NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
| Item | Description | Unit | Quantity |
|
201-01
|
clearing & grubbing
|
LUMP | LUMP |
|
202-02-A-01
|
removal of bridge(sta. 105+22 - 25'x 45'timber bridge)
|
EACH | 1 |
|
202-02-A-02
|
removal of bridge(sta.105+16-25'x 32'timber bridge)
|
EACH | 1 |
|
203-06
|
excavation & embankment
|
LUMP | LUMP |
|
204-02
|
temporary hay or straw bales
|
EACH | 40 |
|
204-05-A
|
temporary sediment check dams (hay)
|
EACH | 8 |
|
204-06
|
temporary silt fencing
|
LNFT | 700 |
|
302-01-A
|
class ii base course( stone or asphaltic concrete)
|
CUYD | 134.4 |
|
401-02
|
aggregate surface course (adjusted vehicular measurement)
|
CUYD | 17 |
|
502-01
|
superpave asphaltic concrete
|
TON | 104.3 |
|
701-02-P
|
cross drain pipe arch (96" equiv. cmpa)
|
LNFT | 180 |
|
711-01-C
|
riprap (30 lb,14" thick)
|
SQYD | 447 |
|
711-04
|
geotextile fabric
|
SQYD | 447 |
|
712-02
|
sacked concrete revetment
|
SQYD | 206 |
|
713-01
|
temporary signs & barricades
|
LUMP | LUMP |
|
726-01
|
bedding material
|
CUYD | 380.5 |
|
727-01
|
mobilization
|
LUMP | LUMP |
|
729-16-B
|
object marker assembly (type 2)
|
EACH | 8 |
|
740-01
|
construction layout
|
LUMP | LUMP |
|
805-01-B
|
class a concrete (box culvert headwalls)
|
CUYD | 50.85 |
|
805-12-S-01
|
reinforced concrete box culverts (8'x 8')(precast only, astm c1433)
|
LNFT | 188.0 |
|
806-01
|
deformed reinforcing steel
|
LB | 4,884 |