LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT
Search Help

US 190 - Amite River Bridge Project

Project Details:
State Proj. No.: 013-06-0032
Start date: December 2007
Finish date: December 2010
Cost: $29.5 Million
Contractor: James Construction
US 190 - Amite River Bridge Project:

The Amite River bridge project is 1.2 miles in length along U.S. 190 (Florida Boulevard) beginning at La. 426 (Old Hammond Highway) and ending approximately a quarter of a mile west of La. 1032 (South River Road). Currently, this section of U.S. 190 serves nearly 26,000 vehicles per day.

The project will be built to the north of the existing bridges. The bridge will consist of two continuous spans, 2,900 feet long and 40 feet wide.

Each span will have two 12-foot lanes, a 10-foot outside shoulder, and a 4-foot inside shoulder.

The contractor will maintain two lanes of traffic in each direction throughout the duration of the project.

To receive periodic e-mail updates on this project, e-mail or call 1-877-4LA-DOTD (452-3683) and we will add you to the list.




Project Gallery

 
   Thursday, August 21, 2008
CONTACTS LINKS SITE MAP
The La DOTD Headquarters Building is located at 1201 Capitol Access Road, Baton Rouge, LA, 70804-9245. Telephone: (225) 379-1232.
Please send us your Comments or Suggestions.