NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
| Item | Description | Unit | Quantity |
|
201-01
|
clearing & grubbing
|
LUMP | LUMP |
|
202-01
|
removal of structures & obstructions
|
LUMP | LUMP |
|
202-02-A-01
|
removal of bridge(stat.505+88,25.67' wide x 133'long concrete slab span bridge w/timber piles)
|
EACH | 1 |
|
203-06
|
excavation & embankment
|
LUMP | LUMP |
|
204-02
|
temporary hay or straw bales
|
EACH | 30 |
|
204-03
|
temporary slope drains
|
LNFT | 200 |
|
204-05-A
|
temporary sediment check dams (hay)
|
EACH | 4 |
|
204-06
|
temporary silt fencing
|
LNFT | 400 |
|
401-02
|
aggregate surface course (adjusted vehicular measurement)
|
CUYD | 21 |
|
502-01
|
superpave asphaltic concrete
|
TON | 87.7 |
|
704-03
|
blocked out guard rail
|
LNFT | 12.5 |
|
704-08-B
|
guard rail transitions (double thrie beam)
|
LNFT | 25.0 |
|
704-11-A
|
guard rail end treatment (flared)
|
EACH | 4 |
|
711-01-D
|
riprap (55 lb,18" thick)
|
SQYD | 311 |
|
711-04
|
geotextile fabric
|
SQYD | 311 |
|
713-01
|
temporary signs & barricades
|
LUMP | LUMP |
|
724-02
|
pavement widening
|
SQYD | 48.2 |
|
727-01
|
mobilization
|
LUMP | LUMP |
|
729-16-C
|
object marker assembly (type 3)
|
EACH | 4 |
|
740-01
|
construction layout
|
LUMP | LUMP |
|
804-01-C
|
precast concrete piles (16")
|
LNFT | 2,040 |
|
804-12
|
loading permanent piles
|
EACH | 1 |
|
805-10-A
|
bridge superstructure & substructure (28'-90 degree crossing, precast special bents)
|
SPAN | 7 |
|
S-101
|
concrete approach slabs (without asphalt)(28'- 90 degree crossing)
|
EACH | 2 |