Project Item Summary

Items for Project 432-02-0005

go back

Scheduled for Letting 01/25/06
 
Project List
JCT. LA 191 - JCT. US 84
Click Download Items button to save a comma delimited file of the Items for this Project.

NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.

Item Description Unit Quantity
202-02-D removal of concrete walks & drives SQYD 6
203-08 borrow (vehicular measurement) CUYD 2,000
401-02 aggregate surface course (adjusted vehicular measurement) CUYD 300
502-01 superpave asphaltic concrete TON 5,429.5
502-01-A superpave asphaltic concrete, drives, turnouts and miscellaneous TON 2,135.0
701-01-I cross drain pipe (24" rcp/pcp) LNFT 56
701-01-M cross drain pipe (36" rcp/pcp) LNFT 85
701-13-E corrugated metal pipe arch (extension) (30") LNFT 12
712-04 flexible revetment SQYD 200
713-01 temporary signs and barricades LUMP LUMP
713-04-A temporary pavement markings (broken line) (4" width)(4' length) MILE 2.237
713-04-B temporary pavement markings (broken line) (4" width)(10' length) MILE 1.806
713-05-A temporary pavement markings (solid line)(4" width) MILE 7.417
716-01-A mulch (vegetative) ACRE 5.70
724-01-A pavement patching (6" minimum thickness) SQYD 200
727-01 mobilization LUMP LUMP
731-02 reflectorized raised pavement markers EACH 309
732-01-E plastic pavement striping (24" width) LNFT 30
732-02-A plastic pavement striping (solid line) (4" width) MILE 7.417
732-03-A plastic pavement striping (broken line)(4" width) MILE 1.806
735-01 mailboxes EACH 49
735-02 mailbox supports (single) EACH 33
735-03 mailbox supports (double) EACH 8
739-01 hydro-seeding ACRE 5.70
740-01 construction layout LUMP LUMP
744-01 traffic control management LUMP LUMP