SECTION 509 COLD PLANING ASPHALTIC PAVEMENT
MATERIAL |
REFERENCE |
PURPOSE |
SAMPLED BY |
MINIMUM FREQUENCY |
MIN. QUANTITY |
CERT. |
REMARKS |
|
TESTED BY |
METHOD |
CONTAINER |
DISTR. |
|||||
| COLD PLANED SURFACE | Longitudinal Surface Tolerance* | 509.03(b) 501.10 Contractor |
Quality Control | Contractor TR 641 S 605 |
Each day's production | Entire length One path/lane |
---- |
*Contractor must furnish an approved 7.5-m profilograph. Must meet the requirements of binder course in Section 501 of this manual. |
| Transverse Surface Tolerance, Cross Slope and Grade* | SEE SECTION 501 OF THIS MANUAL FOR TESTING REQUIREMENTS. |
*Must meet the requirements of binder course in Section 501 of this manual. | ||||||
| TEMPORARY PAVEMENT MARKING | SEE SECTION 713 OF THIS MANUAL. |
|||||||