Projects Under Construction
District 02
Updated 20 Aug 2008Districtwide Projects
Jefferson Parish
Note: The estimated completion date is based on the work order date and the contract days allowed.
| Huey P Long Bridge Widening (Wb, Eb Appr. & Br. Deck Widen.) | |
| 005-10-0037 - Bridges reconditioned | |
| Proj. Engr: Todd, Timothy | Route: US 90 |
| Contractor: Kiewit La/Massman/Traylor a Jt Ve | Miles: 4.91 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-05-05 | $433,950,000 | 2013-09-03 |
| Huey P. Long Widening (Main Bridge - Substructure) | |
| 006-01-0012 - Bridges reconditioned | |
| Proj. Engr: Todd, Timothy | Route: US 90 |
| Contractor: Massman Construction Co. | Miles: 0.45 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2006-04-10 | $91,817,727 | 2011-11-14 |
| Huey P. Long Bridge Widening (Main Span Superstructure) | |
| 006-01-0018 - Bridges reconditioned | |
| Proj. Engr: Todd, Timothy | Route: US 90 |
| Contractor: Massman/Traylor Bro/Ihi Inc Jt Ve | Miles: 0.45 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2007-11-05 | $452,837,386 | 2012-03-19 |
| Huey P. Long Bridge Widening (Railroad Modifications) | |
| 006-01-0022 - Bridges reconditioned | |
| Proj. Engr: Todd, Timothy | Route: US 90 |
| Contractor: Boh Bros. Construction Co., LLC. | Miles: 0.07 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2006-08-28 | $13,691,040 | 2008-05-08 |
| Jefferson Highway and Harahan Signal Improvements | |
| 006-02-0073 - Signalization | |
| Proj. Engr: Skoien, Richard | Route: US 90 LA 3154 |
| Contractor: Jack B. Harper Contractor, Inc. | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2007-01-08 | $1,974,725 | 2007-11-05 |
| LA 23 (Belle Chasse Hwy) & La 428 (Behrman Hwy) Signal Imp | |
| 062-01-0025 - Signalization | |
| Proj. Engr: Capote, Nelson | Route: LA 23 LA 428 |
| Contractor: Diamond Electrical Co., Inc. | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-02-25 | $2,619,159 | 2008-12-04 |
| Barataria Blvd. (La 541 - Ames Blvd.) | |
| 063-02-0053 - Asphalt overlay of asphalt pavement | |
| Proj. Engr: Capote, Nelson | Route: LA 18 LA 45 LA 560-2 |
| Contractor: Hard Rock Construction Co. | Miles: 3.12 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-08-11 | $1,781,589 | 2009-08-10 |
| LA Highway 45 (Barataria Boulevard) and Patriot Street | |
| 249-01-0045 - Traffic flow improvements - formerly turn lanes | |
| Proj. Engr: Capote, Nelson | Route: LA 45 |
| Contractor: Hard Rock Construction Co. | Miles: 0.89 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2006-09-23 | $7,080,849 | 2007-07-03 |
| Repair Damage to Walking Path Lights From Hurricane Katrina | |
| 283-08-0164 - Sidewalks/bike paths | |
| Proj. Engr: Skoien, Richard W. | Route: |
| Contractor: Toomer Electrical Co., Inc. | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2007-03-05 | $77,230 | 2007-09-10 |
| Causeway Boulevard Hookramp Bridge Rehabilitation | |
| 423-01-0025 - Bridges reconditioned | |
| Proj. Engr: Skoien, Richard | Route: LA 3046 US 90 |
| Contractor: Boh Bros. Construction Co., LLC. | Miles: 0.25 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2007-10-22 | $4,538,031 | 2008-10-02 |
| Causeway Boulevard - 17th Street Canal | |
| 450-15-0089 - Asphalt widening and overlay | |
| Proj. Engr: Standige, Frank H. | Route: I-10 |
| Contractor: Boh Bros. Construction Co., LLC. | Miles: 1.92 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2005-08-01 | $73,583,633 | 2008-05-08 |
| Clearview / Earhart Drainage Improvements (Phase 2) | |
| 826-03-0012 - Drainage | |
| Proj. Engr: Duplantis, Michael | Route: LA 3152 LA 3139 |
| Contractor: Phylway Construction LLC | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-01-15 | $4,945,838 | 2008-12-14 |
| Metairie Rd (La 611-9)/Veterans Hwy (La 3019) Signal Imp | |
| 826-04-0014 - Signalization | |
| Proj. Engr: Standige, Frank H. | Route: LA 611-9 LA 3019 |
| Contractor: Jack B. Harper Contractor, Inc. | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2005-09-12 | $1,045,838 | 2006-04-23 |
Lafourche Parish
Note: The estimated completion date is based on the work order date and the contract days allowed.
| Fourchon to Leeville Bridge (Phase 1a) | |
| 064-30-0035 - Asphalt widening and overlay | |
| Proj. Engr: Gisclair, Gary | Route: LA 3090 LA 1 |
| Contractor: James Construction Group LLC | Miles: 5.34 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2007-03-19 | $137,648,163 | 2011-10-03 |
| LA 1 Toll Cust Serv Ctr,Sign,ITS,Light,Toll Sys (Phase 1d) | |
| 602-88-0001 - Buildings and grounds excluding rest areas | |
| Proj. Engr: Gremillion, Doug | Route: LA 1 LA 308 LA 3235 LA 3090 |
| Contractor: Ernest P. Breaux Electrical, Inc. | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-06-24 | $7,707,152 | 2009-05-16 |
| LA 3235 Cross Drains (Cm) | |
| 829-26-0013 - Drainage | |
| Proj. Engr: Weber, Alan | Route: |
| Contractor: Barriere Construction Co., LLC | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2006-07-05 | $71,702 | 2006-09-24 |
| LA 1 Relocated - Port Fourchon to Leeville - Phase 1b | |
| 829-32-0007 - New location/replacement of moveable bridge | |
| Proj. Engr: Gisclair, Gary | Route: LA 1 |
| Contractor: Traylor Bro/Massman Const a Jt Ve | Miles: 4.01 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2006-03-01 | $140,951,730 | 2014-05-27 |
| LA 1 Over Bayou Lafourche at Leeville, Phase 1c - Main Spans | |
| 829-32-0008 - New location/replacement of bridge | |
| Proj. Engr: Gisclair, Gary | Route: LA 1 |
| Contractor: Traylor Bro/Massman Const a Jt Ve | Miles: 0.17 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2006-06-01 | $21,043,436 | 2009-03-17 |
Orleans Parish
Note: The estimated completion date is based on the work order date and the contract days allowed.
| Jefferson Highway and Harahan Signal Improvements | |
| 006-02-0073 - Signalization | |
| Proj. Engr: Skoien, Richard | Route: US 90 LA 3154 |
| Contractor: Jack B. Harper Contractor, Inc. | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2007-01-08 | $1,974,725 | 2007-11-05 |
| Jefferson Parish Line to S. Carrollton | |
| 006-03-0052 - Asphalt overlay of asphalt pavement | |
| Proj. Engr: Weber, Alan | Route: US 90 |
| Contractor: Barriere Construction Co., LLC | Miles: 0.83 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-02-01 | $1,213,852 | 2008-10-22 |
| Rigolets Pass Bridge and Approaches | |
| 006-05-0076 - New location/replacement of bridge | |
| Proj. Engr: Zzz Marsalone, Lynn | Route: US 90 LA 433 |
| Contractor: Massman Construction Co. | Miles: 3.71 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2004-10-04 | $54,995,374 | 2008-09-15 |
| LA 23 (Belle Chasse Hwy) & La 428 (Behrman Hwy) Signal Imp | |
| 062-01-0025 - Signalization | |
| Proj. Engr: Capote, Nelson | Route: LA 23 LA 428 |
| Contractor: Diamond Electrical Co., Inc. | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-02-25 | $2,619,159 | 2008-12-04 |
| Crescent City Connection Structural and Drainage Repairs | |
| 283-08-0124 - Miscellaneous | |
| Proj. Engr: Skoien, Richard W. | Route: US 90 |
| Contractor: C.E.C., Inc. | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2004-08-16 | $2,105,042 | 2006-05-10 |
| Repair Damage to Walking Path Lights From Hurricane Katrina | |
| 283-08-0164 - Sidewalks/bike paths | |
| Proj. Engr: Skoien, Richard W. | Route: |
| Contractor: Toomer Electrical Co., Inc. | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2007-03-05 | $77,230 | 2007-09-10 |
| Interstate 10 Twin Spans Over Lake Pontchartrain | |
| 450-17-0024 - Bridges reconditioned | |
| Proj. Engr: Zzzz Horn, John | Route: I-10 |
| Contractor: Boh Bros. Construction Co., LLC. | Miles: 5.41 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2006-01-02 | $12,202,118 | 2008-02-07 |
| I-10 Bridge Over Lake Pontchartrain | |
| 450-17-0025 - New location/replacement of bridge | |
| Proj. Engr: Zzzz Horn, John | Route: I-10 |
| Contractor: Boh Bros. Construction Co., LLC. | Miles: 5.26 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2006-06-01 | $426,127,364 | 2012-06-18 |
| Icww Bridge - I-10 | |
| 450-43-0078 - Asphalt overlay of asphalt pavement | |
| Proj. Engr: Guidry, John | Route: I-510 |
| Contractor: Barriere Construction Co., LLC | Miles: 3.32 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-02-01 | $3,264,698 | 2008-09-02 |
| I-10 / S. Claiborne Ave | |
| 450-90-0107 - Miscellaneous | |
| Proj. Engr: Zzzz Langenstein, Larr | Route: I-10 |
| Contractor: Command Construction LLC | Miles: 0.22 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2006-05-12 | $4,647 | 2007-03-10 |
| I-10 Improvements (Dwyer Road-Morrison) | |
| 450-90-0213 - Drainage | |
| Proj. Engr: Guidry, John | Route: I-10 |
| Contractor: Three C's Properties Inc | Miles: 0.59 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-03-13 | $1,692,969 | 2008-12-02 |
| Administration Building Expansion | |
| 610-01-0022 - Buildings and grounds excluding rest areas | |
| Proj. Engr: Skoien, Richard W. | Route: |
| Contractor: Jaroy Construction, Inc. | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-02-11 | $3,799,661 | 2009-09-10 |
| Permanent Repair to Federal Aid Eligible Roads | |
| 704-36-0031 - Miscellaneous | |
| Proj. Engr: Koutnik, William | Route: |
| Contractor: Boh Bros. Construction Co., LLC. | Miles: 3.40 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-04-04 | $4,097,627 | 2008-12-13 |
| Michoud Boulevard Bridge(North and South Bound) | |
| 713-36-0103 - New location/replacement of bridge | |
| Proj. Engr: Zzz Marsalone, Lynn | Route: |
| Contractor: Boh Bros. Construction Co., LLC. | Miles: 0.24 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2007-08-01 | $3,836,346 | 2008-11-28 |
| Metairie Rd (La 611-9)/Veterans Hwy (La 3019) Signal Imp | |
| 826-04-0014 - Signalization | |
| Proj. Engr: Standige, Frank H. | Route: LA 611-9 LA 3019 |
| Contractor: Jack B. Harper Contractor, Inc. | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2005-09-12 | $1,045,838 | 2006-04-23 |
| Algiers Cut Off Canal Bridge Lighting Installation | |
| 836-08-0072 - Roadway lighting | |
| Proj. Engr: Capote, Nelson | Route: LA 407 |
| Contractor: Jack B. Harper Contractor, Inc. | Miles: 1.19 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-02-01 | $888,750 | 2008-08-20 |
Plaquemines Parish
Note: The estimated completion date is based on the work order date and the contract days allowed.
| LA 23 (Belle Chasse Hwy) & La 428 (Behrman Hwy) Signal Imp | |
| 062-01-0025 - Signalization | |
| Proj. Engr: Capote, Nelson | Route: LA 23 LA 428 |
| Contractor: Diamond Electrical Co., Inc. | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-02-25 | $2,619,159 | 2008-12-04 |
| LA 23 Median Enhancement, Phase I | |
| 062-02-0109 - Landscaping | |
| Proj. Engr: Capote, Nelson | Route: LA 23 |
| Contractor: Rotolo Consultants Inc. | Miles: 1.79 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2007-05-10 | $519,793 | 2007-09-09 |
| LA 23 (West Point-a-La-Hache to C.S.L.M. 4.77) | |
| 062-04-0031 - Asphalt overlay of asphalt pavement | |
| Proj. Engr: Capote, Nelson | Route: LA 23 |
| Contractor: Barriere Construction Co., LLC | Miles: 4.77 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-03-01 | $4,084,043 | 2008-10-21 |
| LA 23 Permanent Repairs of Washout Near Sunrise | |
| 704-38-0007 - Embankment repair | |
| Proj. Engr: Capote, Nelson | Route: LA 23 |
| Contractor: Barriere Construction Co., LLC. | Miles: 0.31 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-04-21 | $914,990 | 2008-08-21 |
| Emergency Dredging of Ostrica Canal | |
| 704-38-0011 - Miscellaneous | |
| Proj. Engr: Capote, Nelson | Route: |
| Contractor: Grillot Construction LLC | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-02-11 | $1,058,050 | 2008-07-28 |
| Doullut Canal Bridge | |
| 713-38-0001 - New location/replacement of bridge | |
| Proj. Engr: Capote, Nelson | Route: |
| Contractor: Coastal Bridge Co., L.L.C. | Miles: 0.20 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-03-03 | $10,932,563 | 2010-03-31 |
St. Bernard Parish
Note: The estimated completion date is based on the work order date and the contract days allowed.
| St. Bernard Highway Drainage Improvements Phase II | |
| 046-03-0070 - Miscellaneous | |
| Proj. Engr: Guidry, John | Route: LA 46 |
| Contractor: Boh Bros. Construction Co., LLC. | Miles: 2.90 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-03-17 | $3,004,254 | 2009-01-16 |
| Yscloskey Bridge Rehabilitation- Hurricane Katrina | |
| 284-02-0035 - Moveable bridges reconditioned | |
| Proj. Engr: Zzz Marsalone, Lynn | Route: |
| Contractor: Coastal Bridge Co., L.L.C. | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2007-01-22 | $1,367,974 | 2008-01-20 |
| LA 3238 (La 46-La 39) | |
| 844-05-0004 - Asphalt overlay of asphalt pavement | |
| Proj. Engr: Guidry, John | Route: LA 3238 |
| Contractor: Boh Bros. Construction Co., LLC. | Miles: 0.54 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-02-28 | $337,482 | 2008-06-10 |
St. Charles Parish
Note: The estimated completion date is based on the work order date and the contract days allowed.
| I-10 - North End of Mississippi River Bridge | |
| 450-36-0033 - Asphalt overlay of asphalt pavement | |
| Proj. Engr: Duplantis, Michael | Route: I-310 |
| Contractor: Barriere Construction Co., LLC | Miles: 6.93 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-03-03 | $735,660 | 2008-07-14 |
| Miss. River Bridge(Luling) Deck Test Section & Joint Repairs | |
| 450-37-0020 - Bridges reconditioned | |
| Proj. Engr: Hansen, Osmond | Route: I-310 |
| Contractor: Boh Bros. Construction Co., LLC. | Miles: 0.52 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2004-09-10 | $1,213,927 | 2004-11-12 |
Terrebonne Parish
Note: The estimated completion date is based on the work order date and the contract days allowed.
| LA 659, La 3087 - La 24 | |
| 855-04-0056 - Asphalt overlay of asphalt pavement | |
| Proj. Engr: Weber, Alan | Route: LA 659 |
| Contractor: Barriere Construction Co., LLC | Miles: 2.71 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-01-02 | $1,362,032 | 2008-07-02 |
| LA 665 Permanent Repair (La 55 - Cutoff Canal) | |
| 855-09-0019 - Asphalt overlay of asphalt pavement | |
| Proj. Engr: Weber, Alan | Route: LA 665 |
| Contractor: Huey Stockstill, Inc. | Miles: 7.40 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-03-05 | $1,592,976 | 2008-10-24 |
District 02
No districtwide projects.