NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
| Item | Description | Unit | Quantity |
|
202-02-H
|
removal of guard rail
|
LNFT | 91 |
|
203-08
|
borrow (vehicular measurement)
|
CUYD | 300 |
|
204-06
|
temporary silt fencing
|
LNFT | 300 |
|
401-02
|
aggregate surface course (adjusted vehicular measurement)
|
CUYD | 5,131 |
|
502-01
|
superpave asphaltic concrete
|
TON | 23,354.6 |
|
502-01-A
|
superpave asphaltic concrete, drives, turnouts and miscellaneous
|
TON | 2,036.0 |
|
509-01
|
cold planing asphaltic pavement (2" average depth)
|
SQYD | 121,323 |
|
509-02
|
contractor retained reclaimed asphaltic pavement
|
CUYD | - 3,033 |
|
701-02-D
|
cross drain pipe arch (24" equiv. rcpa)
|
LNFT | 952 |
|
704-01-C
|
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
LNFT | 105.0 |
|
704-03
|
blocked out guard rail
|
LNFT | 89.0 |
|
704-11-B
|
guard rail end treatment (tangent)
|
EACH | 2 |
|
706-01-A
|
concrete walk (4" thick)
|
SQYD | 50.0 |
|
713-01
|
temporary signs & barricades
|
LUMP | LUMP |
|
713-04-A
|
temporary pavement markings (broken line)(4" width)(4' length)
|
MILE | 28.200 |
|
713-04-B
|
temporary pavement markings (broken line)(4" width)(10' length)
|
MILE | 20.589 |
|
713-05-A
|
temporary pavement markings (solid line)(4" width)
|
MILE | 111.565 |
|
724-01-B
|
pavement patching (12" minimum thickness)
|
SQYD | 212 |
|
726-01
|
bedding material
|
CUYD | 352.6 |
|
727-01
|
mobilization
|
LUMP | LUMP |
|
729-16-B
|
object marker assembly (type 2)
|
EACH | 60 |
|
729-16-C
|
object marker assembly (type 3)
|
EACH | 2 |
|
731-02
|
reflectorized raised pavement markers
|
EACH | 1,242 |
|
732-02-A
|
plastic pavement striping (solid line) (4" width)
|
MILE | 24.655 |
|
732-03-A
|
plastic pavement striping (broken line)(4" width)
|
MILE | 6.863 |
|
735-01
|
mailboxes
|
EACH | 87 |
|
735-02
|
mailbox supports (single)
|
EACH | 81 |
|
735-03
|
mailbox supports (double)
|
EACH | 3 |
|
739-01
|
hydro-seeding
|
ACRE | 11.39 |
|
740-01
|
construction layout
|
LUMP | LUMP |
|
744-01
|
traffic control management
|
LUMP | LUMP |
|
S-001
|
cleaning existing ditches
|
LNFT | 2,200 |