Projects Under Construction
District 62
Updated 16 May 2012
Districtwide Projects
Livingston Parish
Note: The estimated completion date is based on the work order date and the contract days allowed.
| I-12/La 441 Interchange Landscaping | |
| H.003421.6 - Landscaping | |
| Proj. Engr: Wascom, Kris | Route: |
| Contractor: Hard Rock Construction LLC | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2012-04-27 | $256,568 | 2012-08-27 |
| Eden Church Road | |
| H.006554.6 - Miscellaneous | |
| Proj. Engr: Knight, Edward | Route: |
| Contractor: F.G. Sullivan, Jr. Contractor | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2012-01-25 | $2,344,973 | 2012-11-13 |
| Firetower Road to 0.830 Mile Se La 22 | |
| H.008182.6 - Asph concrete ovly over in place stabilized/cement treated base course | |
| Proj. Engr: Wascom, Kris | Route: LA 1037 |
| Contractor: Gilchrist Construction Co. LLC | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2012-04-22 | $3,371,716 | 2012-12-01 |
| I-12: Landscaping Beautification | |
| H.009070.6 - Landscaping | |
| Proj. Engr: Wascom, Kris | Route: |
| Contractor: Task Force LLC | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-12-15 | $48,491 | 2012-01-31 |
| Tate Road Widening and Overlay | |
| H.009117.6 - Asphalt widening and overlay | |
| Proj. Engr: Belden, Cory | Route: |
| Contractor: F.G. Sullivan, Jr. Contractor | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2012-01-03 | $361,565 | 2012-04-04 |
| I-12: Satsuma Interchange Exit Ramp Improvements | |
| H.009311.6 - Traffic flow improvements - formerly turn lanes | |
| Proj. Engr: Wascom, Kris | Route: |
| Contractor: Richard Price Contracting Co, | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2012-03-17 | $437,785 | 2012-06-17 |
| Port Vincent Br New Grid Floor | |
| H.971897 - Moveable bridges reconditioned | |
| Proj. Engr: Wascom, Kris | Route: |
| Contractor: Boh Bros. Construction Co., Ll | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2012-03-23 | $457,925 | 2012-05-22 |
| District 62 Patch & Overlay Projects In S. Livingston Parish | |
| 013-06-0055 - Asphalt overlay of asphalt pavement | |
| Proj. Engr: Wascom, Kris | Route: US 190 |
| Contractor: Barriere Construction Co., LLC | Miles: 0.41 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-08-01 | $8,543,269 | 2012-08-09 |
| Amite River Bridge @ Magnolia | |
| 262-31-0016 - New location/replacement of bridge | |
| Proj. Engr: Wascom, Kris | Route: LA 64 |
| Contractor: L & a Contracting Co. | Miles: 0.84 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2010-09-03 | $20,322,729 | 2012-12-15 |
| Walker Landscaping Project | |
| 268-01-0015 - Miscellaneous | |
| Proj. Engr: Zzzz Hollowell, Clay | Route: LA 447 I-12 |
| Contractor: Twin Shores Lands. & Const Serv I | Miles: 1.30 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2009-03-23 | $213,013 | 2009-07-23 |
| Safe Routes to School Walker Sidewalk Project | |
| 273-03-0030 - Sidewalks/bike paths | |
| Proj. Engr: Duenckel, Tom | Route: LA 1027 |
| Contractor: Dqsi, Corporation | Miles: 0.50 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2010-10-06 | $235,827 | 2011-02-25 |
| LA 40: Jct. La 43 - West Jct. I-55 | |
| 415-01-0007 - Asphalt overlay of asphalt pavement | |
| Proj. Engr: Perilloux, Steve | Route: LA 40 |
| Contractor: Diamond B Construction Co., L. | Miles: 3.13 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2012-01-26 | $2,499,517 | 2012-08-05 |
| I-12 Widening O'neal to Range | |
| 454-01-0047 - Concrete new pavement | |
| Proj. Engr: Weick, Wayne | Route: I-12 |
| Contractor: James Construction Group | Miles: 1.91 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2008-12-30 | $110,916,762 | 2012-09-08 |
| Interstate 12 Widening | |
| 454-02-0071 - Miscellaneous | |
| Proj. Engr: Weick, Wayne | Route: I-12 |
| Contractor: | Miles: 2.08 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2010-04-28 | $36,721,210 | 2014-03-26 |
| LA 1026 - La 447 | |
| 454-02-0074 - Asphalt widening and overlay | |
| Proj. Engr: Wascom, Kris | Route: I-12 |
| Contractor: Barriere Construction Co., LLC | Miles: 3.20 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-11-04 | $21,946,038 | 2013-02-23 |
St. Helena Parish
Note: The estimated completion date is based on the work order date and the contract days allowed.
| Willie Redden Road - South Jct. La 37 | |
| H.001365.6 - Asphalt overlay of asphalt pavement | |
| Proj. Engr: Wascom, Kris | Route: LA 10 |
| Contractor: Barriere Construction Co., LLC | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-12-23 | $2,140,573 | 2012-05-13 |
| Tickfaw River and Relief Bridges | |
| H.002410.6 - New location/replacement of bridge | |
| Proj. Engr: Perilloux, Steve | Route: |
| Contractor: James Construction Group LLC | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2012-01-07 | $5,433,884 | 2013-12-04 |
| Jct. La 1045 - Jct. La 10 | |
| 270-05-0015 - Asph concrete ovly over in place stabilized/cement treated base course | |
| Proj. Engr: Wascom, Kris | Route: LA 43 |
| Contractor: Diamond B Construction Co., L. | Miles: 4.91 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-06-23 | $2,009,387 | 2011-12-24 |
| Joseph Branch, Beaver Creek Branch, and Chaney Creek Bridges | |
| 713-46-0104 - New location/replacement of bridge | |
| Proj. Engr: Perilloux, Steve | Route: |
| Contractor: C W & W Contractors, Inc. | Miles: 0.01 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2012-03-23 | $1,162,126 | 2012-12-31 |
| Lindsey Road Bridge Over Joseph Branch | |
| 713-46-0110 - New location/replacement of bridge | |
| Proj. Engr: Wascom, Kris | Route: |
| Contractor: Jb James Construction LLC | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2012-02-22 | $424,430 | 2012-08-02 |
St. John Baptist Parish
Note: The estimated completion date is based on the work order date and the contract days allowed.
| St John Eastbank Mississippi River Multi-Use Trail, Phase II | |
| H.007559.6 - Sidewalks/bike paths | |
| Proj. Engr: Perilloux, Steve | Route: |
| Contractor: Barriere Construction Co., LLC | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2012-01-30 | $897,771 | 2012-06-30 |
| US 61 Signal Upgrades | |
| 007-02-0097 - Signalization | |
| Proj. Engr: Perilloux, Steve | Route: US 61 |
| Contractor: Jack B. Harper Contractor, Inc. | Miles: 30.98 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2009-09-03 | $4,914,723 | 2011-05-02 |
| US 51: US 61 - Main Street | |
| 256-12-0002 - Asphalt overlay of asphalt pavement | |
| Proj. Engr: Perilloux, Steve | Route: US 51 |
| Contractor: Barriere Construction Co., LLC | Miles: 1.90 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-12-26 | $1,838,399 | 2012-04-26 |
| Interchange Lighting I-10 @ La 3188 (Belle Terre) | |
| 450-13-0049 - Roadway lighting | |
| Proj. Engr: Perilloux, Steve | Route: I-10 |
| Contractor: Diamond Electrical Co., Inc. | Miles: 1.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-07-18 | $581,476 | 2012-08-09 |
St. Tammany Parish
Note: The estimated completion date is based on the work order date and the contract days allowed.
| LA 21: La 1084 - La 1083 | |
| H.001004.6 - Asphalt overlay of asphalt pavement | |
| Proj. Engr: Sharp, Larry Jr | Route: LA 21 |
| Contractor: Huey Stockstill, Inc. | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2012-04-23 | $1,035,382 | 2012-08-13 |
| Slidell Welcome Center Courtyard Landscaping | |
| H.003651.6 - Landscaping | |
| Proj. Engr: Sharp, Larry Jr | Route: |
| Contractor: Jjh Construction Co. LLC | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2012-01-10 | $307,655 | 2012-07-10 |
| District 62 Guard Rail Replacement | |
| H.009065 - Guardrails | |
| Proj. Engr: Hickman, Tommy Jr. | Route: |
| Contractor: Command Construction Industrie | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-08-08 | $478,923 | 2012-02-26 |
| Left Turn Lane US 11 at La 41 & La 3081 | |
| H.009108.6 - Asphalt widening and overlay | |
| Proj. Engr: Sharp, Larry Jr | Route: |
| Contractor: Barriere Construction Co., LLC | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2012-03-26 | $146,464 | 2012-06-26 |
| LA 21:access Control Pinnacle Pkwy. - Bootlegger Rd. | |
| H.009265.6 - Traffic flow improvements - formerly turn lanes | |
| Proj. Engr: Sharp, Larry Jr | Route: |
| Contractor: Kort's Trucking Inc. | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-12-30 | $454,235 | 2012-06-14 |
| LA 22 to Bayou Castine | |
| 013-12-0032 - Concrete new pavement | |
| Proj. Engr: Sharp, Larry Jr | Route: US 190 LA 1087 LA 59 |
| Contractor: Boh Bros. Construction Co., LLC. | Miles: 4.80 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2006-10-16 | $28,874,385 | 2009-05-21 |
| US 190 Corridor Landscaping and Sidewalks | |
| 013-12-0058 - Landscaping | |
| Proj. Engr: Sharp, Larry Jr | Route: US 190 |
| Contractor: Jjh Construction Co. LLC | Miles: 0.93 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2010-08-16 | $261,198 | 2011-01-29 |
| US 190 Bridges Near Slidell | |
| 013-13-0030 - New location/replacement of bridge | |
| Proj. Engr: Sharp, Larry Jr | Route: US 190-B US 190 |
| Contractor: James Construction Group LLC | Miles: 4.20 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2012-02-14 | $2,144,327 | 2012-12-03 |
| Interchange Improvements US Highway 11 and Ramp Improvements | |
| 018-04-0046 - Clearing and grubbing | |
| Proj. Engr: Hickman, Tommy Jr. | Route: US 11 I-12 |
| Contractor: Barriere Construction Co., LLC. | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2009-09-25 | $6,027,778 | 2011-01-15 |
| LA 433 @ Voters Road Intersection Improvements | |
| 018-30-0025 - Traffic flow improvements - formerly turn lanes | |
| Proj. Engr: Luton, Loyd | Route: LA 433 |
| Contractor: Barriere Construction Co., LLC | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2010-08-09 | $1,801,186 | 2011-08-20 |
| Tangipahoa Parish Line - S. Jct. La 25 | |
| 269-07-0011 - Asphalt overlay of asphalt pavement | |
| Proj. Engr: Sharp, Larry Jr | Route: LA 40 |
| Contractor: Diamond B Construction Co., L. | Miles: 4.21 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2012-01-03 | $2,528,703 | 2012-12-12 |
| Jct. La 36 - Double Creek Bridge | |
| 281-04-0027 - Asphalt overlay of asphalt pavement | |
| Proj. Engr: Sharp, Larry Jr | Route: LA 435 |
| Contractor: Diamond B Construction Co., L. | Miles: 7.53 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2010-12-13 | $3,061,465 | 2011-10-20 |
| Double Creek Bridge - Jct. La 41 | |
| 281-04-0028 - Asph concrete ovly over in place stabilized/cement treated base course | |
| Proj. Engr: Sharp, Larry Jr | Route: LA 435 |
| Contractor: Huey Stockstill, Inc. | Miles: 3.97 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-08-08 | $2,180,445 | 2012-02-26 |
| I-10 Bridge Over Lake Pontchartrain | |
| 450-17-0025 - New location/replacement of bridge | |
| Proj. Engr: Zzzz Horn, John | Route: I-10 |
| Contractor: Boh Bros. Construction Co., LLC. | Miles: 1.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2006-06-01 | $432,551,194 | 2012-06-18 |
| LA 1088 Interchange/ Route I-12 | |
| 454-04-0038 - Concrete new pavement | |
| Proj. Engr: Sharp, Larry Jr | Route: |
| Contractor: Barriere Construction Co., LLC | Miles: 0.10 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2009-10-25 | $13,695,777 | 2011-05-28 |
| Airport Rd. - I-10 | |
| 454-04-0080 - Asphalt widening and overlay | |
| Proj. Engr: Sharp, Larry Jr | Route: I-12 |
| Contractor: James Construction Group LLC | Miles: 6.15 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2010-11-30 | $25,881,045 | 2012-04-29 |
| Fitzgerald Church Road Bridge | |
| 713-52-0104 - New location/replacement of bridge | |
| Proj. Engr: Sharp, Larry Jr | Route: |
| Contractor: Guinn Brothers, LLC. | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-12-05 | $386,489 | 2012-06-04 |
| Urban Systems Project - Intersection Improvements | |
| 852-25-0017 - Traffic flow improvements - formerly turn lanes | |
| Proj. Engr: Sanford, Kristi | Route: LA 1091 |
| Contractor: Rcs Contractors, Inc. | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2010-07-19 | $1,413,483 | 2011-03-09 |
| LA 1090 at Brownswitch | |
| 852-26-0017 - Traffic flow improvements - formerly turn lanes | |
| Proj. Engr: Sanford, Kristi | Route: LA 1090 |
| Contractor: Three C's Properties Inc | Miles: 0.19 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2010-08-02 | $652,169 | 2011-02-04 |
Tangipahoa Parish
Note: The estimated completion date is based on the work order date and the contract days allowed.
| LA 16 and Laurel Drainage Improvements | |
| H.001207 - Drainage | |
| Proj. Engr: Perilloux, Steve | Route: LA 16 |
| Contractor: Industrial Enterprises, Inc. | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-07-25 | $136,574 | 2011-10-04 |
| Hammond Junior High Sidewalk Project | |
| H.006606.6 - Sidewalks/bike paths | |
| Proj. Engr: Sanford, Kristi | Route: |
| Contractor: Stranco, Inc. | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2012-01-03 | $123,843 | 2012-05-04 |
| Independence Safe Routes to School Project | |
| H.006608.6 - Sidewalks/bike paths | |
| Proj. Engr: Bates, Kiley | Route: |
| Contractor: LA Contracting Enterprises LLC | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-11-30 | $309,150 | 2012-03-31 |
| District 62 Chip Seal Projects | |
| H.009164.6 - Asphalt surface treatment | |
| Proj. Engr: Hickman, Tommy Jr. | Route: LA 1054 |
| Contractor: T. L. Wallace Construction, In | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2012-03-26 | $567,627 | 2012-07-06 |
| LA 40: Jct. La 43 - West Jct. I-55 | |
| 415-01-0007 - Asphalt overlay of asphalt pavement | |
| Proj. Engr: Perilloux, Steve | Route: LA 40 |
| Contractor: Diamond B Construction Co., L. | Miles: 2.45 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2012-01-26 | $2,499,517 | 2012-08-05 |
| Jct. US 51 - Jct. La 40 | |
| 452-90-0155 - Asphaltic concrete overlay of rubblized pavement | |
| Proj. Engr: Perilloux, Steve | Route: I-55 |
| Contractor: Barriere Construction Co., LLC | Miles: 8.35 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-02-01 | $33,011,985 | 2012-02-03 |
| Jct. La 40 - Jct. La 16 Rubblize and Overlay | |
| 452-90-0160 - Asphaltic concrete overlay of rubblized pavement | |
| Proj. Engr: Perilloux, Steve | Route: I-55 |
| Contractor: Diamond B Construction Co., L. | Miles: 6.34 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2010-10-15 | $14,716,429 | 2011-08-21 |
| I-12 at La 3158 (S. Airport) | |
| 454-03-0069 - Roadway lighting | |
| Proj. Engr: Perilloux, Steve | Route: I-12 |
| Contractor: Diamond Electrical Co., Inc. | Miles: 1.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2009-08-08 | $513,145 | 2010-05-12 |
| Junction US 51 - St. Tammany Parish Line | |
| 454-03-0075 - Asphalt overlay of asphalt pavement | |
| Proj. Engr: Perilloux, Steve | Route: I-12 |
| Contractor: Diamond B Construction Co., L. | Miles: 12.68 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-09-18 | $10,527,883 | 2012-03-04 |
| Rest Area Improvements I-55 at Kentwood | |
| 690-02-0006 - Rest areas | |
| Proj. Engr: Perilloux, Steve | Route: I-55 |
| Contractor: Byron E. Talbot Contractor, In | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-09-19 | $7,177,950 | 2012-11-01 |
| Beaver Creek Scour Repair | |
| 853-03-0010 - Miscellaneous | |
| Proj. Engr: Perilloux, Steve | Route: LA 1051 |
| Contractor: Gibbs & Register Inc | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-07-28 | $490,337 | 2011-10-17 |
Washington Parish
Note: The estimated completion date is based on the work order date and the contract days allowed.
| LA 438: La 430 - La 62 | |
| H.002461.6 - Asph concrete ovly over in place stabilized/cement treated base course | |
| Proj. Engr: Hickman, Tommy Jr. | Route: LA 438 |
| Contractor: Barriere Construction Co., LLC | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-11-01 | $4,377,000 | 2012-07-31 |
| Isabel Swamp Road (Parish Line to Bogue Chitto Bridge) | |
| H.006625.6 - Asphalt new pavement-new roadway/new alignments | |
| Proj. Engr: Murray, Will | Route: |
| Contractor: Barriere Construction Co., LLC | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-09-01 | $290,484 | 2011-11-11 |
| LA 1075: La 1074 - La 60 | |
| H.008459.6 - Asph concrete ovly over in place stabilized/cement treated base course | |
| Proj. Engr: Hickman, Tommy Jr. | Route: LA 438 |
| Contractor: Huey Stockstill, Inc. | Miles: 0.00 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-12-19 | $1,830,008 | 2012-07-19 |
| End of Concrete Section - Jct. La 10 | |
| 030-03-0022 - Portland Cement Pavement patch | |
| Proj. Engr: Hickman, Tommy Jr. | Route: LA 21 |
| Contractor: Rcs Contractors, Inc. | Miles: 2.41 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-05-18 | $700,831 | 2012-02-25 |
| Jct. La 10 - N. Jct. La 436 | |
| 030-04-0029 - Asphalt overlay of asphalt pavement | |
| Proj. Engr: Hickman, Tommy Jr. | Route: LA 21 |
| Contractor: Diamond B Construction Co., L. | Miles: 6.51 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-01-12 | $3,257,996 | 2011-08-11 |
| N. Jct. La 436 - Jct. La 1071 | |
| 030-04-0031 - Asphalt overlay of asphalt pavement | |
| Proj. Engr: Hickman, Tommy Jr. | Route: LA 21 |
| Contractor: Diamond B Construction Co., L. | Miles: 6.02 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2010-10-13 | $3,556,300 | 2011-07-01 |
| Continuous Center Turnlane In Franklinton | |
| 047-02-0033 - Asphalt overlay of asphalt pavement | |
| Proj. Engr: Hickman, Tommy Jr. | Route: LA 10 |
| Contractor: Barriere Construction Co., LLC | Miles: 0.05 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-02-01 | $322,161 | 2011-05-04 |
| LA 1056: La 450 - La 440 | |
| 859-06-0005 - Asphalt overlay of asphalt pavement | |
| Proj. Engr: Hickman, Tommy Jr. | Route: LA 1056 |
| Contractor: Barriere Construction Co., LLC | Miles: 5.90 |
| Work Order Date | Contract Amount | Estimated Completion Date | |
|---|---|---|---|
| 2011-12-01 | $3,667,000 | 2012-08-20 |