NOTE: Items and quantities shown are provided for informational purposes only and are subject to revision.
| Item | Description | Unit | Quantity |
|
201-01
|
clearing & grubbing
|
LUMP | LUMP |
|
202-01
|
removal of structures & obstructions
|
LUMP | LUMP |
|
202-02-01
|
removal of brick veneer house on slab (35' x 80' station 134+00 left of centerline)
|
EACH | 1 |
|
202-02-02
|
removal of wood frame house on piers (30' x 55' station 138+70 right of centerline)
|
EACH | 1 |
|
202-02-03
|
removal of wood frame shed (10' x 12' station 139+60 right of centerline)
|
EACH | 1 |
|
202-02-04
|
removal of wood frame house on slab (25' x 40' station 177+60 right of centerline)
|
EACH | 1 |
|
202-02-05
|
removal of wood frame house on piers (50' x 70' station 180+00 on centerline)
|
EACH | 1 |
|
202-02-06
|
removal of metal garage (25' x 25' station 180+50 left of centerline)
|
EACH | 1 |
|
202-02-07
|
removal of wood frame storage building on piers (10' x 30' right of centerline)
|
EACH | 1 |
|
202-02-08
|
removal of existing sewer tank (station 133+32 right of centerline)
|
EACH | 1 |
|
202-02-09
|
removal of existing sewer tank (station 133+71 left of centerline)
|
EACH | 1 |
|
202-02-10
|
removal of existing sewer tank (station 139+48 right of centerline)
|
EACH | 1 |
|
203-01
|
general excavation
|
CUYD | 633,303 |
|
203-02
|
drainage excavation
|
CUYD | 3,891 |
|
203-03
|
muck excavation
|
CUYD | 4,500 |
|
203-04
|
embankment
|
CUYD | 483,161 |
|
204-02
|
temporary hay or straw bales
|
EACH | 1,000 |
|
204-05-A
|
temporary sediment check dams (hay)
|
EACH | 750 |
|
204-05-B
|
temporary sediment check dams (stone)
|
EACH | 16 |
|
204-06
|
temporary silt fencing
|
LNFT | 37,682 |
|
204-07
|
temporary stone construction entrance
|
EACH | 2 |
|
701-01-I
|
cross drain pipe (24" rcp/pcp)
|
LNFT | 1,106 |
|
701-01-K
|
cross drain pipe (30" rcp/pcp)
|
LNFT | 188 |
|
701-01-M
|
cross drain pipe (36" rcp/pcp)
|
LNFT | 212 |
|
701-01-N
|
cross drain pipe (42" rcp/pcp)
|
LNFT | 118 |
|
701-01-O
|
cross drain pipe (48" rcp/pcp)
|
LNFT | 812 |
|
701-01-Q
|
cross drain pipe (60" rcp/pcp)
|
LNFT | 1,660 |
|
701-03-F
|
storm drain pipe (15" rcp/pcp)
|
LNFT | 354 |
|
702-03-B
|
catch basins (cb-02)
|
EACH | 5 |
|
702-03-C
|
catch basins (cb-06)
|
EACH | 4 |
|
705-02
|
combination mesh & barbed wire fence
|
LNFT | 30,133 |
|
708-01
|
right-of-way monument
|
EACH | 61 |
|
708-02
|
right-of-way monument witness post
|
EACH | 61 |
|
711-01-B
|
riprap (10 lb, 10" thick)
|
SQYD | 1,380 |
|
711-04
|
geotextile fabric
|
SQYD | 1,830 |
|
716-01-A
|
mulch (vegetative)
|
ACRE | 138.00 |
|
717-01
|
seeding
|
LB | 4,262 |
|
718-01
|
fertilizer
|
LB | 170,487 |
|
720-01-A
|
erosion control system, slope protection (type a)
|
SQYD | 61,394 |
|
720-01-C
|
erosion control system, flexible channel liner (type c)
|
SQYD | 5,529 |
|
720-01-D
|
erosion control system, flexible channel liner (type d)
|
SQYD | 22,637 |
|
720-01-E
|
erosion control system, flexible channel liner (type e)
|
SQYD | 5,612 |
|
720-01-F
|
erosion control system, flexible channel liner (type f)
|
SQYD | 3,071 |
|
722-02
|
project site laboratory (equipped)
|
EACH | 1 |
|
726-01
|
bedding material
|
CUYD | 1,012.3 |
|
727-01
|
mobilization
|
LUMP | LUMP |
|
729-16-B
|
object marker assembly (type 2)
|
EACH | 54 |
|
729-19-A
|
dead end road installations(type a)
|
EACH | 2 |
|
740-01
|
construction layout
|
LUMP | LUMP |
|
744-01
|
traffic control management
|
LUMP | LUMP |
|
S-001
|
plugging/sealing encountered oil wells
|
LNFT | 2,000 |
|
S-002
|
plugging existing water wells
|
EACH | 3 |