Bid Tabs Bid Tabulations February 10, 2006

Letting of 1/25/2006 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 011-02-0018
Parish: CADDO
Routes: US 71 9 td>
Description: JUNCTION LA 1 - JUNCTION LA 173
Type Const: grading, cold planing asphaltic pavement, cement treated base course, superpave
asphaltic concrete pavement, and related work.
 
RankLicenseBidderAmount
117464 BENTON & BROWN, LLC. $2,144,499.46
236374 BEST-YET BUILDERS, LLC $2,320,190.47
308584 MADDEN CONTRACTING CO., INC. $2,504,989.95
 
Item Number Item Description Quantity Unit of Measure - 1 -
BENTON & BROWN, LLC.
- 2 -
BEST-YET BUILDERS, LLC
- 3 -
MADDEN CONTRACTING CO., INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 72      SQYD 23.00 1,656.00 9.00 648.00 25.00 1,800.00    
202-02-I removal of concrete pipe headwall 1      EACH 500.00 500.00 1,200.00 1,200.00 1,000.00 1,000.00    
203-08 borrow (vehicular measurement) 1,500      CUYD 13.50 20,250.00 12.00 18,000.00 12.00 18,000.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
100      CUYD 20.00 2,000.00 50.00 5,000.00 20.00 2,000.00    
502-01 superpave asphaltic concrete 24,901.6    TON 60.00 1,494,096.00 60.00 1,494,096.00 64.65 1,609,888.44    
502-01-A superpave asphaltic concrete,drives,turnouts and
miscellaneous
741.0    TON 70.00 51,870.00 65.00 48,165.00 62.35 46,201.35    
509-01 cold planing asphaltic pavement 24,133      SQYD 1.40 33,786.20 1.50 36,199.50 1.40 33,786.20    
509-02 contractor retained reclaimed asphaltic pavement - 670      CUYD 0.10 - 67.00 0.01 - 6.70 1.00 - 670.00    
701-08 relaying pipe 6      LNFT 185.00 1,110.00 135.00 810.00 150.00 900.00    
701-10-I reinforced concrete pipe (extension)(24") 32      LNFT 130.00 4,160.00 121.78 3,896.96 150.00 4,800.00    
701-15 concrete collar 5      EACH 700.00 3,500.00 1,000.00 5,000.00 800.00 4,000.00    
712-04 flexible revetment 44      SQYD 145.00 6,380.00 40.00 1,760.00 80.00 3,520.00    
713-01 temporary signs & barricades lump      LUMP 46,000.00 46,000.00 50,000.00 50,000.00 148,500.00 148,500.00    
713-03-C temporary pavement markings (8" width) 6,230      LNFT 0.30 1,869.00 0.01 62.30 0.25 1,557.50    
713-03-D temporary pavement markings (12" width) 280      LNFT 0.50 140.00 0.01 2.80 0.44 123.20    
713-03-E temporary pavement markings (24" width) 2,982      LNFT 1.50 4,473.00 1.00 2,982.00 1.32 3,936.24    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
14.404  MILE 350.00 5,041.40 1.00 14.40 325.00 4,681.30    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
11.776  MILE 1.00 11.77 1.00 11.77 316.00 3,721.21    
713-05-A temporary pavement markings (solid line)(4" width) 38.296  MILE 1.00 38.29 1.00 38.29 633.00 24,241.36    
713-06-A temporary pavement legends and symbols (arrow) 3      EACH 60.00 180.00 1.00 3.00 54.00 162.00    
713-06-C temporary pavement legends and symbols (only) 3      EACH 60.00 180.00 1.00 3.00 54.00 162.00    
716-01-B mulch (fiber) 18.00   ACRE 750.00 13,500.00 1,000.00 18,000.00 600.00 10,800.00    
722-02 project site laboratory (equipped) 1      EACH 3,500.00 3,500.00 5,000.00 5,000.00 10,000.00 10,000.00    
724-01-A pavement patching (6" minimum thickness) 300      SQYD 36.00 10,800.00 40.00 12,000.00 49.00 14,700.00    
724-01-B pavement patching (12" minimum thickness) 1,000      SQYD 62.50 62,500.00 70.00 70,000.00 64.00 64,000.00    
724-03 pavement joint repair 500.0    TON 200.00 100,000.00 250.00 125,000.00 185.00 92,500.00    
727-01 mobilization lump      LUMP 50,000.00 50,000.00 150,000.00 150,000.00 148,500.00 148,500.00    
731-02 reflectorized raised pavement markers 1,991      EACH 6.00 11,946.00 5.20 10,353.20 5.20 10,353.20    
732-01-C plastic pavement striping (8" width) 3,115      LNFT 1.00 3,115.00 0.90 2,803.50 0.90 2,803.50    
732-01-D plastic pavement striping (12" width) 140      LNFT 1.50 210.00 1.35 189.00 1.35 189.00    
732-01-E plastic pavement striping (24" width) 1,491      LNFT 3.00 4,473.00 2.70 4,025.70 2.70 4,025.70    
732-02-A plastic pavement striping (solid line) (4" width) 19.148  MILE 2,500.00 47,870.00 2,190.00 41,934.12 2,190.00 41,934.12    
732-03-A plastic pavement striping (broken line)(4" width) 5.888  MILE 1,100.00 6,476.80 972.00 5,723.13 972.00 5,723.13    
732-04-A plastic pavement legends & symbols (arrow) 3      EACH 175.00 525.00 145.00 435.00 145.00 435.00    
732-04-C plastic pavement legends & symbols (only) 3      EACH 175.00 525.00 155.00 465.00 155.00 465.00    
732-05 removal of existing markings 0.180  MILE 5,500.00 990.00 4,810.00 865.80 5,000.00 900.00    
735-01 mailboxes 18      EACH 1.00 18.00 8.45 152.10 1.00 18.00    
735-02 mailbox supports (single) 18      EACH 185.00 3,330.00 133.20 2,397.60 120.00 2,160.00    
739-01 hydro-seeding 18.00   ACRE 1,650.00 29,700.00 1,000.00 18,000.00 1,100.00 19,800.00    
740-01 construction layout lump      LUMP 13,500.00 13,500.00 25,000.00 25,000.00 31,000.00 31,000.00    
744-01 traffic control management lump      LUMP 6,500.00 6,500.00 25,000.00 25,000.00 18,500.00 18,500.00    
S-001 cement treated base course (12" thick)(5% by volume) 16,870      SQYD 5.80 97,846.00 8.00 134,960.00 6.75 113,872.50    
                       
 CONTRACTOR TOTAL       2,144,499.46   2,320,190.47   2,504,989.95