Item Description Unit Quantity
201-01 clearing & grubbing LUMP LUMP
202-02-A-01 removal of bridge(sta. 105+22 - 25'x 45'timber bridge) EACH 1
202-02-A-02 removal of bridge(sta.105+16-25'x 32'timber bridge) EACH 1
203-06 excavation & embankment LUMP LUMP
204-02 temporary hay or straw bales EACH 40
204-05-A temporary sediment check dams (hay) EACH 8
204-06 temporary silt fencing LNFT 700
302-01-A class ii base course( stone or asphaltic concrete) CUYD 134.4
401-02 aggregate surface course (adjusted vehicular measurement) CUYD 17
502-01 superpave asphaltic concrete TON 104.3
701-02-P cross drain pipe arch (96" equiv. cmpa) LNFT 180
711-01-C riprap (30 lb,14" thick) SQYD 447
711-04 geotextile fabric SQYD 447
712-02 sacked concrete revetment SQYD 206
713-01 temporary signs & barricades LUMP LUMP
726-01 bedding material CUYD 380.5
727-01 mobilization LUMP LUMP
729-16-B object marker assembly (type 2) EACH 8
740-01 construction layout LUMP LUMP
805-01-B class a concrete (box culvert headwalls) CUYD 50.85
805-12-S-01 reinforced concrete box culverts (8'x 8')(precast only, astm c1433) LNFT 188.0
806-01 deformed reinforcing steel LB 4,884