Projects to be Let in the Next 6 Months - By Parish
PLEASE NOTE:
Projects TENTATIVELY scheduled to be let within the next 6 months. The Letting Dates are contingent upon availability of funds and completion of all pre-construction activities.
| Parish | Letting Date |
Project | Route | Project Name | Type Improvement | Estimated Cost Range |
Length (miles) |
Project Manager | Util Clear Date |
|---|---|---|---|---|---|---|---|---|---|
| Acadia | Sep 2010 | 450-04-0098 | I 10 | Girder Riser Repair (Brpm) | Repair Girder Risers | $100,000 to $250,000 | 0.04 | Draughon, Steve | |
| Acadia | Sep 2010 | 801-29-0005 | LA1105 | La 370 - La 95 | Stabilize Base , Overlay | $1,000,000 to $2,500,000 | 2.05 | Chenevert, Mark | |
| Acadia | Feb 2011 | 003-10-0020 | US 90 | Us 90 @ La 1111 Spur Intr Imp | Intersection Improvement | $250,000 to $500,000 | 0.27 | Drake, Bill | |
| Allen | Sep 2010 | 012-07-0017 | US 190 | Us 190 (Us 165 - La 99) | Patch, Cold Plane and Overlay | $1,000,000 to $2,500,000 | 4.72 | Chenevert, Mark | |
| Allen | Sep 2010 | 014-03-0044 | US 165 | .58mi.N.Lauderdale Rd-1.12mi S.La26 | Asphalt Overlay | $1,000,000 to $2,500,000 | 2.72 | Chenevert, Mark | |
| Allen | Sep 2010 | 014-04-0051 | US 165 | 7.11 Mi.N.La 26-rapides Parish Line | Asphalt Overlay | $2,500,000 to $5,000,000 | 13.76 | Chenevert, Mark | |
| Allen | Sep 2010 | 713-02-0130 | Guidry Road Bridge | Bridge Replacement | $250,000 to $500,000 | 0.00 | Pentek, Gary | ||
| Allen | Oct 2010 | 713-02-0125 | Carrier & Monceaux Road Bridges | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| Allen | Nov 2010 | 713-02-0127 | Burnett Town Rd & Green Oak Rd Brs. | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| Ascension | Oct 2010 | 803-27-0007 | LA 941 | La 941 Over I-10 Girder Repair | Girder Repair | $500,000 to $1,000,000 | 0.09 | Brauner, Kurt | |
| Ascension | Feb 2011 | 264-02-0011 | LA 74 | Eb Lt. & Wb Rt.Turn Lanes @la928 | Left & Right Turn Lanes | $250,000 to $500,000 | 0.29 | Drake, Bill | |
| Assumption | Oct 2010 | 742-04-0100 | Assumption Pr.Police Jury Sr2s | Sidewalks and Ped. Bridge Imp. | $250,000 to $500,000 | 0.01 | Parsons, Brian | ||
| Avoyelles | Oct 2010 | 744-05-0017 | Simmesport Sidewalk Imp, Phase 1 | Sidewalks and Related Work | $100,000 to $250,000 | 0.00 | Horton, Valerie | ||
| Avoyelles | Nov 2010 | 374-03-0023 | LA 451 | Iron Br.Crossing-pomme De Terre Res | Patch and Overlay | $500,000 to $1,000,000 | 5.44 | Chenevert, Mark | |
| Beauregard | Dec 2010 | 188-01-0011 | LA 112 | La 112 ( Us171 - La 399) | Patch,Coldplane,Overlay | $2,500,000 to $5,000,000 | 10.49 | Chenevert, Mark | |
| Beauregard | Feb 2011 | 012-05-0035 | LA 12 | Calcasieu Parish Line - US 171 | Chip Seal- Single | $250,000 to $500,000 | 9.70 | Broadbent, Ronald | |
| Beauregard | Feb 2011 | 132-01-0014 | LA 111 | Us 190 - Vernon Parish Line | Chip Seal-single | $0 to $100,000 | 2.42 | Broadbent, Ronald | |
| Bienville | Oct 2010 | 067-04-0029 | LA 4 | La 9 - East Jct La 155 | Widen and Overlay | $1,000,000 to $2,500,000 | 8.13 | Chenevert, Mark | |
| Bienville | Oct 2010 | 093-02-0006 | LA 501 | Fouse Bayou Bridge | Bridge Replacement | $1,000,000 to $2,500,000 | 0.40 | Bucci, Mark | Jul 2010 |
| Bienville | Dec 2010 | 043-05-0023 | LA7982 | Arcadia Sidewalk Program, Phase II | New Sidewalks | $250,000 to $500,000 | 1.41 | Horton, Valerie | |
| Bienville | Feb 2011 | 067-02-0019 | LA 4 | S.Jct US 371 - Log Mile 1.41 | Chip Seal | $0 to $100,000 | 1.41 | Broadbent, Ronald | |
| Bienville | Feb 2011 | 089-05-0015 | LA 151 | I-20 - Lincoln Parish Line | Chip Seal | $0 to $100,000 | 2.42 | Broadbent, Ronald | |
| Bienville | Feb 2011 | 451-04-0064 | I 20 | Frontage Road At La 151 | Chip Seal | $0 to $100,000 | 1.13 | Broadbent, Ronald | |
| Bossier | Sep 2010 | 121-01-0026 | LA 527 | Us 71 - La 157 | Overlay | $1,000,000 to $2,500,000 | 6.12 | Chenevert, Mark | |
| Bossier | Sep 2010 | 742-08-0005 | Bossier Pr.School Board Sr2s Proj. | Sidewalks,Crossings,Bike Rack,Etc. | $250,000 to $500,000 | 0.00 | Parsons, Brian | ||
| Bossier | Oct 2010 | 010-06-0071 | US 71 | Us 71 At La 527 | Traffic Flow Improv/Sb Lt Turn Lane | $250,000 to $500,000 | 0.26 | Baugh, Sam | |
| Bossier | Jan 2011 | 010-05-0033 | US 71 | Bienville Parish Line - Nincock | Chip Seal | $0 to $100,000 | 2.26 | Broadbent, Ronald | |
| Bossier | Jan 2011 | 808-06-0018 | LA 7822 | La 782-2(Industrial Dr)improvements | Traffic Flow Improvements | $250,000 to $500,000 | 0.70 | Drake, Bill | |
| Bossier | Jan 2011 | 808-07-0056 | LA3105 | Shed Road - I-220 | Pccp Patch | $100,000 to $250,000 | 1.81 | Broadbent, Ronald | |
| Caddo | Sep 2010 | 455-09-0006 | I 49 | I-49 North (La 170 - US 71) Seg E | New Interstate (Segment E) | $30,000,000 to $50,000,000 | 2.77 | Umeozulu, Joe | May 2010 |
| Caddo | Oct 2010 | 045-01-0021 | LA 1 | Jct La 173 - Jct La 169(Const) | Widen to 4 Lanes | $30,000,000 to $50,000,000 | 5.20 | Burst, Jeffery | |
| Caddo | Oct 2010 | 455-09-0005 | I 49 | I-49 North (La 530 - La 170) Seg F | New Interstate (Segment F) | $20,000,000 to $30,000,000 | 3.29 | Umeozulu, Joe | May 2010 |
| Caddo | Oct 2010 | 455-09-0011 | I 49 | I-49 North (La 169 - La 530) Seg G | New Interstate (Segment G) | $30,000,000 to $50,000,000 | 4.78 | Umeozulu, Joe | Jun 2010 |
| Caddo | Oct 2010 | 737-09-0102 | LA 526 | Shreveport Intermediate ITS Phase 2 | Its/Emergency Operation | $2,500,000 to $5,000,000 | 0.01 | Delaney, Elizabeth | |
| Caddo | Dec 2010 | 455-08-0080 | I 49 | La 526 - I-20 | Pccp Patch | $100,000 to $250,000 | 6.86 | Broadbent, Ronald | |
| Caddo | Feb 2011 | 011-02-0017 | US 71 | Doe Slough Canal Bridge | Bridge Replacement | $500,000 to $1,000,000 | 0.40 | Musa, Elnur | Aug 2010 |
| Caddo | Feb 2011 | 045-01-0031 | LA 1 | Us 71 - La 538 | Mill, Inlay Overlay | $1,000,000 to $2,500,000 | 3.33 | Chenevert, Mark | |
| Caddo | Feb 2011 | 451-01-0130 | I 20 | Monkhouse - Lakeshore Drive | Pcc Patching | $1,000,000 to $2,500,000 | 3.85 | Thomas, Ben | |
| Calcasieu | Sep 2010 | 197-02-0022 | LA 383 | Second St. - Union Pacific Railroad | Subbas, Base Reconst., Overlay | $250,000 to $500,000 | 0.20 | Chenevert, Mark | |
| Calcasieu | Sep 2010 | 742-10-0114 | Elliot Rd @ Gauthier | Add Turn Lanes and Signals | $1,000,000 to $2,500,000 | 0.00 | Waguespack, Brent | Mar 2009 | |
| Calcasieu | Nov 2010 | 810-25-0010 | LA3063 | La 109 - West St | Widen and Overlay | $1,000,000 to $2,500,000 | 3.06 | Chenevert, Mark | |
| Calcasieu | Dec 2010 | 195-04-0026 | LA 385 | Coulee Bridge | Bridge Replacement | $1,000,000 to $2,500,000 | 0.07 | Leonard, Guy | Jul 2010 |
| Calcasieu | Dec 2010 | 450-91-0178 | I 10 | I-10 Calcasieu River Bridge Repairs | Bridge Reconditioning | $7,500,000 to $10,000,000 | 1.25 | Mumphrey, Ray | |
| Calcasieu | Jan 2011 | 195-04-0021 | LA 385 | La 385 @ La 1138-2 In L.C. | Reconstruction | $1,000,000 to $2,500,000 | 0.10 | Waguespack, Brent | Oct 2008 |
| Caldwell | Sep 2010 | 166-01-0027 | LA 561 | La 133 - Richland Line | Ast Extra Ob Limit Ffy 09-10 | $0 to $100,000 | 0.84 | Chenevert, Mark | |
| Caldwell | Sep 2010 | 171-01-0010 | LA 133 | La 561 - La 847 | Ast | $0 to $100,000 | 1.65 | Chenevert, Mark | |
| Caldwell | Feb 2011 | 068-04-0032 | LA 4 | Jackson Ph Line - Buckskin Road | Microsurfacing M3 & Ast A-7 | $1,000,000 to $2,500,000 | 18.00 | Chenevert, Mark | |
| Cameron | Feb 2011 | 384-01-0022 | LA 82 | 0.23mi.W.Deep B.Rd.-0.03mi.W.Middle | Microsurfacing | $250,000 to $500,000 | 3.46 | Broadbent, Ronald | |
| Catahoula | Sep 2010 | 041-02-0029 | LA 124 | Rawson Creek - Boothe Bend Road | Stabilize Base and Overlay | $1,000,000 to $2,500,000 | 5.13 | Chenevert, Mark | |
| Claiborne | Jan 2011 | 027-06-0033 | US 79 | Log Mile 10.94 - Spring Drive | Mill and Overlay | $1,000,000 to $2,500,000 | 2.87 | Chenevert, Mark | |
| Claiborne | Feb 2011 | 295-02-0005 | LA 519 | Bienville Parish Line - La 518 | Chip Seal | $100,000 to $250,000 | 6.18 | Broadbent, Ronald | |
| Concordia | Jan 2011 | 178-02-0022 | LA 129 | La 907 -la 565 | Patch and Overlay | $1,000,000 to $2,500,000 | 4.98 | Chenevert, Mark | |
| DeSoto | Sep 2010 | 106-01-0010 | LA 177 | La 175 - La 346 | Ac Overlay | $1,000,000 to $2,500,000 | 7.30 | Chenevert, Mark | |
| DeSoto | Sep 2010 | 297-01-0012 | LA 764 | Us 84 - Texas State Line | Widen and Overlay | $1,000,000 to $2,500,000 | 3.41 | Chenevert, Mark | |
| DeSoto | Sep 2010 | 713-16-0111 | Reddix & Hunter Road Bridges | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| DeSoto | Sep 2010 | 816-05-0012 | LA 765 | La 764 - Texas State Line | Widening,Overlay | $1,000,000 to $2,500,000 | 2.19 | Chenevert, Mark | |
| DeSoto | Sep 2010 | 816-11-0002 | LA3276 | Us 171(Stonewall)- I-49 | Recon W/Geometric Improvements | $10,000,000 to $15,000,000 | 4.50 | Smith, David | Aug 2010 |
| DeSoto | Oct 2010 | 713-16-0113 | Hunter Rd & George Hunt Rd 2 Bridge | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| DeSoto | Dec 2010 | 035-04-0016 | LA 175 | La 175 @ US 84 Intersection Imprvmt | Intersection Improvement | $500,000 to $1,000,000 | 0.12 | Drake, Bill | Jun 2010 |
| DeSoto | Jan 2011 | 301-02-0015 | LA 483 | La 512 - La 175 | Chip Seal | $0 to $100,000 | 1.55 | Broadbent, Ronald | |
| District 02 | Sep 2010 | 737-92-0078 | District 02 Pavement Marking Replac | Pavement Marking Replacement | $2,500,000 to $5,000,000 | 0.00 | Colvin, Jody | ||
| District 02 | Sep 2010 | 737-92-0089 | Dist 02 Centerline Rumble Strips | Rumble Strips | $500,000 to $1,000,000 | 0.00 | Colvin, Jody | ||
| District 02 | Oct 2010 | 737-92-0091 | I 10 | Interstate Signage Upgrade-dist 02 | Signing | $500,000 to $1,000,000 | 0.01 | Dale, Alan | |
| District 03 | Sep 2010 | 737-93-0056 | District 03 Pavement Marking Replac | Pavement Marking Replacement | $1,000,000 to $2,500,000 | 0.00 | Colvin, Jody | ||
| District 03 | Sep 2010 | 737-93-0070 | Dist 03 Centerline Rumble Strips | Rumble Strips | $1,000,000 to $2,500,000 | 0.00 | Colvin, Jody | ||
| District 03 | Oct 2010 | 737-93-0072 | I 49 | Interstate Signage Upgrade-dist 03 | Signing | $500,000 to $1,000,000 | 0.01 | Dale, Alan | |
| District 04 | Sep 2010 | 737-94-0058 | District 04 Pavement Marking Replac | Pavement Marking Replacement | $2,500,000 to $5,000,000 | 0.00 | Colvin, Jody | ||
| District 04 | Oct 2010 | 737-94-0072 | I 220 | Interstate Signage Upgrade-dist 04 | Signing | $500,000 to $1,000,000 | 0.01 | Dale, Alan | |
| District 05 | Sep 2010 | 737-95-0043 | Dist. 05 Centerline Rumble Strips | Rumble Strips | $1,000,000 to $2,500,000 | 0.00 | Colvin, Jody | ||
| District 05 | Oct 2010 | 737-95-0040 | District 05 Pavement Marking Replac | Pavement Marking Replacement | $2,500,000 to $5,000,000 | 0.00 | Colvin, Jody | ||
| District 05 | Oct 2010 | 737-95-0044 | I 20 | Interstate Signage Upgrade-dist 05 | Signing | $500,000 to $1,000,000 | 0.01 | Dale, Alan | |
| District 07 | Sep 2010 | 737-97-0043 | District 07 Pavement Marking Replac | Pavement Marking Replacement | $500,000 to $1,000,000 | 0.00 | Colvin, Jody | ||
| District 07 | Oct 2010 | 737-97-0048 | Dist. 07 Centerline Rumble Strips | Rumble Strips | $1,000,000 to $2,500,000 | 0.00 | Colvin, Jody | ||
| District 07 | Oct 2010 | 737-97-0050 | I 10 | Interstate Signage Upgrade-dist 07 | Signing | $500,000 to $1,000,000 | 0.01 | Dale, Alan | |
| District 08 | Oct 2010 | 737-98-0045 | Dist 08 Centerline Rumble Strips | Rumble Strips | $1,000,000 to $2,500,000 | 0.00 | Colvin, Jody | ||
| District 08 | Oct 2010 | 737-98-0048 | I 49 | Interstate Signage Upgrade-dist 08 | Signing | $250,000 to $500,000 | 0.01 | Dale, Alan | |
| District 08 | Oct 2010 | 737-98-0050 | Dist 08 Pvmt Marking Replacement | Striping/Pavement Marking | $1,000,000 to $2,500,000 | 0.00 | Colvin, Jody | ||
| District 58 | Sep 2010 | 737-91-0031 | District 58 Pavement Marking Replac | Pavement Marking Replacement | $1,000,000 to $2,500,000 | 0.00 | Colvin, Jody | ||
| District 58 | Sep 2010 | 737-91-0037 | Dist 58 Centerline Rumble Strips | Rumble Strips | $1,000,000 to $2,500,000 | 0.00 | Colvin, Jody | ||
| District 58 | Feb 2011 | 737-91-0035 | Dist.58 Br.Polymer Comp Micro-olay | Bridge Polymer Comp Micro-overlay | $500,000 to $1,000,000 | 0.00 | Mason, Ken | ||
| District 61 | Sep 2010 | 737-96-0058 | Br-n.O.Intell.Trans.System (Its) | Its/Emergency Operation | $7,500,000 to $10,000,000 | 0.00 | Delaney, Elizabeth | ||
| District 61 | Sep 2010 | 737-96-0088 | I 10 | Dist 61 Pvmt Marking Replacement | Striping/Pavement Markings | $1,000,000 to $2,500,000 | 0.01 | Colvin, Jody | |
| District 61 | Oct 2010 | 737-96-0085 | Dist 61 Centerline Rumble Strips | Rumble Strips | $1,000,000 to $2,500,000 | 0.00 | Colvin, Jody | ||
| District 61 | Oct 2010 | 737-96-0087 | I 10 | Interstate Signage Upgrade-dist 61 | Signing | $1,000,000 to $2,500,000 | 0.01 | Dale, Alan | |
| District 62 | Sep 2010 | 737-90-0070 | District 62 Pavement Marking Replac | Pavement Marking Replacement | $1,000,000 to $2,500,000 | 0.00 | Colvin, Jody | ||
| District 62 | Sep 2010 | 737-90-0087 | Dist 62 Centerline Rumble Strips | Rumble Strips | $1,000,000 to $2,500,000 | 0.00 | Colvin, Jody | ||
| District 62 | Oct 2010 | 737-90-0088 | I 10 | Interstste Signage Upgrade-dist 62 | Signing | $1,000,000 to $2,500,000 | 0.01 | Dale, Alan | |
| District 62 | Dec 2010 | 737-90-0086 | District 62 Signal Upgrades | Rebuild 7 Signal & 7 Flash Beacon | $1,000,000 to $2,500,000 | 0.00 | Colvin, Jody | ||
| East Baton Rouge | Sep 2010 | 258-32-0026 | LA3064 | La 427 - La 73 | Concrete Patching | $1,000,000 to $2,500,000 | 1.86 | Chenevert, Mark | |
| East Baton Rouge | Oct 2010 | 742-17-0153 | S.Harrell's Ferry @ S.Sherwood Blvd | Intersection Improvement | $1,000,000 to $2,500,000 | 0.00 | Riggs, Laura | Jul 2010 | |
| East Baton Rouge | Oct 2010 | 742-17-0163 | Signal Synchronization System B.R. | Signal Synchronization | $250,000 to $500,000 | 0.01 | Riggs, Laura | ||
| East Baton Rouge | Oct 2010 | 744-17-0031 | Farr Park Bicycle Trail | Side Walks/Bike Path | $100,000 to $250,000 | 0.34 | Horton, Valerie | ||
| East Baton Rouge | Dec 2010 | 077-05-0043 | Br Computer Sig. Sync Ph V Part a | Signal Synchronization @ 47 Ints. | $5,000,000 to $7,500,000 | 0.00 | Riggs, Laura | ||
| East Baton Rouge | Dec 2010 | 742-17-0155 | Jones Creek Road Improvement | Clearing & Grubbing | $250,000 to $500,000 | 0.01 | Riggs, Laura | Sep 2010 | |
| East Baton Rouge | Jan 2011 | 254-02-0051 | LA 37 | La 37 At Central Thruway | New 2 Lanes (Concrete Pavement) | $5,000,000 to $7,500,000 | 0.27 | Riggs, Laura | Oct 2010 |
| East Baton Rouge | Jan 2011 | 742-06-0044 | Millerville(I-12-h.F. Rd) | Widen to 5 Lanes | $2,500,000 to $5,000,000 | 0.39 | Riggs, Laura | Oct 2010 | |
| East Feliciana | Sep 2010 | 252-04-0015 | LA 68 | La 10 - La 952 | Stabilize Base and Overlay | $2,500,000 to $5,000,000 | 7.25 | Chenevert, Mark | |
| East Feliciana | Sep 2010 | 819-05-0014 | LA 68 | La 68 (La 952 - La 19) | Stabilize and Overlay | $250,000 to $500,000 | 0.71 | Chenevert, Mark | |
| Franklin | Feb 2011 | 026-06-0065 | US 425 | N.Jct La 3210 - La 3201 (Nb) (P.M.) | Microsurfacing | $250,000 to $500,000 | 2.55 | Broadbent, Ronald | |
| Franklin | Feb 2011 | 036-02-0033 | LA 4 | Scriber Rd - 0.5 Mi.W. La 135 | Widen,Stabilize and Overlay | $1,000,000 to $2,500,000 | 0.84 | Chenevert, Mark | Jan 2011 |
| Franklin | Feb 2011 | 036-04-0066 | LA 17 | Us 425 - Locust Street (P.M.) | Microsurfacing | $0 to $100,000 | 0.31 | Broadbent, Ronald | |
| Franklin | Feb 2011 | 051-01-0010 | LA 864 | Us 425 - La 17 (P.M.) | Microsurfacing | $100,000 to $250,000 | 0.96 | Broadbent, Ronald | |
| Grant | Sep 2010 | 737-22-0002 | Systematic Rural Rdway Departur Imp | Various Rts In Grant & Rapides Par | $250,000 to $500,000 | 0.00 | Chapman, Jim | ||
| Grant | Oct 2010 | 009-02-0019 | US 71 | La 492 - La 8 | Patch,C.P,Interlay,Olay,Chip Seal S | $2,500,000 to $5,000,000 | 6.28 | Chenevert, Mark | |
| Grant | Nov 2010 | 076-02-0019 | LA 123 | La 123 - La 524 Sight Flare Imp. | Sight Flare Improvement | $0 to $100,000 | 0.30 | Hicks, Melvin | |
| Iberia | Oct 2010 | 399-02-0015 | LA 671 | Us 90 - La 182 | Base Replacmnt;extra Ob Limit Ffy10 | $7,500,000 to $10,000,000 | 1.80 | Draughon, Steve | Jul 2010 |
| Iberia | Nov 2010 | 737-23-0007 | New Iberia (Jeff.Terrace & E.Dale) | Traffic Signal Project | $100,000 to $250,000 | 0.00 | Monaghan, Terri | ||
| Iberia | Nov 2010 | 823-31-0005 | LA 680 | La 86-0.227 Mi Se St.Martin Ph Line | Base Rehab and Overlay | $500,000 to $1,000,000 | 1.23 | Chenevert, Mark | |
| Iberia | Jan 2011 | 424-04-0055 | US 90 | Us 90 Service Roads - Capt Cade Rd. | New Asphalt Pavement | $1,000,000 to $2,500,000 | 0.50 | Draughon, Steve | Sep 2010 |
| Iberville | Sep 2010 | 219-02-0024 | LA 77 | Indian Village - La 386 | Mill and Overlay | $2,500,000 to $5,000,000 | 9.73 | Chenevert, Mark | |
| Iberville | Sep 2010 | 257-01-0017 | LA 75 | Saint Gabriel Sidewalks, Phase 2 | New Sidewalks & 2 Ped Bridges | $1,000,000 to $2,500,000 | 0.01 | Horton, Valerie | |
| Iberville | Sep 2010 | 650-99-0030 | Landing Barge Apron Modifications | Repl Winch Sys W Hydraulic Actuated | $500,000 to $1,000,000 | 0.00 | Reed, Kevin | ||
| Jackson | Sep 2010 | 023-06-0065 | US 167 | Winn Parish Line - Jonesboro | Asphalt Overlay | $2,500,000 to $5,000,000 | 4.79 | Chenevert, Mark | |
| Jackson | Feb 2011 | 068-02-0014 | LA 146 | La. 146 Bridges Near Chatham | Bridge Replacement | $5,000,000 to $7,500,000 | 4.40 | Peltier, Justin | Aug 2010 |
| Jackson | Feb 2011 | 320-01-0010 | LA 147 | La 4 (Jonesboro) - La 505 | Chip Seal Double | $250,000 to $500,000 | 5.10 | Broadbent, Ronald | |
| Jefferson | Sep 2010 | 062-01-0031 | LA 18 | Fourth St. - US 90 Bus. | Cold Plane and Overlay | $500,000 to $1,000,000 | 0.50 | Chenevert, Mark | |
| Jefferson | Sep 2010 | 063-02-0056 | LA 18 | Weyer Ave - La 560-2 | Cold Plane and Overlay | $1,000,000 to $2,500,000 | 2.31 | Chenevert, Mark | |
| Jefferson | Sep 2010 | 249-90-0042 | LA 45 | Jean Lafitte (La 3134-pipeline St) | Patch, Cold Plane & Overlay | $1,000,000 to $2,500,000 | 4.30 | Chenevert, Mark | |
| Jefferson | Oct 2010 | 283-09-0145 | US 90B | Frontage Road Minor Olay & Ramp Rep | Minor Overlay | $100,000 to $250,000 | 0.05 | Broadbent, Ronald | |
| Jefferson | Oct 2010 | 450-15-0099 | I 10 | Veterans - Clearview | Ramp Connectors | $50,000,000 to $70,000,000 | 1.23 | Richard, Ryan | Sep 2010 |
| Jefferson | Oct 2010 | 450-15-0143 | I 10 | I10 @ Airprt Access Rd Entrnce Ramp | Level Approach Slab | $100,000 to $250,000 | 0.04 | Drake, Bill | |
| Jefferson | Nov 2010 | 064-01-0046 | LA 1 | La 1 Patch & Olay Repair From Ike | Patch and Overlay | $1,000,000 to $2,500,000 | 4.10 | Drake, Bill | |
| Jefferson | Nov 2010 | 249-01-0055 | LA 45 | La 45/Lapalco Blvd(Lm 1.67) | Add 2 Additional Travel Lanes | $2,500,000 to $5,000,000 | 1.99 | Chenevert, Mark | |
| Jefferson | Nov 2010 | 429-02-0031 | LA3134 | Barataria Widening (Lapalco-ames) | Turn Lanes | $0 to $100,000 | 0.07 | Chenevert, Mark | |
| Jefferson | Dec 2010 | 742-26-0089 | Veterans@lake,Carolton,Papworth,Etc | Intersection Signal Improvements | $500,000 to $1,000,000 | 0.00 | Branton, Jennifer | ||
| Jefferson Davis | Sep 2010 | 054-04-0026 | LA 26 | La 26 (Us 190 - La 102) | Patch,Cold-plane,Overlay,Stab.Sho. | $2,500,000 to $5,000,000 | 9.07 | Chenevert, Mark | |
| Jefferson Davis | Sep 2010 | 450-03-0084 | I 10 | I-10 Slope Adjustments | Correcting Grade and Cross Slopes | $500,000 to $1,000,000 | 1.34 | Landry, Pat | |
| Jefferson Davis | Oct 2010 | 744-27-0006 | Sherman Street Sidewalk | Sidewalk and Related Work | $100,000 to $250,000 | 0.00 | Horton, Valerie | ||
| Lafayette | Sep 2010 | 828-12-0021 | LA 339 | Verot School Road (C & G) | Clear and Grub and Outfall Drainage | $10,000,000 to $15,000,000 | 3.19 | Grice, Bill | Mar 2010 |
| Lafayette | Jan 2011 | 391-02-0011 | LA 98 | La 98 Microsurfacing | Microsurfacing | $250,000 to $500,000 | 3.86 | Broadbent, Ronald | |
| Lafayette | Jan 2011 | 391-02-0012 | LA 98 | La 98 Overlay | Mill and Overlay | $250,000 to $500,000 | 4.01 | Broadbent, Ronald | |
| Lafourche | Oct 2010 | 065-06-0040 | LA 20 | Grand Bayou Bridge | Bridge Replacement | $2,500,000 to $5,000,000 | 0.40 | Toney, Patrick | Jul 2010 |
| Lafourche | Nov 2010 | 713-58-0011 | Alario Bridge In Golden Meadow | New Bridge | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| LaSalle | Sep 2010 | 015-05-0062 | US 165 | Grant Line - US 84 | Cold Plane and Overlay | $500,000 to $1,000,000 | 3.54 | Chenevert, Mark | |
| LaSalle | Sep 2010 | 022-04-0039 | US 84 | Winn Ph.Line - US 165 | Cold Plane and Overlay | $500,000 to $1,000,000 | 1.90 | Chenevert, Mark | |
| LaSalle | Sep 2010 | 127-02-0028 | LA 127 | Us 165 - La 125 | Asphalt Overlay | $250,000 to $500,000 | 0.71 | Chenevert, Mark | |
| Livingston | Nov 2010 | 013-06-0055 | US 190 | Jct. Local Road - East Jct. La 63 | Asphalt Patching | $100,000 to $250,000 | 0.41 | Broadbent, Ronald | |
| Livingston | Nov 2010 | 013-07-0028 | US 190 | East Jct. La 63 - Jct. Local Road | Asphalt Patching | $0 to $100,000 | 0.14 | Broadbent, Ronald | |
| Livingston | Nov 2010 | 272-02-0015 | LA 63 | La 444 - La 42 | Cold Plane,Base,Drainage & Overlay | $1,000,000 to $2,500,000 | 4.50 | Chenevert, Mark | |
| Livingston | Feb 2011 | 271-01-0015 | LA 449 | W.Jct La 63 - St.Helena Parish Line | Chip Seal, Single | $100,000 to $250,000 | 3.42 | Broadbent, Ronald | |
| Madison | Sep 2010 | 713-33-0110 | Steve Ogden Rd Br Over Bayou Macon | Bridge Replacement | $1,000,000 to $2,500,000 | 0.00 | Pentek, Gary | ||
| Morehouse | Sep 2010 | 016-04-0025 | US 165 | Washington St. - La 3051 | Asphalt Overlay | $1,000,000 to $2,500,000 | 2.62 | Chenevert, Mark | |
| Morehouse | Dec 2010 | 834-17-0006 | LA3051 | Drainage Canal Bridges Morehouse Ph | Bridge Replacement | $1,000,000 to $2,500,000 | 0.50 | Gaudry, Carl | Sep 2010 |
| Natchitoches | Sep 2010 | 034-30-0025 | LA 1 | La 1 At La 6 (Pm) | Cold Plane and Overlay | $250,000 to $500,000 | 0.34 | Broadbent, Ronald | |
| Natchitoches | Oct 2010 | 116-03-0004 | LA 478 | Bayou Provencal Bridge | Bridge Replacement | $1,000,000 to $2,500,000 | 0.40 | Herath, Ananda | Aug 2010 |
| Natchitoches | Nov 2010 | 713-35-0112 | Kisatchie Falls Bridge | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| Natchitoches | Nov 2010 | 713-35-0118 | Quick Road Br Over Demery Creek | Bridge Replacement | $100,000 to $250,000 | 0.00 | Pentek, Gary | ||
| Natchitoches | Nov 2010 | 713-35-0120 | Good Hope Road Bridges | Bridge Replacement;luce&kisatchie B | $1,000,000 to $2,500,000 | 0.02 | Pentek, Gary | ||
| Natchitoches | Nov 2010 | 713-35-0124 | Russell Cemetery Road Bridge | Bridge Replacement | $250,000 to $500,000 | 0.00 | Pentek, Gary | ||
| Orleans | Sep 2010 | 006-03-0056 | US 90 | Broad Street (Orleans Ave-gentilly) | Cold Plane and Overlay | $1,000,000 to $2,500,000 | 1.91 | Chenevert, Mark | |
| Orleans | Sep 2010 | 450-17-0029 | I 10 | I-10 Twin Span Existing Bridge Demo | Demolotion Of Twin Spans | $50,000,000 to $70,000,000 | 5.40 | D'andrea, Artur | |
| Orleans | Sep 2010 | 704-36-0045 | Magazine St.(Us 90.B.-.Nashville) | Rehab (Phase 1 Srp) | $5,000,000 to $7,500,000 | 0.00 | Burst, Jeffery | ||
| Orleans | Oct 2010 | 283-08-0198 | US 90B | Frontage Road Minor Olay & Ramp Rep | Minor Overlay | $500,000 to $1,000,000 | 0.21 | Broadbent, Ronald | |
| Orleans | Oct 2010 | 742-36-0122 | Lakefront/Holy Cross Signal Improve | Signal Improvements | $2,500,000 to $5,000,000 | 0.00 | Riggs, Laura | ||
| Orleans | Nov 2010 | 006-05-0087 | US 90 | Chef Menteur Bridge Fender System | Fender System Repairs | $1,000,000 to $2,500,000 | 0.10 | Drake, Bill | |
| Orleans | Dec 2010 | 006-90-0099 | US 90 | Camelot Dr - .4 Mi.E.Gentilly (Ddr) | Cold Plane and Overlay | $2,500,000 to $5,000,000 | 5.20 | Chenevert, Mark | |
| Orleans | Dec 2010 | 006-90-0100 | US 90 | E.End Inner Harbor Br.-old Gentilly | Cold Plane and Overlay | $1,000,000 to $2,500,000 | 2.44 | Chenevert, Mark | |
| Orleans | Dec 2010 | 713-36-0106 | Martin Road Bridge | Bridge Replacement | $1,000,000 to $2,500,000 | 0.00 | Pentek, Gary | ||
| Orleans | Jan 2011 | 409-02-0018 | LA 406 | Leveling Appr Slabs & Improvements | Leveling | $0 to $100,000 | 0.41 | Broadbent, Ronald | |
| Orleans | Jan 2011 | 836-08-0074 | LA 407 | Leveling Appr.Slab and Improvements | Leveling | $100,000 to $250,000 | 1.19 | Broadbent, Ronald | |
| Ouachita | Oct 2010 | 713-37-0129 | Winnfield,Webb Pierce,Garland Gin R | Bridge Replacement | $1,000,000 to $2,500,000 | 0.00 | Pentek, Gary | ||
| Ouachita | Nov 2010 | 713-37-0137 | Hadley Street Bridge | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| Ouachita | Dec 2010 | 742-37-0030 | LA 594 | Garrett Road @ La 594 Turn Lanes | Adding Turn Lanes | $250,000 to $500,000 | 0.08 | Waguespack, Brent | |
| Ouachita | Feb 2011 | 015-31-0044 | US 165 | Youngs Bayou Bridges | Bridge Replacement | $1,000,000 to $2,500,000 | 0.40 | Peltier, Justin | Jan 2010 |
| Plaquemines | Sep 2010 | 046-04-0041 | Plaquemines Par Ferry Emissions Imp | Replace Engines W Energy Efficient | $1,000,000 to $2,500,000 | 0.00 | Reed, Kevin | ||
| Plaquemines | Sep 2010 | 062-05-0042 | LA 23 | La 23 (Near Empire) | Drainage Improvements | $250,000 to $500,000 | 0.54 | Nilforoushan, Mehdi | |
| Plaquemines | Sep 2010 | 062-05-0043 | LA 23 | La 23 (.3 M N Of RR Spur - 2.6 M N) | Patch, Cold Plane & Overlay | $500,000 to $1,000,000 | 1.30 | Chenevert, Mark | |
| Plaquemines | Sep 2010 | 062-05-0044 | LA 23 | La 23(3.48m S Doullut Canal -buras) | Patch, Cold Plane & Overlay | $500,000 to $1,000,000 | 1.80 | Chenevert, Mark | |
| Plaquemines | Sep 2010 | 062-05-0045 | LA 23 | La 23(Civic Dr-plaquemine Hwy. 11) | Patching,Coldplane,Single Lift Olay | $500,000 to $1,000,000 | 2.30 | Artigue, Amanda | |
| Plaquemines | Sep 2010 | 062-05-0046 | LA 23 | La 23(Empire to Fort Jackson) | Patch, Cold Plane & Overlay | $2,500,000 to $5,000,000 | 5.90 | Chenevert, Mark | |
| Plaquemines | Sep 2010 | 062-06-0035 | LA 23 | Jct Buras Rd - 5.4 M S Of Jct | Patch, Cold Plane & Overlay | $5,000,000 to $7,500,000 | 5.40 | Chenevert, Mark | |
| Plaquemines | Sep 2010 | 062-06-0037 | LA 23 | Jct Buras Rd - 6.6 M S Of Jct | Patch, Cold Plane & Overlay | $1,000,000 to $2,500,000 | 6.65 | Chenevert, Mark | |
| Plaquemines | Jan 2011 | 742-38-0006 | F Edward Hebert Blvd Improvements | Cold Plane, Overlay & Bikepath | $1,000,000 to $2,500,000 | 1.39 | Branton, Jennifer | ||
| Pointe Coupee | Oct 2010 | 008-02-0034 | US 190 | Left Turn Lanes @ La77 & La 78/411 | Bridge Replacement | $7,500,000 to $10,000,000 | 1.00 | Guidry, Chris | Oct 2005 |
| Pointe Coupee | Jan 2011 | 052-03-0028 | LA 1 | La 1 Morganza Spillway Bridge Rehab | Bridge Rehabilitation | $2,500,000 to $5,000,000 | 0.78 | Kemp, Kelly | |
| Rapides | Sep 2010 | 840-10-0010 | LA 121 | Jct La 496 - Jct La 1 | Hmac Surfacing | $1,000,000 to $2,500,000 | 9.47 | Chenevert, Mark | |
| Rapides | Dec 2010 | 015-01-0056 | US 165B | Kcs Bridge/Us165-b(Hill Rd.-la3100) | Landscaping | $250,000 to $500,000 | 0.01 | Horton, Valerie | |
| Rapides | Jan 2011 | 014-07-0003 | US 165B | End Traffic Circle - Jct US 167 Bus | Cold Plane and Overlay | $500,000 to $1,000,000 | 1.50 | Broadbent, Ronald | |
| Red River | Jan 2011 | 021-04-0026 | US 84 | Desoto Parish Line - La 1 | Chip Seal | $0 to $100,000 | 2.44 | Broadbent, Ronald | |
| Red River | Jan 2011 | 053-07-0034 | US 84 | Armistead - Log Mile 1.82 | Chip Seal | $0 to $100,000 | 1.82 | Broadbent, Ronald | |
| Red River | Feb 2011 | 010-03-0035 | US 71 | Drainage Imp US 71@us 371 Phase II | Roadway Drainage Improvements | $1,000,000 to $2,500,000 | 0.52 | Nilforoushan, Mehdi | |
| Richland | Sep 2010 | 166-03-0012 | LA 561 | Caldwell Ph. Line - La 132 | Chip Seal 2 | $500,000 to $1,000,000 | 11.00 | Chenevert, Mark | |
| Richland | Sep 2010 | 713-42-0147 | Thomas Road Bridge | Bridge Replacement | $100,000 to $250,000 | 0.00 | Pentek, Gary | ||
| Richland | Oct 2010 | 713-42-0143 | Georgie Ridge Br.Over Boeuf River | Bridge Replacement | $2,500,000 to $5,000,000 | 0.00 | Pentek, Gary | ||
| Sabine | Sep 2010 | 034-02-0041 | LA 6 | Bowyer Lane - Church St | Cold Planing and Re-surfacing | $2,500,000 to $5,000,000 | 6.80 | Chenevert, Mark | |
| St. Bernard | Sep 2010 | 844-02-0024 | LA 624 | Drain Canal Bridge Near Hopedale | Emergency - Bridge Replacement | $1,000,000 to $2,500,000 | 0.28 | Yap, Kian | |
| St. Charles | Sep 2010 | 063-05-0027 | LA 18 | River Rd. (Jefferson P/L - La 52) | Patch, Cold Plane & Overlay | $1,000,000 to $2,500,000 | 6.10 | Chenevert, Mark | |
| St. Charles | Sep 2010 | 063-05-0028 | LA 18 | La 18 (Jefferson Ph.Line - La 52) | Cold Plane and Overlay | $250,000 to $500,000 | 6.08 | Chenevert, Mark | |
| St. Charles | Sep 2010 | 063-06-0028 | LA 18 | La 52 - St. John Parish Line | Cold Plane and Overlay | $2,500,000 to $5,000,000 | 11.68 | Chenevert, Mark | |
| St. Charles | Dec 2010 | 007-03-0057 | US 61 | La 50 - St.John Parish Line | Patch, Cold Plane & Overlay | $5,000,000 to $7,500,000 | 7.09 | Chenevert, Mark | |
| St. Charles | Jan 2011 | 450-36-0035 | I 310 | I-310 Bridge Repair | Bridge Repair | $1,000,000 to $2,500,000 | 0.01 | Johnson, Ennis | |
| St. Charles | Jan 2011 | 450-38-0024 | I 310 | I-310 Bridge Repair | Bridge Repair | $250,000 to $500,000 | 0.01 | Johnson, Ennis | |
| St. Charles | Jan 2011 | 845-03-0020 | LA 52 | Us 90 - La 18 | Cold Plane and Overlay | $1,000,000 to $2,500,000 | 2.73 | Chenevert, Mark | |
| St. Helena | Feb 2011 | 254-05-0028 | LA 37 | E.Feliciana Parish Line - La 448 | Chip Seal, Single | $0 to $100,000 | 3.11 | Broadbent, Ronald | |
| St. Helena | Feb 2011 | 262-30-0007 | LA 63 | N.Jct La 16 - E.Jct La 37 | Chip Seal, Single | $100,000 to $250,000 | 3.71 | Broadbent, Ronald | |
| St. James | Sep 2010 | 063-09-0032 | LA 18 | 1 Mi. N.La 3219 - 6 Mi.N.La 3219 | Minor Overlay | $1,000,000 to $2,500,000 | 5.00 | Broadbent, Ronald | |
| St. John Baptist | Dec 2010 | 744-48-0005 | St.John E.Bank Miss.R.Trail,Phase I | Multi-use Trail Sidewalk/Bike Trail | $500,000 to $1,000,000 | 0.11 | Horton, Valerie | ||
| St. Landry | Sep 2010 | 081-02-0015 | LA 103 | 0.73 Mi. N. Of N.La 31 - US 190 | Stabilize Base, Overlay | $2,500,000 to $5,000,000 | 5.86 | Chenevert, Mark | |
| St. Landry | Sep 2010 | 713-49-0119 | Benny Pitre,Summner & Courtableau | Bridge Replacement | $1,000,000 to $2,500,000 | 0.00 | Pentek, Gary | ||
| St. Landry | Sep 2010 | 713-49-0121 | Little Teche Road Bridge | Bridge Replacement | $500,000 to $1,000,000 | 0.00 | Pentek, Gary | ||
| St. Landry | Sep 2010 | 744-49-0014 | South Beulah Street Sidewalks | New Sidewalks | $100,000 to $250,000 | 0.45 | Horton, Valerie | ||
| St. Mary | Sep 2010 | 424-05-0124 | US 90 | Dist.03 Br.Deck Jt Repairs | Bridge Reconditioning | $500,000 to $1,000,000 | 0.01 | Draughon, Steve | |
| St. Mary | Dec 2010 | 408-02-0011 | LA 87 | La 322 - End Of Maintenance | Cold Plane, Patch and Overlay | $2,500,000 to $5,000,000 | 5.01 | Chenevert, Mark | |
| St. Tammany | Sep 2010 | 454-04-0080 | I 12 | Airport Rd. - I-10/I-59/I-12 | Widen From 4 Lanes to 6 | $30,000,000 to $50,000,000 | 6.15 | Reviere, Ryan | Aug 2010 |
| St. Tammany | Oct 2010 | 450-18-0095 | I 10 | I-10/Oak Harbor Blvd Intr.Landscape | Interchange Landscaping | $100,000 to $250,000 | 0.80 | Horton, Valerie | |
| St. Tammany | Oct 2010 | 744-52-0038 | Pineview Sidewalk Extension | Sidewalks and Related Work | $250,000 to $500,000 | 0.00 | Horton, Valerie | ||
| St. Tammany | Feb 2011 | 269-08-0019 | LA 40 | W. Jct La 437 - E. Jct La 437 | Micro Surfacing | $100,000 to $250,000 | 3.50 | Broadbent, Ronald | |
| Statewide | Sep 2010 | 737-99-1084 | Delta Par Rural Xsection Imp Rsip | Delta Parishes Intersection Improv | $1,000,000 to $2,500,000 | 0.00 | Chapman, Jim | ||
| Statewide | Sep 2010 | 737-99-1102 | Interstate Surface Abrasion | Surface Abrasion | $5,000,000 to $7,500,000 | 0.00 | Chenevert, Mark | ||
| Tangipahoa | Sep 2010 | 017-05-0019 | US 51 | La 16 - N. Jct La 10 | Cold Plane, Patch and Overlay | $1,000,000 to $2,500,000 | 6.93 | Chenevert, Mark | |
| Tangipahoa | Sep 2010 | 261-04-0026 | LA 22 | E Jct La 445 - St Tammany Par Line | Cold Plane,Patch,Olay Pave Shoulder | $1,000,000 to $2,500,000 | 4.04 | Schilling, Allison | |
| Tangipahoa | Sep 2010 | 853-21-0002 | LA1249 | La 22 - La 1040 | Cold Plane,Base,Drainage, & Overlay | $1,000,000 to $2,500,000 | 3.55 | Chenevert, Mark | |
| Tangipahoa | Oct 2010 | 452-90-0155 | I 55 | Us 51 - La 442 | Rubblize & Overlay | $20,000,000 to $30,000,000 | 8.35 | Thomas, Ben | |
| Tangipahoa | Oct 2010 | 452-90-0158 | I 55 | La 442 to La 40 | Rubblize and Overlay | $10,000,000 to $15,000,000 | 3.94 | Thomas, Ben | |
| Tangipahoa | Oct 2010 | 713-53-0121 | Mcelveen Rd & Roseland Ave Bridges | Bridge Replacement | $250,000 to $500,000 | 0.00 | Pentek, Gary | ||
| Tangipahoa | Nov 2010 | 853-39-0010 | LA3158 | Airport Road Roundabout Landscaping | Landscaping | $0 to $100,000 | 0.01 | Horton, Valerie | |
| Tangipahoa | Feb 2011 | 277-02-0006 | LA 10 | Jct La 1061 - Washington Parish Ln. | Chip Seal, Single | $100,000 to $250,000 | 4.38 | Broadbent, Ronald | |
| Tangipahoa | Feb 2011 | 853-03-0010 | LA1051 | Beaver Creek Bridge | Bridge Scour Repair | $250,000 to $500,000 | 0.01 | Guidry, Chris | Nov 2010 |
| Tensas | Sep 2010 | 180-01-0011 | LA 573 | La 128 - La 568 | Ast | $250,000 to $500,000 | 10.46 | Chenevert, Mark | |
| Tensas | Sep 2010 | 186-04-0017 | LA 573 | Cooter Point - La 3044 | Ast | $100,000 to $250,000 | 8.54 | Chenevert, Mark | |
| Tensas | Sep 2010 | 854-11-0022 | LA 604 | La 606 - La 605 | Ast | $100,000 to $250,000 | 8.56 | Chenevert, Mark | |
| Tensas | Dec 2010 | 020-02-0034 | US 65 | La 566 - La 568 | Break,Seat and Overlay | $1,000,000 to $2,500,000 | 2.40 | Chenevert, Mark | |
| Terrebonne | Sep 2010 | 247-02-0035 | LA 56 | La56(N End Boudreaux Canal Br-la 58 | Patch, Cold Plane & Overlay | $1,000,000 to $2,500,000 | 6.16 | Chenevert, Mark | |
| Terrebonne | Sep 2010 | 737-55-0004 | Terrebonne Parish Signal Upgrade | Signalization Upgrade | $1,000,000 to $2,500,000 | 0.00 | Colvin, Jody | ||
| Union | Oct 2010 | 069-02-0022 | LA 33 | Lincoln Ph.Line - La 15 | Asphalt Overlay | $2,500,000 to $5,000,000 | 5.70 | Chenevert, Mark | |
| Vermilion | Dec 2010 | 857-68-0004 | LA3267 | La 14 @ La 3267(Rt Turn Lane La3267 | Right Turn Lane | $250,000 to $500,000 | 0.10 | Drake, Bill | |
| Vermilion | Jan 2011 | 055-03-0009 | LA 14 | La 14 Gueydan | Concrete Patch and Overlay | $250,000 to $500,000 | 0.30 | Broadbent, Ronald | |
| Vermilion | Jan 2011 | 385-05-0012 | LA 92 | La 92 Chip Seal | Chip Seal-double | $100,000 to $250,000 | 3.03 | Broadbent, Ronald | |
| Vernon | Feb 2011 | 373-01-0021 | LA 8 | La 8 Turn Lanes | Turn Lanes | $500,000 to $1,000,000 | 0.73 | Hicks, Melvin | |
| Washington | Sep 2010 | 030-04-0029 | LA 21 | La 10 - N. Jct La 436 | C.P., Patch and Overlay | $2,500,000 to $5,000,000 | 6.51 | Chenevert, Mark | |
| Washington | Nov 2010 | 047-02-0033 | LA 10 | Cont Center Turnlane In Franklinton | Construct Lt Turnlane | $100,000 to $250,000 | 0.17 | Drake, Bill | |
| Washington | Feb 2011 | 030-03-0022 | LA 21 | End Of Control Sectioo - La 10 | Pcc Patching | $250,000 to $500,000 | 2.41 | Broadbent, Ronald | |
| Webster | Oct 2010 | 451-03-0062 | I 20 | I-20 @ La 531 & La 532 | Extension Of Eb & Wb Acceleration L | $500,000 to $1,000,000 | 3.17 | Maddox, Don | |
| Webster | Nov 2010 | 001-04-0036 | US 80 | Us 80 Thru Dixie Inn | Overlay | $1,000,000 to $2,500,000 | 2.44 | Chenevert, Mark | |
| Webster | Feb 2011 | 083-31-0011 | LA 2 | Log Mile 0.74 - Claiborne Ph. Line | Chip Seal | $0 to $100,000 | 1.36 | Broadbent, Ronald | |
| Webster | Feb 2011 | 451-03-0067 | I 20 | Cslm 9.19 - Cslm 9.43 | Novachip | $100,000 to $250,000 | 0.24 | Thomas, Ben | |
| Webster | Feb 2011 | 451-03-0073 | I 20 | Frontage Road East Of Goodwill Road | Chip Seal | $0 to $100,000 | 1.28 | Broadbent, Ronald | |
| West Baton Rouge | Sep 2010 | 050-07-0072 | LA 1 | Icww - US 190 | Cold Plane, Overlay, Concrete Patch | $2,500,000 to $5,000,000 | 6.14 | Riggs, Laura | |
| West Baton Rouge | Feb 2011 | 008-01-0050 | US 190 | E.B. Right Turn Lane @ La 1145 | Turn Lane | $250,000 to $500,000 | 0.10 | Drake, Bill | |
| West Baton Rouge | Feb 2011 | 013-01-0031 | LA 415 | R.Turn Lane On La 415 @ La 987-3 | Turn Lane | $250,000 to $500,000 | 0.19 | Drake, Bill | |
| West Carroll | Sep 2010 | 185-03-0026 | LA 577 | Weens Road - La 17 | Chip Seal 2 | $250,000 to $500,000 | 5.17 | Chenevert, Mark |