Bid Tabs Bid Tabulations February 10, 2006

Letting of 1/25/2006 LA DOTD Headquarters


REBID
go back
Go Back
DBE GOAL FED
Lead Project: 013-13-0027
Parish: ST TAMMANY
Routes: US 190-Y, I-10 9 td>
Description: INTERCHANGE AT US 190 BUSINESS ( SLIDELL )
Type Const: grading, drain struct, class ii bc, superpave acp, pccp, signing, traffic signals,
cip bridge, and related work
 
RankLicenseBidderAmount
134567 JAMES CONSTRUCTION GROUP LLC $20,122,610.07
214807 RICHARD PRICE CONTRACTING CO, LLC $19,903,069.47
306276 BARRIERE CONSTRUCTION CO., LLC. $20,496,969.95
402179 BOH BROS. CONSTRUCTION CO., LLC. $22,336,395.75
 
Item Number Item Description Quantity Unit of Measure - 1 -
JAMES CONSTRUCTION GROUP LLC
- 2 -
RICHARD PRICE CONTRACTING CO, LLC
- 3 -
BARRIERE CONSTRUCTION CO., LLC.
- 4 -
BOH BROS. CONSTRUCTION CO., LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 100,000.00 100,000.00 45,000.00 45,000.00 100,000.00 100,000.00 300,000.00 300,000.00
202-01 removal of structures & obstructions lump      lump 20,000.00 20,000.00 60,000.00 60,000.00 100,000.00 100,000.00 300,000.00 300,000.00
202-02-A removal of bridges (sta. 3+219; 10.23m x 79.21m
concrete slab span bridge)
1      ea 150,000.00 150,000.00 220,000.00 220,000.00 250,000.00 250,000.00 200,000.00 200,000.00
202-02-D removal of concrete walks & drives 1,278      sq m 14.00 17,892.00 8.00 10,224.00 15.00 19,170.00 6.00 7,668.00
202-02-G removal of surfacing & stabilized base 28,005.7    sq m 15.00 420,085.50 5.50 154,031.35 4.00 112,022.80 6.00 168,034.20
202-02-H removal of guard rail 325      ln m 14.00 4,550.00 16.00 5,200.00 12.00 3,900.00 12.00 3,900.00
202-02-I removal of existing sign faces 2      each 90.00 180.00 110.00 220.00 270.00 540.00 110.00 220.00
202-02-J removal of existing shoulder drains 770      ln m 10.00 7,700.00 15.00 11,550.00 12.00 9,240.00 12.00 9,240.00
202-02-K removal of existing mailboxes 16      each 50.00 800.00 20.00 320.00 16.00 256.00 10.00 160.00
202-02-L removal of fences 1,554.0    ln m 4.00 6,216.00 10.00 15,540.00 10.00 15,540.00 5.00 7,770.00
202-02-N removal of existing sign 113      each 40.00 4,520.00 110.00 12,430.00 110.00 12,430.00 120.00 13,560.00
202-02-O removal of existing sign support 82      each 200.00 16,400.00 275.00 22,550.00 280.00 22,960.00 300.00 24,600.00
203-01 general excavation 86,731      cu m 9.00 780,579.00 8.00 693,848.00 10.00 867,310.00 12.00 1,040,772.00
203-04 embankment 157,844      cu m 22.00 3,472,568.00 14.00 2,209,816.00 18.00 2,841,192.00 22.00 3,472,568.00
204-02 temporary hay or straw bales 75      ea 8.50 637.50 8.00 600.00 10.00 750.00 6.00 450.00
204-05-A temporary sediment check dams (hay) 69      ea 100.00 6,900.00 105.00 7,245.00 110.00 7,590.00 80.00 5,520.00
204-06 temporary silt fencing 7,858      ln m 4.50 35,361.00 4.00 31,432.00 5.00 39,290.00 4.00 31,432.00
302-02-B class ii base course (220 mm thick) 19,616.8    sq m 24.00 470,803.20 27.15 532,596.12 26.00 510,036.80 28.00 549,270.40
302-02-D class ii base course (300 mm thick) 63,535.9    sq m 32.00 2,033,148.80 31.36 1,992,485.82 34.00 2,160,220.60 38.00 2,414,364.20
304-01 lime 628.64   Mg 165.00 103,725.60 110.00 69,150.40 175.00 110,012.00 100.00 62,864.00
304-04-D lime treatment (type d) (300 mm thick) 41,578      sq m 1.70 70,682.60 0.55 22,867.90 1.20 49,893.60 0.50 20,789.00
502-01 superpave asphaltic concrete 8,794.7    Mg 79.00 694,781.30 82.50 725,562.75 80.00 703,576.00 75.00 659,602.50
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
851.7    Mg 111.00 94,538.70 138.00 117,534.60 120.00 102,204.00 125.00 106,462.50
601-01-K portland cement concrete pavement (250 mm thick) 31,366.1    sq m 66.00 2,070,162.60 75.90 2,380,686.99 64.00 2,007,430.40 66.00 2,070,162.60
601-02-K portland cement concrete pavement (250 mm thick)
(crossovers & turnouts)
1,436.9    sq m 66.00 94,835.40 84.70 121,705.43 64.00 91,961.60 66.00 94,835.40
601-03-K portland cement concrete shoulders (250 mm thick) 17,413.8    sq m 66.00 1,149,310.80 69.30 1,206,776.34 64.00 1,114,483.20 66.00 1,149,310.80
701-01-I cross drain pipe (600 mm rcp/pcp) 25.6    ln m 260.00 6,656.00 200.00 5,120.00 210.00 5,376.00 275.00 7,040.00
701-01-K cross drain pipe (750 mm rcp/pcp) 65.0    ln m 310.00 20,150.00 274.48 17,841.20 260.00 16,900.00 480.00 31,200.00
701-01-M cross drain pipe (900 mm rcp/pcp) 38.7    ln m 350.00 13,545.00 337.78 13,072.08 340.00 13,158.00 520.00 20,124.00
701-02-F cross drain pipe arch (900 mm equiv. rcpa) 56.6    ln m 365.00 20,659.00 355.00 20,093.00 380.00 21,508.00 560.00 31,696.00
701-03-G storm drain pipe (450 mm rcp) 214.5    ln m 165.00 35,392.50 150.00 32,175.00 180.00 38,610.00 295.00 63,277.50
701-03-I storm drain pipe (600 mm rcp) 22.3    ln m 190.00 4,237.00 200.00 4,460.00 240.00 5,352.00 395.00 8,808.50
701-05-G side drain pipe (450 mm) 31.7    ln m 170.00 5,389.00 147.00 4,659.90 150.00 4,755.00 280.00 8,876.00
701-05-G-01 side drain pipe (450 mm)(bridge drain) 49.2    ln m 180.00 8,856.00 275.00 13,530.00 300.00 14,760.00 400.00 19,680.00
701-05-I side drain pipe (600 mm) 48.8    ln m 220.00 10,736.00 200.00 9,760.00 180.00 8,784.00 340.00 16,592.00
701-05-K side drain pipe (750 mm) 18.8    ln m 330.00 6,204.00 274.00 5,151.20 230.00 4,324.00 410.00 7,708.00
701-05-M side drain pipe (900 mm) 80.3    ln m 350.00 28,105.00 233.00 18,709.90 270.00 21,681.00 430.00 34,529.00
701-05-O side drain pipe (1200 mm) 22.3    ln m 485.00 10,815.50 286.00 6,377.80 350.00 7,805.00 540.00 12,042.00
701-06-H side drain pipe arch (1200 mm equiv.) 85.0    ln m 490.00 41,650.00 330.00 28,050.00 390.00 33,150.00 600.00 51,000.00
702-03-A-01 catch basins (cb-01)(bridge end drain) 4      ea 3,000.00 12,000.00 4,500.00 18,000.00 4,500.00 18,000.00 4,000.00 16,000.00
702-03-C catch basins (cb-06) 9      ea 4,500.00 40,500.00 3,633.00 32,697.00 5,200.00 46,800.00 6,000.00 54,000.00
704-01-A guard rail (single thrie beam)(950 mm post spacing) 194.78   ln m 100.00 19,478.00 138.00 26,879.64 140.00 27,269.20 110.00 21,425.80
704-01-C guard rail (double thrie beam)(950 mm post spacing) 76.20   ln m 130.00 9,906.00 154.00 11,734.80 160.00 12,192.00 130.00 9,906.00
704-03 blocked out guard rail 503.95   ln m 55.00 27,717.25 66.00 33,260.70 65.00 32,756.75 55.00 27,717.25
704-05 guard rail anchor sections (bct) 11.43   ln m 220.00 2,514.60 253.00 2,891.79 250.00 2,857.50 220.00 2,514.60
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
38.35   ln m 270.00 10,354.50 270.00 10,354.50 260.00 9,971.00 260.00 9,971.00
704-08-B guard rail transitions (double thrie beam) 15.24   ln m 170.00 2,590.80 143.00 2,179.32 140.00 2,133.60 150.00 2,286.00
704-11-A guard rail end treatment (flared) 22      ea 1,900.00 41,800.00 2,585.00 56,870.00 2,500.00 55,000.00 1,650.00 36,300.00
705-06-A chain link fence (1200 mm height) 2,037      ln m 45.00 91,665.00 36.00 73,332.00 48.00 97,776.00 48.00 97,776.00
706-02-C concrete drive (150 mm thick) 392.6    sq m 55.00 21,593.00 59.40 23,320.44 60.00 23,556.00 55.00 21,593.00
706-03-A incidental concrete paving (100 mm thick) 3,523.3    sq m 40.00 140,932.00 37.95 133,709.23 50.00 176,165.00 45.00 158,548.50
707-01-A concrete curb (150mm barrier) 220.1    ln m 45.00 9,904.50 55.00 12,105.50 30.00 6,603.00 20.00 4,402.00
707-01-B concrete curb (100mm mountable) 1,761.1    ln m 40.00 70,444.00 34.00 59,877.40 30.00 52,833.00 25.00 44,027.50
707-03 combination concrete curb & gutter 117.5    ln m 70.00 8,225.00 100.00 11,750.00 100.00 11,750.00 90.00 10,575.00
708-01 right-of-way monument 90      ea 450.00 40,500.00 450.00 40,500.00 250.00 22,500.00 100.00 9,000.00
712-01-C concrete cast-in-place revetment (150mm thick) 1,275      sq m 45.00 57,375.00 86.50 110,287.50 90.00 114,750.00 65.00 82,875.00
713-01 temporary signs & barricades lump      lump 200,000.00 200,000.00 310,000.00 310,000.00 300,000.00 300,000.00 350,000.00 350,000.00
713-05-A temporary pavement markings (solid line)(100 mm width) 14.836  km 570.00 8,456.52 627.00 9,302.17 1,200.00 17,803.20 500.00 7,418.00
713-09 temporary precast concrete barrier (department
furnished)
730      ea 180.00 131,400.00 220.00 160,600.00 225.00 164,250.00 300.00 219,000.00
717-01 seeding 478      kg 16.00 7,648.00 15.00 7,170.00 17.00 8,126.00 14.00 6,692.00
718-01 fertilizer 15,830      kg 0.55 8,706.50 0.87 13,772.10 0.60 9,498.00 0.50 7,915.00
722-01 project site laboratory 1.00   ea 5,000.00 5,000.00 50,000.00 50,000.00 100,000.00 100,000.00 15,000.00 15,000.00
725-02 temporary detour roads 1,317.4    sq m 60.00 79,044.00 65.50 86,289.70 55.00 72,457.00 75.00 98,805.00
726-01 bedding material 228.3    cu m 80.00 18,264.00 50.00 11,415.00 90.00 20,547.00 60.00 13,698.00
727-01 mobilization lump      lump 2,000,000.00 2,000,000.00 1,500,000.00 1,500,000.00 900,000.00 900,000.00 2,100,000.00 2,100,000.00
729-01 sign (type a) 80.28   sq m 180.00 14,450.40 187.00 15,012.36 180.00 14,450.40 200.00 16,056.00
729-02 sign (type b) 1.52   sq m 255.00 387.60 226.00 343.52 220.00 334.40 210.00 319.20
729-04 sign (type d) 407.94   sq m 225.00 91,786.50 198.00 80,772.12 200.00 81,588.00 225.00 91,786.50
729-05 sign (type e) 63.17   sq m 260.00 16,424.20 237.00 14,971.29 230.00 14,529.10 270.00 17,055.90
729-06 sign (overhead mounted) 451.07   sq m 220.00 99,235.40 204.00 92,018.28 200.00 90,214.00 260.00 117,278.20
729-08-A mounting (63.5mm post) 24      each 560.00 13,440.00 715.00 17,160.00 700.00 16,800.00 580.00 13,920.00
729-08-B mounting (88.9mm post) 10      each 670.00 6,700.00 825.00 8,250.00 800.00 8,000.00 700.00 7,000.00
729-08-B-01 mounting (88.9mm post) 2      each 670.00 1,340.00 825.00 1,650.00 800.00 1,600.00 640.00 1,280.00
729-08-F mounting (w150 x 18) 16      each 750.00 12,000.00 1,045.00 16,720.00 1,050.00 16,800.00 850.00 13,600.00
729-08-G mounting (w200 x 27) 6      each 1,100.00 6,600.00 1,375.00 8,250.00 1,400.00 8,400.00 1,000.00 6,000.00
729-08-H mounting (w200 x 36) 40      ea 1,200.00 48,000.00 1,815.00 72,600.00 1,800.00 72,000.00 1,400.00 56,000.00
729-09 mounting (overhead truss)(ground mounted) 1      each 60,000.00 60,000.00 49,500.00 49,500.00 50,000.00 50,000.00 54,000.00 54,000.00
729-10 mounting (overhead truss)(structure mounted) 1      ea 60,000.00 60,000.00 55,000.00 55,000.00 55,000.00 55,000.00 51,000.00 51,000.00
729-11 mounting (overhead cantilever)(ground mounted) 14      each 20,000.00 280,000.00 23,870.00 334,180.00 24,000.00 336,000.00 26,000.00 364,000.00
729-13 mounting (bridge fascia mounted) 2      ea 4,500.00 9,000.00 6,600.00 13,200.00 7,000.00 14,000.00 7,000.00 14,000.00
729-16-C object marker assembly (type 3) 6      ea 100.00 600.00 77.00 462.00 80.00 480.00 70.00 420.00
729-19-A dead end road installation (type a) 1      ea 1,500.00 1,500.00 4,290.00 4,290.00 5,000.00 5,000.00 3,800.00 3,800.00
729-20-A footings for overhead mountings (cantilever) 14      ea 15,000.00 210,000.00 9,500.00 133,000.00 12,000.00 168,000.00 18,300.00 256,200.00
729-20-B footings for overhead mountings (truss) 2      ea 13,000.00 26,000.00 20,000.00 40,000.00 13,000.00 26,000.00 18,300.00 36,600.00
729-21 u-channel post 8      ea 50.00 400.00 100.00 800.00 100.00 800.00 130.00 1,040.00
731-02 reflectorized raised pavement markers 782      ea 6.00 4,692.00 6.00 4,692.00 6.00 4,692.00 5.50 4,301.00
732-02-A plastic pavement striping (solid line)(100 mm width) 14.532  km 1,400.00 20,344.80 1,470.00 21,362.04 1,500.00 21,798.00 1,350.00 19,618.20
732-02-C plastic pavement striping (solid line)(200 mm width) 1.199  km 2,000.00 2,398.00 2,203.00 2,641.39 2,200.00 2,637.80 2,700.00 3,237.30
732-02-E plastic pavement striping (solid line)(600 mm width) 0.246  km 8,100.00 1,992.60 8,824.00 2,170.70 9,000.00 2,214.00 8,000.00 1,968.00
732-03-A plastic pavement striping (broken line)(100 mm width)
(3m w/9m gap)
9.218  km 1,400.00 12,905.20 1,475.00 13,596.55 1,500.00 13,827.00 600.00 5,530.80
732-03-B plastic pavement striping (broken line)(100 mm width)
(600mm w/ 1.2m gap)
0.142  km 8,100.00 1,150.20 8,853.00 1,257.12 9,000.00 1,278.00 1,400.00 198.80
732-04-A plastic pavement legends & symbols (arrow) 16      ea 160.00 2,560.00 171.00 2,736.00 160.00 2,560.00 150.00 2,400.00
732-04-C plastic pavement legends & symbols (only) 8      ea 160.00 1,280.00 182.00 1,456.00 180.00 1,440.00 175.00 1,400.00
732-05 removal of existing markings 3.015  km 3,500.00 10,552.50 3,695.00 11,140.42 4,000.00 12,060.00 2,200.00 6,633.00
735-01 mailboxes 16      ea 6.00 96.00 1.00 16.00 1.00 16.00 1.00 16.00
735-02 mailbox supports (single) 8      ea 125.00 1,000.00 150.00 1,200.00 135.00 1,080.00 140.00 1,120.00
735-04 mailbox supports (multiple) 3      ea 280.00 840.00 350.00 1,050.00 310.00 930.00 320.00 960.00
736-07 traffic signal system lump      lump 150,000.00 150,000.00 145,200.00 145,200.00 140,000.00 140,000.00 150,000.00 150,000.00
740-01 construction layout lump      lump 150,000.00 150,000.00 400,000.00 400,000.00 300,000.00 300,000.00 250,000.00 250,000.00
744-01 traffic control management lump      lump 10,000.00 10,000.00 50,000.00 50,000.00 10,000.00 10,000.00 15,000.00 15,000.00
802-02 structural excavation for intermediate bents 526.2    cu m 200.00 105,240.00 88.00 46,305.60 200.00 105,240.00 80.00 42,096.00
804-01-B precast concrete piles (350 mm) 40.0    ln m 250.00 10,000.00 209.00 8,360.00 340.00 13,600.00 190.00 7,600.00
804-01-D precast concrete piles (450 mm) 972.0    ln m 260.00 252,720.00 212.00 206,064.00 350.00 340,200.00 192.00 186,624.00
804-01-F precast concrete piles (600 mm) 594.0    ln m 450.00 267,300.00 310.00 184,140.00 460.00 273,240.00 282.00 167,508.00
804-05 precast concrete test piles 1      ea 30,000.00 30,000.00 8,085.00 8,085.00 17,000.00 17,000.00 7,350.00 7,350.00
804-09 loading test piles 1      ea 10,000.00 10,000.00 21,450.00 21,450.00 28,000.00 28,000.00 19,500.00 19,500.00
804-10 reloading test piles 1      ea 1,000.00 1,000.00 825.00 825.00 1,600.00 1,600.00 750.00 750.00
804-11 redriving test piles 1      ea 1,000.00 1,000.00 550.00 550.00 700.00 700.00 500.00 500.00
804-12 loading permanent piles 1      ea 1,000.00 1,000.00 16,500.00 16,500.00 700.00 700.00 15,000.00 15,000.00
804-17 dynamic monitoring 3      ea 600.00 1,800.00 1,210.00 3,630.00 1,300.00 3,900.00 1,100.00 3,300.00
805-01-A class a concrete (pipe headwalls) 188.95   cu m 1,000.00 188,950.00 1,176.00 222,205.20 1,000.00 188,950.00 1,200.00 226,740.00
805-01-B class a concrete (box culvert headwalls) 33.04   cu m 1,000.00 33,040.00 1,200.00 39,648.00 1,000.00 33,040.00 1,700.00 56,168.00
805-01-D class a concrete (footings) 218.58   cu m 400.00 87,432.00 715.00 156,284.70 500.00 109,290.00 650.00 142,077.00
805-01-F class a concrete (bents) 346.26   cu m 850.00 294,321.00 1,320.00 457,063.20 1,600.00 554,016.00 1,200.00 415,512.00
805-03 class aa concrete 761.09   cu m 800.00 608,872.00 770.00 586,039.30 1,400.00 1,065,526.00 700.00 532,763.00
805-08-D precast-prestressed concrete girders (type iv) 1,654.00   ln m 510.00 843,540.00 550.00 909,700.00 800.00 1,323,200.00 500.00 827,000.00
805-11 strip seal joints 59.26   ln m 600.00 35,556.00 550.00 32,593.00 400.00 23,704.00 500.00 29,630.00
805-12-E-01 reinforced concrete box culverts (2100 mm x 2100 mm)
(extenion)
19.82   ln m 3,000.00 59,460.00 2,700.00 53,514.00 2,200.00 43,604.00 4,500.00 89,190.00
805-12-Y-01 reinforced concrete box culverts (2 - 1200 mm x 600 mm)
(extenion)
17.90   ln m 2,800.00 50,120.00 1,500.00 26,850.00 1,600.00 28,640.00 4,300.00 76,970.00
806-01 deformed reinforcing steel 168,566      kg 1.60 269,705.60 2.31 389,387.46 2.50 421,415.00 2.10 353,988.60
807-06 structural metalwork lump      lump 10,000.00 10,000.00 11,000.00 11,000.00 22,000.00 22,000.00 10,000.00 10,000.00
810-01 concrete railing ( barrier f-shape ) 232.00   ln m 160.00 37,120.00 176.00 40,832.00 150.00 34,800.00 160.00 37,120.00
813-01 concrete approach slabs 705.48   sq m 180.00 126,986.40 220.00 155,205.60 250.00 176,370.00 200.00 141,096.00
S-001 saw cutting (full depth) 10      ln m 50.00 500.00 44.00 440.00 50.00 500.00 30.00 300.00
S-002 portable impact attenuator 6      each 25,000.00 150,000.00 25,200.00 151,200.00 25,000.00 150,000.00 21,000.00 126,000.00
S-003 remove and remount existing logos 88      each 35.00 3,080.00 55.00 4,840.00 55.00 4,840.00 325.00 28,600.00
S-004 remove and remount existing signs 6      each 400.00 2,400.00 198.00 1,188.00 200.00 1,200.00 450.00 2,700.00
S-101 construction sheeting lump      lump 200,000.00 200,000.00 892,500.00 892,500.00 275,000.00 275,000.00 750,000.00 750,000.00
S-102 dynamic analysis 3      each 3,000.00 9,000.00 1,100.00 3,300.00 2,800.00 8,400.00 1,000.00 3,000.00
                       
 CONTRACTOR TOTAL       20,122,610.07   19,903,069.47   20,496,969.95   22,336,395.75