La DOTD  
La DOTD
Project List Notice to Contractors November 24, 2007

Project Item Summary

Items for Project 713-12-0002

go back

Scheduled for Letting 01/25/06
 
Project List
CREOLE CANAL BRIDGE
Click Download Items button to save a comma delimited file of the Items for this Project.

NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.

Item Description Unit Quantity
201-01 clearing & grubbing LUMP LUMP
202-01 removal of structures & obstructions LUMP LUMP
202-02-A-01 removal of bridge(stat.505+88,25.67' wide x 133'long concrete slab span bridge w/timber piles) EACH 1
203-06 excavation & embankment LUMP LUMP
204-02 temporary hay or straw bales EACH 30
204-03 temporary slope drains LNFT 200
204-05-A temporary sediment check dams (hay) EACH 4
204-06 temporary silt fencing LNFT 400
401-02 aggregate surface course (adjusted vehicular measurement) CUYD 21
502-01 superpave asphaltic concrete TON 87.7
704-03 blocked out guard rail LNFT 12.5
704-08-B guard rail transitions (double thrie beam) LNFT 25.0
704-11-A guard rail end treatment (flared) EACH 4
711-01-D riprap (55 lb,18" thick) SQYD 311
711-04 geotextile fabric SQYD 311
713-01 temporary signs & barricades LUMP LUMP
724-02 pavement widening SQYD 48.2
727-01 mobilization LUMP LUMP
729-16-C object marker assembly (type 3) EACH 4
740-01 construction layout LUMP LUMP
804-01-C precast concrete piles (16") LNFT 2,040
804-12 loading permanent piles EACH 1
805-10-A bridge superstructure & substructure (28'-90 degree crossing, precast special bents) SPAN 7
S-101 concrete approach slabs (without asphalt)(28'- 90 degree crossing) EACH 2