NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
| Item | Description | Unit | Quantity |
|
201-01
|
clearing & grubbing
|
LUMP | LUMP |
|
202-02-A-01
|
removal of bridge - str no. 58301270209561 - 169' x 24' concrete deck girder bridge (sta. 115+92.65)
|
EACH | 1 |
|
202-02-A-02
|
removal of bridge - str no. 58301270209681 - 96' x 24' concrete deck girder bridge (sta. 122+17.12)
|
EACH | 1 |
|
202-02-G
|
removal of surfacing & stabilized base
|
SQYD | 617.2 |
|
203-01
|
general excavation
|
CUYD | 371 |
|
203-02
|
drainage excavation
|
CUYD | 4,621 |
|
203-04
|
embankment
|
CUYD | 5,177 |
|
204-06
|
temporary silt fencing
|
LNFT | 3,284 |
|
401-02
|
aggregate surface course (adjusted vehicular measurement)
|
CUYD | 33 |
|
402-01
|
traffic maintenance aggregate (vehicular measurement)
|
CUYD | 300.0 |
|
502-01
|
superpave asphaltic concrete
|
TON | 2,476.5 |
|
509-01
|
cold planing asphaltic pavement
|
SQYD | 2,547 |
|
509-02
|
contractor retained reclaimed asphaltic pavement
|
CUYD | - 71 |
|
704-01-A
|
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
LNFT | 158.2 |
|
704-03
|
blocked out guard rail
|
LNFT | 650.0 |
|
704-08-B
|
guard rail transitions (double thrie beam)
|
LNFT | 200.0 |
|
704-11-A
|
guard rail end treatment (flared)
|
EACH | 12 |
|
705-01
|
barbed wire fence
|
LNFT | 105 |
|
705-02
|
combination mesh & barbed wire fence
|
LNFT | 361 |
|
708-01
|
right-of-way monument
|
EACH | 16 |
|
708-02
|
right-of-way monument witness post
|
EACH | 16 |
|
712-04
|
flexible revetment
|
SQYD | 597 |
|
713-01
|
temporary signs & barricades
|
LUMP | LUMP |
|
716-01-A
|
mulch (vegetative)
|
ACRE | 2.12 |
|
725-01
|
temporary detour roads
|
LNFT | 1,218.4 |
|
725-03
|
temporary detour bridging
|
LNFT | 200.00 |
|
727-01
|
mobilization
|
LUMP | LUMP |
|
729-16-C
|
object marker assembly (type 3)
|
EACH | 8 |
|
731-02
|
reflectorized raised pavement markers
|
EACH | 44 |
|
732-02-A
|
plastic pavement striping (solid line) (4" width)
|
MILE | .714 |
|
732-03-A
|
plastic pavement striping (broken line)(4" width)
|
MILE | .356 |
|
732-05
|
removal of existing markings
|
MILE | .117 |
|
739-01
|
hydro-seeding
|
ACRE | 2.12 |
|
740-01
|
construction layout
|
LUMP | LUMP |
|
744-01
|
traffic control management
|
LUMP | LUMP |
|
804-01-C
|
precast concrete piles (16")
|
LNFT | 1,820 |
|
804-01-F
|
precast concrete piles (24")
|
LNFT | 2,664 |
|
804-12
|
loading permanent piles
|
EACH | 2 |
|
805-01-F
|
class a concrete (bents)
|
CUYD | 199.80 |
|
805-03
|
class aa concrete
|
CUYD | 609.62 |
|
806-01
|
deformed reinforcing steel
|
LB | 138,668 |
|
810-01
|
concrete railing (barrier)
|
LNFT | 680.00 |
|
813-01
|
concrete approach slabs
|
SQYD | 728.88 |