| |
Materials Sampling Manual - English |
| Introduction |
TABLE OF CONTENTS August 2002 |
| |
| |
PART I - CONSTRUCTION
SAMPLING
SCHEDULES |
|
|
203 |
Excavation & Embankment |
204 |
Temporary Erosion Control |
|
|
|
|
| 301 |
Class I Base Course |
302 |
Class II Base Course |
| 303 |
In-Place Cement Stabilized Base Course |
304 |
Lime Treatment |
| 305 |
Subgrade Layer |
306 |
Scarifying & Compacting Roadbed |
|
|
|
|
| 401 |
Aggregate Surface Course |
501 |
Asphaltic Concrete Mixtures |
|
|
|
|
| 502 |
Superpave Asphaltic Concrete Mixtures |
504 |
Asphaltic Tack Coat |
| 505 |
Asphaltic Prime Coat |
506 |
Asphaltic Curing Membrane |
| 507 |
Asphaltic Surface Treatment |
508 |
Asphaltic Treated Drainage Blanket |
| 509 |
Cold Planing Asphaltic Pavement |
|
|
|
|
|
|
| 601 |
Portland Cement Concrete Pavement |
602 |
Portland Cement Concrete Pavement
Rehabilitation |
|
|
|
|
| 701 |
Culverts & Storm Drains |
702 |
Manholes, Junction Boxes and Catch Basins |
| 703 |
Underdrain Systems |
704 |
Guard Rails |
705 |
Fences |
706 |
Concrete Walks, Drives and Incidental Paving |
707 |
Curbs and Gutters |
708 |
Right-of-Way Markers |
709 |
Steel Rails Cattle Guards |
710 |
Flowable Fill |
711 |
RipRap |
712 |
Revetments |
713 |
Temporary Signs, Barricades & Pavement
Markings |
714 |
Slab Sodding |
715 |
Topsoil |
716 |
Vegetative Mulch |
717 |
Seeding |
718 |
Fertilizer and Agricultural Lime |
719 |
Landscaping |
720 |
Erosion Control |
721 |
Asphalt Mulch |
723 |
Granular Material |
724 |
Pavement Patching, Widening and Joint Repair |
725 |
Temporary Detour Roads and Bridges |
726 |
Bedding Material |
728 |
Jacked or Bored Pipe |
729 |
Traffic Signs and Devices |
730 |
Electrical Systems |
731 |
Raised Pavement Markers |
732 |
Plastic Pavement Markers |
733 |
Concrete Roadway Barriers |
734 |
Breaking and Seating Pavement |
735 |
Undersealing Pavement |
736 |
Traffic Signals |
737 |
Painted Traffic Striping |
738 |
Mulch Sodding |
739 |
Hydro-Seeding |
|
|
|
|
|
|
802 |
Structural Excavation and Backfill |
803 |
Sheet Piles |
804 |
Bearing Piles |
805 |
Structural Concrete |
806 |
Reinforcement |
807 |
Structural Metals |
808 |
Steel Grid Flooring |
809 |
Movable Bridges |
810 |
Bridge Railings and Barriers |
811 |
Painted and Protective Coatings |
812 |
Untreated and Treated Lumber |
813 |
Concrete Approach Slabs |
814 |
Drilled Shaft Foundations |
815 |
Welding |
|
|
|
|
901 |
Portland Cement Concrete |
|
|
|
|
|
|
| |
PART II - MAINTENANCE SAMPLING
SCHEDULES |
|
|
|
|
|
|
| |
PART III - SAMPLING PROCEDURES |
|
|
S
101 |
Aggregates and Aggregate Mixture |
S
102 |
Mineral Filler, Portland Cement, Fly Ash, and
Hydrated Lime |
S
201 |
Asphaltic Materials |
S
203 |
Asphaltic Mixtures |
S
301 |
Sampling Fresh Concrete |
S
303 |
Water |
S
401 |
Sampling Soil |
S
501 |
Metals |
S
601 |
Miscellaneous Materials |
S
602 |
Automotive Fluids, Lubricants and
Solvents |
S
604 |
Paints and Thinners |
S
605 |
Using Random Number Tables |
S
606 |
Adhesive for Raised Pavement Markings |
S
607 |
Raised Pavement Markers |
S
608 |
Traffic Paint and Glass Beads |
S
609 |
Preformed Plastic Pavement Markings (Cold
Applied Tape) |
S
610 |
Thermoplastic Compound (Hot Applied Pavement
Markings) |
S
611 |
Joint Sealant |
S
612 |
Asphalt Anti-Strip Additives and Concrete
Admixtures |
S
613 |
Erosion Control Systems |
S
614 |
Geotextile Fabric |
S
701 |
Independent Assurance Sampling and Testing
Program |
S
801 |
Source Approval, Sampling and Testing Program
for Recycled Portland Cement Concrete |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|