Letting of 1/25/2006 LA DOTD Headquarters
| |
|
| DBE GOAL FED |
| Lead Project: 218-01-0018 |
| Parish: LAFAYETTE |
| Routes: LA 93, LA 342 9 td> |
| Description: JUNCTION ROUTE LA 700 - JUNCTION ROUTE US 167 |
Type Const:
grading, drainage structures, cold planing asphaltic concrete, pavement patching
& widening, cement treated base course, superpave asphaltic concrete overlay, & related work |
| | |
| Rank | License | Bidder | Amount |
| 1 | 04089 |
H & S CONSTRUCTION CO., INC. | $6,426,386.94 |
| 2 | 34356 |
PRAIRIE CONTRACTORS INC. | $7,051,887.43 |
|
| |
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - H & S CONSTRUCTION CO., INC. |
- 2 - PRAIRIE CONTRACTORS INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
2,771   |
CUYD |
14.00 |
38,794.00 |
20.00 |
55,420.00 |
|
|
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
2,159   |
CUYD |
16.00 |
34,544.00 |
20.00 |
43,180.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
164   |
EACH |
5.85 |
959.40 |
10.00 |
1,640.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
5   |
EACH |
125.00 |
625.00 |
200.00 |
1,000.00 |
|
|
|
|
| 303-02 |
removal of existing patches
|
1,543   |
SQYD |
35.00 |
54,005.00 |
35.00 |
54,005.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
9,515   |
CUYD |
40.00 |
380,600.00 |
75.00 |
713,625.00 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
35.00 |
17,500.00 |
75.00 |
37,500.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
35,963.3 |
TON |
62.00 |
2,229,724.60 |
69.50 |
2,499,449.35 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,745.7 |
TON |
85.00 |
233,384.50 |
85.00 |
233,384.50 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
161,534   |
SQYD |
1.65 |
266,531.10 |
2.75 |
444,218.50 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 9,082   |
CUYD |
0.01 |
- 90.82 |
0.01 |
- 90.82 |
|
|
|
|
| 701-01-P |
cross drain pipe (54" rcp)
|
100   |
LNFT |
264.50 |
26,450.00 |
300.00 |
30,000.00 |
|
|
|
|
| 701-01-P-01 |
cross drain pipe (54" rcp/pcp/cmp)
|
44   |
LNFT |
264.50 |
11,638.00 |
300.00 |
13,200.00 |
|
|
|
|
| 701-02-E-01 |
cross drain pipe arch (30" equiv. rcpa/cmpa)
|
94   |
LNFT |
164.50 |
15,463.00 |
120.00 |
11,280.00 |
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
172   |
LNFT |
94.00 |
16,168.00 |
65.00 |
11,180.00 |
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
168   |
LNFT |
106.00 |
17,808.00 |
75.00 |
12,600.00 |
|
|
|
|
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
170   |
LNFT |
141.00 |
23,970.00 |
100.00 |
17,000.00 |
|
|
|
|
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
2,042   |
LNFT |
153.00 |
312,426.00 |
100.00 |
204,200.00 |
|
|
|
|
| 701-03-O |
storm drain pipe (48" rcp/pcp)
|
280   |
LNFT |
188.00 |
52,640.00 |
140.00 |
39,200.00 |
|
|
|
|
| 701-07-G |
yard drain pipe (18")
|
48   |
LNFT |
94.00 |
4,512.00 |
40.00 |
1,920.00 |
|
|
|
|
| 701-09 |
fabricating pipe fittings
|
3   |
EACH |
998.00 |
2,994.00 |
500.00 |
1,500.00 |
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
68   |
LNFT |
130.00 |
8,840.00 |
200.00 |
13,600.00 |
|
|
|
|
| 701-12-G |
corrugated metal pipe (extension)(18")
|
24   |
LNFT |
94.00 |
2,256.00 |
100.00 |
2,400.00 |
|
|
|
|
| 701-15 |
concrete collar
|
4   |
EACH |
940.00 |
3,760.00 |
1,500.00 |
6,000.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
7   |
EACH |
4,110.00 |
28,770.00 |
4,000.00 |
28,000.00 |
|
|
|
|
| 702-03-J |
catch basins (sd-03)
|
6   |
EACH |
6,695.00 |
40,170.00 |
6,000.00 |
36,000.00 |
|
|
|
|
| 702-03-K |
catch basins (sd-04)
|
2   |
EACH |
7,045.00 |
14,090.00 |
6,000.00 |
12,000.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
293.7 |
SQYD |
57.00 |
16,740.90 |
80.00 |
23,496.00 |
|
|
|
|
| 712-02 |
sacked concrete revetment
|
29   |
SQYD |
88.00 |
2,552.00 |
100.00 |
2,900.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
165,000.00 |
165,000.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (4" width)
|
13,060   |
LNFT |
0.18 |
2,350.80 |
0.15 |
1,959.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
1,760   |
LNFT |
0.42 |
739.20 |
0.25 |
440.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
1,582   |
LNFT |
1.07 |
1,692.74 |
0.75 |
1,186.50 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
23.072 |
MILE |
376.00 |
8,675.07 |
300.00 |
6,921.60 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
21.056 |
MILE |
371.00 |
7,811.77 |
200.00 |
4,211.20 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
54.078 |
MILE |
743.00 |
40,179.95 |
500.00 |
27,039.00 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
12   |
EACH |
64.00 |
768.00 |
50.00 |
600.00 |
|
|
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
4   |
EACH |
64.00 |
256.00 |
50.00 |
200.00 |
|
|
|
|
| 713-06-F |
temporary pavement legends and symbols (stop ahead)
|
2   |
EACH |
106.00 |
212.00 |
100.00 |
200.00 |
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
9,000.00 |
9,000.00 |
25,000.00 |
25,000.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
828   |
SQYD |
71.00 |
58,788.00 |
70.00 |
57,960.00 |
|
|
|
|
| 724-01-C |
pavement patching (18" minimum thickness)
|
53   |
SQYD |
117.00 |
6,201.00 |
150.00 |
7,950.00 |
|
|
|
|
| 724-02 |
pavement widening
|
211.6 |
SQYD |
115.00 |
24,334.00 |
100.00 |
21,160.00 |
|
|
|
|
| 726-01 |
bedding material
|
1,210.7 |
CUYD |
65.00 |
78,695.50 |
70.00 |
84,749.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
250,000.00 |
250,000.00 |
200,000.00 |
200,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
21   |
EACH |
71.00 |
1,491.00 |
55.00 |
1,155.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
3,016   |
EACH |
6.00 |
18,096.00 |
5.00 |
15,080.00 |
|
|
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
6,530   |
LNFT |
0.53 |
3,460.90 |
0.50 |
3,265.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
880   |
LNFT |
1.07 |
941.60 |
1.00 |
880.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
791   |
LNFT |
3.51 |
2,776.41 |
2.50 |
1,977.50 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
27.039 |
MILE |
2,530.00 |
68,408.67 |
2,000.00 |
54,078.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
10.528 |
MILE |
1,126.00 |
11,854.52 |
700.00 |
7,369.60 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
6   |
EACH |
182.00 |
1,092.00 |
140.00 |
840.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
194.00 |
388.00 |
140.00 |
280.00 |
|
|
|
|
| 732-04-F |
plastic pavement legends & symbols (stop ahead)
|
1   |
EACH |
258.25 |
258.25 |
140.00 |
140.00 |
|
|
|
|
| 732-05 |
removal of existing markings
|
0.095 |
MILE |
6,005.00 |
570.47 |
5,000.00 |
475.00 |
|
|
|
|
| 735-01 |
mailboxes
|
260   |
EACH |
11.75 |
3,055.00 |
1.00 |
260.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
163   |
EACH |
141.00 |
22,983.00 |
125.00 |
20,375.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
30   |
EACH |
194.00 |
5,820.00 |
175.00 |
5,250.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
12   |
EACH |
382.00 |
4,584.00 |
300.00 |
3,600.00 |
|
|
|
|
| 739-01 |
hyrdro-seeding
|
0.82 |
ACRE |
4,537.26 |
3,720.55 |
3,000.00 |
2,460.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
75,000.00 |
75,000.00 |
125,000.00 |
125,000.00 |
|
|
|
|
| S-001 |
cement treated base course (10 inch depth)
|
106,553   |
SQYD |
7.98 |
850,292.94 |
7.25 |
772,509.25 |
|
|
|
|
| S-002 |
cement treatment (12 inch depth)
|
106,553   |
SQYD |
7.64 |
814,064.92 |
7.25 |
772,509.25 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
6,426,386.94 |
|
7,051,887.43 |
|
|
|
|
|
|