TBD |
IDIQ Dam Safety |
Li Yang |
Engineering and Related Services |
03/16/2023 |
03/16/2023 |
2nd Quarter 2023 |
Dam Inspection, Mitigation plan, surveying services,
property ownership research, geotechnical analysis, hydraulic and hydrologic
evaluation and design, structural design, water resource design, plans
preparations, construction support, community outreach workshops, and updating
Emergency Action Plans (EAP). |
H.015018
|
Entity: Lafayette Parish Non-State PVMT Markings |
Ryan Richard |
CE&I |
03/08/2023 |
03/08/2023 |
2nd Quarter 2023 |
Restripe 5 local roads in Lafayette Parish |
TBD |
SHSP North Shore
Regional Safety Coalition Coordinator |
Autumn
Goodfellow-Thompson |
Planning |
02/22/2023 |
02/22/2023 |
1st Quarter 2023
|
Implement and sustain
the SHSP in North Shore, Louisiana Region |
TBD |
SHSP New Orleans
Regional Safety Coalition Coordinator |
Autumn
Goodfellow-Thompson |
Planning |
02/22/2023 |
02/22/2023 |
1st Quarter 2023 |
Implement and sustain
the SHSP in New Orleans, Louisiana Region |
44-26839 H.014317 |
Entity: Carey St Pavement Rehabilitation (CE&I) |
Ryan Richard |
Engineering and Related Services |
01/26/2023 |
03/20/2023 |
1st Quarter 2023 |
Rehabilitate PCCP on Carey Street from Old
Spanish Trail to Front Street in Slidell. |
TBD |
IDIQ (3) Bridge Load Rating Services |
Dana Feng |
Engineering and Related Services |
1/17/2023 |
1/17/2023 |
1st Quarter 2023 |
Stage 0, Stage 3, Stage 5 Services (Including In-Depth Bridge Inspection & Evaluation; Analysis & Load Rating; Load Posting Optimization; Repair/Rehab Design and Plan Development; Testing, Sampling, Instrumentation, and Health Monitoring Services) |
TBD |
IDIQ for Engineering and Technical Support Services for Critical Projects |
Peggy Jo Paine |
Engineering and Technical Support Services |
12/13/2022 |
12/13/2022 |
1st Quarter 2023 |
Provide Engineering and Technical Support Services. |
TBD |
Electric Vehicle (EV) Infrastructure Program |
Joy Johnson |
Engineering and Related Services |
11/21/2022 |
11/21/2022 |
1st Quarter 2023 |
Provide physical on-site inspections, data collection, gathering reports from EV charging station owners and submitting data/reports to DOTD. |
TBD |
IDIQ for Intelligent Transportation Systems (ITS) Management, Operations and Maintenance Engineering & Inspection (ME&I) |
Roy Esteven |
Engineering and Related Services |
12/2/2022 |
03/20/2023 |
2nd Quarter 2023 |
Perform ME&I of ITS devices and equipment statewide, such as, DMSs, CCTVs, and other ITS devices installed along the roadway. |
TBD |
IDIQ Contract for Right of Way Services |
Charles McBride |
Right of Way Services - Forester Statewide |
6/22/2022 |
12/19/2022 |
1st Quarter 2023 |
Forestry Services |
TBD |
IDIQ Right of Way Services Statewide |
Charles McBride |
Right of Way Services |
1/28/2022 |
12/19/2022 |
1st Quarter 2023 |
Appraisal Services |
44-26910 - 44-26911 |
IDIQ (2) Design for Safety Projects Statewide Majority of work in Districts 02, 61 and 62 |
Laura Riggs |
Engineering and Related Services |
4/8/2021 |
03/20/2023 |
2nd Quarter 2024
|
Perform engineering and related services to provide design services for the Highway Safety Improvement Plan |
44-26028 H.012311 |
LA 429 Connector (LA 30/LA 73 to US 61) |
Kurt Brauner |
Engineering and Related Services |
12/9/2020 |
03/20/2023 |
1st Quarter 2023
|
Provide IJR and NEPA Documentation for an anticipated EA |
H.010253.5 |
Entity: Bluebonnet Pump Station Improvements |
Sarah Golz |
CE&I Services related to the upgrade of key architectural, mechanical, and electrical systems |
9/13/2021 |
12/19/2022 |
1st Quarter 2023
|
CE&I Services |
44-26585H.006226 |
Entity: Pointe-A-La-Hache Ferry Landing Replacement |
Steven Sibley |
Engineering and Related Services |
8/24/2021 |
03/20/2023 |
1st Quarter 2023 |
This project consists of surveying, designing (road design, geotechnical, bridge structural design, and electrical/mechanical design), environmental permitting, and construction support to construct two (2) new ferry landings located in Plaquemines Parish, LA (Pointe-A-La-Hache) - one on each side of the Mississippi River approximately 1/4 mile upstream of the current ferry location. |
H.011972 |
LA 3040: ICW Houma Tunnel Rehabilitation |
Valerie Tourres |
Engineering and Related Services |
03/31/2021 |
12/19/2022 |
1st Quarter 2023 |
Provide preliminary and final design, construction plans, construction engineering support and related services for the civil, mechanical, structural, and electrical rehabilitation of the Houma Tunnel |
44-26027H.003771 |
I-10 at LA 74 |
Kurt Brauner |
Engineering and Related Services |
1/12/2021 |
03/20/2023 |
1st Quarter 2023
|
Provide IJR and NEPA Documentation for an anticipated EA |
H.012012 |
Entity: Ridgewood/ Stroelitz (Airline to Loumor) |
Joe Brown |
Engineering and Related Services |
8/2/2021 |
12/19/2022 |
1st Quarter 2023
|
CE&I Services - concrete overlay |
H.010753 |
I-310/US 90 Interchange |
Corey Landry |
Engineering and Related Services |
2/18/2022 |
12/19/2022 |
1st Quarter 2023
|
Preliminary and Final Plans, Geotechnical Engineering, Construction Support |
H.012004 H.014059 |
US 80: Alligator Bayou Bridges; US 80: Bridges Near Minden |
Ryan Rodney |
Engineering and Related Services |
6/7/2021 |
02/15/2023 |
2nd Quarter 2023
|
Replacement of Recall Nos. 012090,
012100, 012190, 012200, 018860, and 018920. Environmental Services, Geotechnical Services, Surveying Services, Roadway Preliminary and Final Plans, Bridge Preliminary and Final Plans
|
H.012398 & H.012382
|
US 190 at LA 25 Roundabout (Ph 2A) & US 190: LA 25 to Bogue Falaya (Ph 2B) |
Corey Landry |
Engineering and Related Services |
2/18/2022 |
12/19/2022 |
1st Quarter 2023 |
Preliminary and Final Plans, Geotechnical Engineering, Construction Support |
TBD |
IDIQ (2) Painting Inspection and Environmental Monitoring |
Greg Coco |
Engineering and Related Services |
10/20/2022 |
12/19/2022 |
1st Quarter 2023
|
CE&I Services |
H.015373 |
LRSP and SRTPP Program Mgmt: 2023-2027 |
Laura Riggs |
Engineering and Related Services |
10/18/2022 |
12/19/2022 |
1st Quarter 2023 |
Program Management |
44-26912 |
IDIQ Design for Safety Projects Statewide with Majority of Work in Districts 03, 07, and 08 |
Laura Riggs |
Engineering and Related Services |
10/18/2022 |
03/20/2023 |
2nd Quarter 2023 |
Perform engineering and related services to provide design services for the Highway Safety Program |
44-26913 |
IDIQ Design for Safety Projects Statewide with Majority of Work in Districts 04, 05, and 58 |
Laura Riggs |
Engineering and Related Services |
10/18/2022 |
03/20/2023 |
2nd Quarter 2023 |
Perform engineering and related services to provide design services for the Highway Safety Program |
H.014054, H.014056, and H.005184 |
I-69 Frontage Road |
Timothy Nickel |
Engineering and Related Services |
8/30/2022 |
12/19/2022 |
1st Quarter 2023 |
Preliminary and Final Plans, Geotechnical Engineering, Construction Support |
TBD |
IDIQ (5) Topographic Surveying Services |
Barrett Smith |
Engineering and Related Services |
8/16/2021 |
1/19/2022 |
1st Quarter 2023 |
Topographic Surveying Services |
TBD |
US 167 Interchange @ Willow Street |
Timothy Nickel |
Design-Build Services |
8/30/2022 |
10/13/2022 |
Issuance of NOI 4th Quarter 2022 |
Design and Construction |
H.012008
H.012009 |
US 71: ICG Railroad Overpass Rehab (HBI)
US 71: Market St. Bridge over ICG RR (HBI) |
Valerie Tourres |
Engineering and Related Services |
7/19/2021 |
7/26/2022 |
1st Quarter 2023 |
Survey, Geotechnical Services, Traffic Engineering, Preliminary and Final Design, Construction Engineering Support and related services for the replacement of two southbound bridges and rehabilitation of one northbound bridge located over the Kansas City Southern Railroad |
H.012295 |
LA 182 New Iberia Sidewalks |
Brian Nunes |
Engineering and Related Services |
1/5/2023 |
1/5/2023 |
2nd Quarter 2023 |
Preliminary and Final Plans |
H.014362 |
Lake Road - Big Branch Marsh NWR |
Brian Nunes |
Engineering and Related Services |
1/5/2023 |
1/5/2023 |
2nd Quarter 2023 |
Perform engineering and related services to provide preliminary and final plans for the rehabilitation of Lake Road in the Big Branch Marsh NWR
|
TBD |
IDIQ (4) Design for Transportation Alternatives Program (TAP) Projects Statewide |
Brian Nunes |
Engineering and Related Services |
1/5/2023 |
1/5/2023 |
2nd Quarter 2023 |
Perform engineering and related services to provide design services for the Transportation Alternatives Program
|
TBD |
IDIQ Construction Engineering and Inspection for Transportation Alternatives Program (TAP) Projects Statewide with Majority of Work in Districts 04, 05, and 58
|
Brian Nunes |
Engineering and Related Services |
1/5/2023 |
1/5/2023 |
2nd Quarter 2023 |
Perform engineering and related services to provide construction engineering and inspection services for the Transportation Alternatives Program |
TBD |
IDIQ Construction Engineering and Inspection for Transportation Alternatives Program (TAP) Projects Statewide with Majority of Work in Districts 03, 07, and 08 |
Brian Nunes |
Engineering and Related Services |
1/5/2023 |
1/5/2023 |
2nd Quarter 2023 |
Perform engineering and related services to provide construction engineering and inspection services for the Transportation Alternatives Program |
TBD |
IDIQ Construction Engineering and Inspection for Transportation Alternatives Program (TAP) Projects Statewide with Majority of Work in Districts 02, 61, and 62 |
Brian Nunes |
Engineering and Related Services |
1/5/2023 |
1/5/2023 |
2nd Quarter 2023 |
Perform engineering and related services to provide construction engineering and inspection services for the Transportation Alternatives Program |
H.000263 |
Chef Menteur Pass Bridge & Approach |
Kurt Brauner |
Engineering and Related Services |
12/19/2022 |
12/19/2022 |
2nd Quarter 2023 |
Bridge Replacement and Design |
TBD |
IDIQ Environmental |
Rhonda Braud |
Environmental and Biological Services |
9/19/2022 |
9/19/2022 |
2nd Quarter 2023 |
Environmental Permits, Wetland Findings, and Biological Assessments |
TBD |
US 167 Interchange @ Willow Street |
Timothy Nickel |
Owner Verification |
8/30/2022 |
9/12/2022 |
2nd Quarter 2023 |
Owner Verification Services |
44-26073 - 44-26074 |
IDIQ (2) Contracts for Electrical Services |
Agnes Fung |
Engineering and Related Services |
8/25/2022 |
12/19/2022 |
2nd Quarter 2023 |
Topographic Survey, Preliminary and Final Plans, and Construction Related Engineering Services |
H.014919 |
Wax Road Ext.: LA 408 to LA 3034 |
D'lon Spurlock |
Engineering and Related Services |
8/3/2022 |
8/3/2022 |
2nd Quarter 2023 |
Roadway Preliminary and Final Plans |