| St. Tammany | May 2010 | 013-12-0058 | US 190 | Us190 Corridor Landscaping/Sidewalk | Landscaping and Sidewalks | $250,000 to $500,000 | 0.01 | Horton, Valerie | |
| St. Tammany | May 2010 | 737-52-0007 | Pearl River Signing & Marking Proj | Install Signing & Pavement Markings | $0 to $100,000 | 0.00 | Monaghan, Terri | ||
| St. Tammany | May 2010 | 744-52-0028 | Tammany Trace Lacombe Trailhead | Enhancement/Construct Building | $100,000 to $250,000 | 0.00 | Horton, Valerie | ||
| St. Tammany | May 2010 | 852-05-0007 | LA1077 | La 25 - La 1078 | Chip Seal Single | $100,000 to $250,000 | 4.31 | Broadbent, Ronald | |
| St. Tammany | Jun 2010 | 454-04-0070 | I 12 | I-12 (Us 11 - La 1091)noise Barrier | Noise Barrier Replacement | $1,000,000 to $2,500,000 | 1.36 | Herath, Ananda | |
| St. Tammany | Jun 2010 | 742-52-0012 | I-10 Sw Service Rd Extension | New 2 Lane | $2,500,000 to $5,000,000 | 0.00 | Waguespack, Brent | ||
| St. Tammany | Jul 2010 | 281-04-0027 | LA 435 | La 36 - Double Creek Bridge | Cold Plane,Base,Drainage&overlay | $2,500,000 to $5,000,000 | 7.53 | Chenevert, Mark | |
| Statewide | May 2010 | 737-99-1060 | I 12 | 1-12 Ramp Metering Ebr & Liv Parish | Equipment Procurement | $1,000,000 to $2,500,000 | 0.01 | Delaney, Elizabeth | |
| Tangipahoa | Mar 2010 | 262-07-0026 | LA 16 | End Of Conc Section On La 16-us 51 | Mill and Overlay | $500,000 to $1,000,000 | 1.28 | Chenevert, Mark | |
| Tangipahoa | Mar 2010 | 452-90-0152 | I 55 | La 1049 - Mississippi State Line | Rubbilize and Overlay | $15,000,000 to $20,000,000 | 5.32 | Thomas, Ben | |
| Tangipahoa | Apr 2010 | 061-09-0017 | LA 10 | St Helena P/L - Jct US 51 | Surface Preparation and Overlay | $1,000,000 to $2,500,000 | 3.29 | Chenevert, Mark | |
| Tangipahoa | Apr 2010 | 261-04-0024 | LA 22 | La 22 (Ponchatoula Drainage Imp) | Drainage Improvements | $100,000 to $250,000 | 0.23 | Nilforoushan, Mehdi | |
| Tangipahoa | Apr 2010 | 737-53-0006 | Independence St Sign Replacement | Replace & Maintain Proper Signage | $0 to $100,000 | 0.00 | Monaghan, Terri | ||
| Tangipahoa | May 2010 | 269-05-0020 | LA 442 | Jct. U.S. 51 - Jct.La 445 | Mill and Overlay | $1,000,000 to $2,500,000 | 11.24 | Chenevert, Mark | |
| Tangipahoa | May 2010 | 452-90-0159 | I 55 | I-55(St. John Ph.Line)-opass La 16 | Pavement Marking Replacement | $500,000 to $1,000,000 | 0.01 | Allain, Peter | |
| Tangipahoa | May 2010 | 853-01-0015 | LA1054 | Us 51 - La 1055 | Chip Seal Single | $100,000 to $250,000 | 3.87 | Broadbent, Ronald | |
| Tangipahoa | May 2010 | 853-07-0007 | LA1045 | St.Helena Ph. Line - La 16 | Chip Seal Single | $0 to $100,000 | 1.56 | Broadbent, Ronald | |
| Tangipahoa | May 2010 | 853-28-0007 | LA1064 | Right Turn Lane On La 1064 @ US 190 | Turn Lane | $250,000 to $500,000 | 0.20 | Drake, Bill | |
| Tangipahoa | Jun 2010 | 452-90-0160 | I 55 | La 40 - La 16 | Rubblize & Overlay | $15,000,000 to $20,000,000 | 6.34 | Schilling, Allison | |
| Tangipahoa | Jun 2010 | 454-03-0073 | I 12 | I-12 Cable Median Barrier | Cable Median Barrier Installation | $2,500,000 to $5,000,000 | 0.01 | Schilling, Allison | |
| Tangipahoa | Jun 2010 | 713-53-0118 | Z Mcdaniel & E.Westmoreland Bridges | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| Tangipahoa | Jun 2010 | 853-03-0010 | LA1051 | Beaver Creek Bridge | Bridge Scour Repair | $250,000 to $500,000 | 0.01 | Guidry, Chris | Mar 2010 |
| Tangipahoa | Jul 2010 | 017-05-0019 | US 51 | La 16 - N. Jct La 10 | Cold Plane, Patch and Overlay | $2,500,000 to $5,000,000 | 6.93 | Chenevert, Mark | |
| Tangipahoa | Jul 2010 | 853-21-0002 | LA1249 | La 22 - La 1040 | Cold Plane,Base,Drainage, & Overlay | $1,000,000 to $2,500,000 | 3.55 | Chenevert, Mark | |
| Tensas | May 2010 | 020-30-0030 | LA 128 | Us 65 - La 605 | C.P. and Overlay | $1,000,000 to $2,500,000 | 3.60 | Chenevert, Mark | |
| Tensas | May 2010 | 854-09-0012 | LA 8971 | Front St. - La 605 | Cold Plane & Overlay | $0 to $100,000 | 0.13 | Chenevert, Mark | |
| Tensas | Jul 2010 | 020-02-0034 | US 65 | La 566 - La 568 | Break,Seat and Overlay | $1,000,000 to $2,500,000 | 2.38 | Chenevert, Mark | |
| Tensas | Jul 2010 | 176-03-0010 | LA 569 | Confordia Line - La 568 | Ast | $0 to $100,000 | 1.21 | Chenevert, Mark | |
| Tensas | Jul 2010 | 180-01-0011 | LA 573 | La 128 - La 568 | Ast | $250,000 to $500,000 | 10.46 | Chenevert, Mark | |
| Tensas | Jul 2010 | 186-04-0017 | LA 573 | Cooter Point - La 3044 | Ast | $100,000 to $250,000 | 8.54 | Chenevert, Mark | |
| Tensas | Jul 2010 | 350-01-0005 | LA 888 | La 4 - Martin Chapel | Ast | $100,000 to $250,000 | 5.18 | Chenevert, Mark | |
| Tensas | Jul 2010 | 350-02-0015 | LA 888 | Martin Chapel - La 575 | Ast | $250,000 to $500,000 | 7.58 | Chenevert, Mark | |
| Tensas | Jul 2010 | 854-01-0012 | LA 571 | S. Jct La 566 - N.Jct La 566 | Ast | $250,000 to $500,000 | 12.25 | Chenevert, Mark | |
| Tensas | Jul 2010 | 854-11-0022 | LA 604 | La 606 - La 605 | Ast | $100,000 to $250,000 | 8.56 | Chenevert, Mark | |
| Tensas | Jul 2010 | 854-13-0015 | LA 570 | La 569 - La 568 | Ast | $100,000 to $250,000 | 4.21 | Chenevert, Mark | |
| Terrebonne | Mar 2010 | 065-91-0035 | LA 24 | Bourg Bridge (Company Canal) | Remove & Replace Gate Arm Operators | $100,000 to $250,000 | 0.01 | Berner, Darrick | |
| Terrebonne | Mar 2010 | 245-02-0031 | LA 315 | La315(S.End Of La 315-boudreaux Rd) | O'lay;only Let When Get Hmgp$ | $1,000,000 to $2,500,000 | 9.78 | Chenevert, Mark | |
| Terrebonne | Mar 2010 | 245-90-0058 | LA 315 | La 315(Boudreaux Rd-.97 Mi.S.La182) | O'lay; Only Let When Get Hmgp$ | $2,500,000 to $5,000,000 | 9.48 | Chenevert, Mark | |
| Terrebonne | Mar 2010 | 742-55-0110 | Terrebonne Parish Overlays | Overlays | $500,000 to $1,000,000 | 0.01 | Waguespack, Brent | ||
| Terrebonne | Mar 2010 | 742-55-0111 | Terrebonne Ph Concrete Sec. Repairs | Concrete Repairs | $2,500,000 to $5,000,000 | 0.01 | Waguespack, Brent | ||
| Terrebonne | Mar 2010 | 742-55-0112 | Terrebonne Parish Turn Lanes | 12 Intersection Turn Lanes In Ph. | $500,000 to $1,000,000 | 0.01 | Waguespack, Brent | ||
| Terrebonne | Apr 2010 | 413-01-0016 | LA 311 | La 311 (3 Left Turn Lanes) | Left Turn Lanes | $500,000 to $1,000,000 | 0.01 | Drake, Bill | |
| Terrebonne | May 2010 | 065-91-0031 | LA 24 | Little Caillou Bayou Br Cln & Paint | Bridge Cleaning/Painting; B-list | $1,000,000 to $2,500,000 | 0.02 | Kemp, Kelly | |
| Terrebonne | May 2010 | 065-91-0036 | LA 24 | La 24 At La 56 and Country Drive | Intersection Improvements | $100,000 to $250,000 | 0.10 | Drake, Bill | |
| Terrebonne | May 2010 | 247-02-0035 | LA 56 | La56(N End Boudreaux Canal Br-la 58 | Patch, Cold Plane & Overlay | $1,000,000 to $2,500,000 | 6.16 | Chenevert, Mark | |
| Terrebonne | May 2010 | 737-55-0004 | Terrebonne Parish Signal Upgrade | Signalization Upgrade | $1,000,000 to $2,500,000 | 0.00 | Colvin, Jody | ||
| Terrebonne | May 2010 | 855-08-0057 | LA 661 | Bayou Lacarpe Bridge Clean & Paint | Bridge Cleaning/Painting; B-list | $1,000,000 to $2,500,000 | 0.04 | Kemp, Kelly | |
| Terrebonne | May 2010 | 855-08-0058 | LA 661 | La 661 @ Bayou Lacarpe | Navigation Light Repair-lights Etc. | $0 to $100,000 | 0.01 | Reed, Kevin | |
| Terrebonne | Jun 2010 | 855-12-0008 | LA 664 | St Charles Str Br Houma & Approach | Bridge Replacement | $500,000 to $1,000,000 | 0.20 | Yang, Li | Feb 2010 |
| Union | Jun 2010 | 070-04-0028 | LA 2 | Us 167 - .30 Mi W Of La 550 | Asph2-mill | $1,000,000 to $2,500,000 | 1.19 | Chenevert, Mark | |
| Union | Jul 2010 | 069-02-0022 | LA 33 | Lincoln Ph.Line - La 15 | Asphalt Overlay | $5,000,000 to $7,500,000 | 5.89 | Chenevert, Mark | |
| Vermilion | Mar 2010 | 857-66-0014 | LA3147 | Humble Canal Bridge | New Hydraulic Winch System | $250,000 to $500,000 | 0.01 | Harter, John | |
| Vermilion | Apr 2010 | 055-06-0081 | LA 14 | La 82 - La 338 (Drr) | Patch and Overlay | $500,000 to $1,000,000 | 1.42 | Chenevert, Mark | |
| Vermilion | Apr 2010 | 057-01-0007 | LA 13 | La 14 - 2.7 Mi.N. Of La 14 (Drr) | Patch and Overlay | $500,000 to $1,000,000 | 2.70 | Chenevert, Mark | |
| Vermilion | Apr 2010 | 080-01-0032 | US 167 | 0.58 M N La 14 Bypass-laf P/L (Drr) | Cold Plane,Patch & Functional O'lay | $2,500,000 to $5,000,000 | 9.40 | Chenevert, Mark | |
| Vermilion | Apr 2010 | 194-07-0062 | LA 82 | La 82 @ Vermillion River | Repair Pinion Gear | $0 to $100,000 | 0.01 | Berner, Darrick | |
| Vermilion | Apr 2010 | 194-07-0063 | LA 82 | La 333 - La 14 (Drr) | Patch and Overlay | $1,000,000 to $2,500,000 | 10.00 | Chenevert, Mark | |
| Vermilion | Apr 2010 | 213-04-0007 | LA 92 | S Jct US 167 - Lafayette P/L | Patch and Functional Overlay | $500,000 to $1,000,000 | 2.78 | Chenevert, Mark | |
| Vermilion | Apr 2010 | 385-05-0011 | LA 92 | Acadia P/L - Jct La 35 (Drr) | Patch and Overlay | $500,000 to $1,000,000 | 3.18 | Chenevert, Mark | |
| Vermilion | Apr 2010 | 393-02-0006 | LA 343 | La 699 - La 92 (Drr) | Patch and Overlay | $250,000 to $500,000 | 2.00 | Chenevert, Mark | |
| Vermilion | Apr 2010 | 713-57-0126 | Dennis Rd & Bluebonnet Rd Bridges | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| Vernon | Jun 2010 | 133-02-0035 | LA 392 | La 392 (Bayou Toro Bridge) | Bridge Bearing Pad Replacement | $100,000 to $250,000 | 0.01 | Hicks, Melvin | |
| Vernon | Jun 2010 | 373-01-0020 | LA 8 | La 8/Us 171 Roundabout | Install Roundabout | $1,000,000 to $2,500,000 | 0.11 | Hicks, Melvin | Jan 2010 |
| Vernon | Jul 2010 | 024-06-0045 | US 171 | Fort Polk - La 1221 (Nb) | Cold Plane and Overlay | $1,000,000 to $2,500,000 | 2.60 | Chenevert, Mark | |
| Vernon | Jul 2010 | 137-02-0018 | LA 465 | Jct. La 28 - Rapides Line | Patch and Chip Seal | $250,000 to $500,000 | 4.18 | Chenevert, Mark | |
| Washington | Apr 2010 | 030-03-0021 | LA 21 | Washington Ph Ln - St.Tammany Ph Ln | Landscaping | $250,000 to $500,000 | 0.01 | Horton, Valerie | |
| Washington | May 2010 | 274-02-0012 | LA 62 | .80mi.N.La 436-1.69mi.S.Of S.La 438 | Mill and Overlay | $500,000 to $1,000,000 | 3.20 | Chenevert, Mark | |
| Washington | May 2010 | 274-02-0013 | LA 62 | S.Jct. La 438 - N.Jct. La 438 | Mill and Overlay | $250,000 to $500,000 | 1.47 | Chenevert, Mark | |
| Washington | May 2010 | 274-02-0014 | LA 62 | La 436 - South Jct La 438 | Surface Prep and Overlay | $250,000 to $500,000 | 2.50 | Chenevert, Mark | |
| Washington | May 2010 | 274-30-0010 | LA 62 | N. Jct La 438-mississippi State Ln | Mill and Overlay | $250,000 to $500,000 | 1.71 | Chenevert, Mark | |
| Washington | May 2010 | 859-09-0020 | LA 430 | 3.57 Mi.N. Of Jct La 1069 - La 438 | Mill and Overlay | $500,000 to $1,000,000 | 6.40 | Chenevert, Mark | |
| Washington | May 2010 | 859-25-0011 | LA1055 | La 38 - La 438 | Chip Seal Single | $100,000 to $250,000 | 6.50 | Broadbent, Ronald | |
| Washington | Jun 2010 | 030-04-0031 | LA 21 | N.Jct La 436 - La 1071 | Cold Plane, Patch and Overlay | $2,500,000 to $5,000,000 | 6.02 | Chenevert, Mark | |
| Washington | Jun 2010 | 047-02-0034 | LA 16 | Microsurfacing St Hel- Wash | Microsurfacing Wheel Path Rutting | $2,500,000 to $5,000,000 | 20.90 | Schilling, Allison | |
| Washington | Jun 2010 | 713-59-0223 | Hilltop,Mike Fisher,Martinville Brs | Bridge Replacement | $1,000,000 to $2,500,000 | 0.00 | Pentek, Gary | ||
| Webster | Mar 2010 | 713-60-0013 | Nursery & Kings Orchard Road Brdgs. | Bridge Replacement | $1,000,000 to $2,500,000 | 0.00 | Pentek, Gary | ||
| Webster | May 2010 | 083-06-0037 | LA 2 | Bodcau Bayou Bridge On La 2 | Bridge Replacement | $2,500,000 to $5,000,000 | 0.77 | Brauner, Kurt | Dec 2008 |
| Webster | Jun 2010 | 451-03-0062 | I 20 | I-20 @ La 531 & La 532 | Extension Of Eb & Wb Acceleration L | $500,000 to $1,000,000 | 3.17 | Maddox, Don | |
| Webster | Jul 2010 | 001-04-0036 | US 80 | Us 80 Thru Dixie Inn | Overlay | $1,000,000 to $2,500,000 | 2.44 | Chenevert, Mark | |
| Webster | Jul 2010 | 001-05-0018 | US 80 | Lm 1.78 - Bienville Ph. Line | Widen and Overlay | $2,500,000 to $5,000,000 | 5.79 | Chenevert, Mark | |
| Webster | Jul 2010 | 713-60-0011 | North Giles Street Bridge | Bridge Replacement | $250,000 to $500,000 | 0.01 | Pentek, Gary | ||
| West Carroll | Jun 2010 | 185-03-0026 | LA 577 | Weens Road - La 17 | Chip Seal 2 | $250,000 to $500,000 | 5.17 | Chenevert, Mark | |
| West Carroll | Jun 2010 | 862-04-0004 | LA 588 | La 17 - End Of Control | Chip Seal 2 | $250,000 to $500,000 | 6.31 | Chenevert, Mark | |
| West Carroll | Jun 2010 | 862-14-0011 | LA 589 | La 17 - Butler Rd. | Stabilize Base and Overlay | $1,000,000 to $2,500,000 | 3.50 | Chenevert, Mark | |
| West Feliciana | May 2010 | 713-63-0103 | Harris Cornor Rd & Peterson Rd Brid | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| Winn | May 2010 | 022-02-0037 | US 84 | Wolf Creek - Jct US 167 | Patch Cold Plane and Overlay | $1,000,000 to $2,500,000 | 4.81 | Chenevert, Mark | |
| Winn | May 2010 | 023-05-0045 | US 84 | Winnfield Signl Imp On Us84 & Us167 | Computer Traffic Signal Upgrade | $250,000 to $500,000 | 2.18 | Drake, Bill | |
| Winn | May 2010 | 365-03-0011 | LA 472 | Grant Ph. Line - US 167 | Ctb and Overlay | $1,000,000 to $2,500,000 | 9.46 | Chenevert, Mark | |
| Winn | May 2010 | 737-64-0001 | Gum Spring Rd Signing & Striping | Signing and Striping Installation | $100,000 to $250,000 | 0.00 | Monaghan, Terri | ||
| Winn | Jun 2010 | 022-02-0035 | US 84 | Us 84 Slide Repair | Construction to Repair Slide | $1,000,000 to $2,500,000 | 0.15 | Hicks, Melvin | Nov 2009 |